Ventilation Aluminum Insulated Flexible Duct

Ref Price:
Loading Port:
Guangzhou
Payment Terms:
TT or LC
Min Order Qty:
-
Supply Capability:
80000m m/month
Inquire Now Customer Service

Contact us by

(1) WeChat
(2) Whatsapp: +8618101089932

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1.Structure of Aluminum Flexible Duct for HVAC

Aluminum Flexible Duct is widely used in Heating, Cooling, and Air Conditioning (HVAC) systems for air ventilation    applications. Flexible Duct provides greater thermal efficiency to save energy. Because it is flexible, it is easy to run  around and through obstacles in the building.

Flexible Duct Usage:

-Applied in air conditioning/ventilation systems

-Tear and puncture resistant

-Corrosion resistant

-High flexibility

-Convenient installation

-No toxic gas emission

2.Main Features of Aluminum Flexible Duct for HVAC

1. It's a range of fully flexible un-insulated aluminum PVC laminated ducting, it is easy to connect to ducting

2. Highly flexible

3. Excellent resistance to chemicals

4. Small bending radius

3. Aluminum Flexible Duct for HVAC Images

 

4. Aluminum Flexible Duct for HVAC Specification

PROPERTIES

VALUE

DIARANGEMETER

80~1200MM(3”~48’’)

TEMPERATURE RANGE

-30~+250

VELOCITY OF AIR FLOW (MAX)

20 m/s

WORKING PRESSURE

2500 Pa

BENDING RADIUS

0.54*D

STANDARD LENGTH

7.6M OR 10M

5.FAQ

We have organized several common questions for our clientsmay help you sincerely

 ①What’s the Application for the products?

Flexible Duct is widely used in Heating, Cooling, and Air Conditioning (HVAC) systems for air ventilation    applications. Flexible Duct provides greater thermal efficiency to save energy. Because it is flexible,it is easy to run  around and through obstacles in the building.

     What’s the Advantages for the products?

              No need special tools for cutting

  In case of fire no toxic gas are emitted

The product have been successfully tested for fire resistance

Can be bent in any direction

     How long can we receive the product after purchase?

In the purchase of product within two working days, We will arrange the factory delivery as soon as possible. The specific time of receiving is related to the state and position of customers. Commonly 7 to 10 working days can be served.

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Home 2 air conditioning is the cooling of electricity or heating electricity? How much power is spent in hours
No, polycyclic aromatic should be anthraquinone This is certainly not all of the hydrocarbons are carcinogenic
Q:The United States direct mail dyson hp01 Dyson air purification cooling machine triple in the country to warranty it
Embedded stove, such as the use of rubber tube connection, then the rubber tube in the platen, often subject to heat radiation easily aging; and aging, falling more difficult to find, so many local poisoning and other vicious accidents
Q:Gree air conditioning 50 heating and cooling mechanism heat when the host cooling network is how the matter
Can be small, according to your roof to do what material.
Q:Public building design, the building structure and water is generally designed by the Architectural Design Institute, air conditioning and ventilation is based on the design of the interior? Or first air conditioning ventilation?
Normal heat absorption is also due to poor ventilation (dirty) and air humidity so icing
Q:The installation method of ordinary air conditioner. The more detailed the better. Please thank you all
2.1.23 step distance liftheight the distance between the upper and lower horizontal axis of the axis of each other. 2.1.24 pole vertical (cross) distance longitudinal spacingofuprighttube Scaffolding vertical distance between adjacent rods. 2.1.25 Vertical distance transversespacingofuprighttube Scaffolding Horizontal distance between adjacent vertical rods, single row scaffolding for the outside pole axis to the wall distance.
Q:Do 3cm thick wall insulation how much kilogram of slurry and how many kilograms of polystyrene particles
You are talking about the construction measures it is not the house measures it, because the house has a construction of Huohuohuohuo number of leather and bronze sculpture drawings and specifications, high-rise building scaffolding should be lightning protection measures, that is, under the scaffolding around Reliable grounding (not less than four times, not less than 16 square copper core BV line), if it is pick plus, and the house can be connected to the pressure ring. Tower crane I will not say, upstairs has been said.
Q:Air to water heater host and air conditioning host is not the same
This test with a small sample length 127mm, width 12.7mm, the maximum thickness of 3.2mm. In the absence of ventilation test chamber. The top of the specimen (6.4 mm place) is clamped with a clamp on the bracket and the longitudinal axis of the specimen is kept vertical. The lower end of the specimen is 9.5mm from the lamp tip and 305mm from the dry absorbent cotton surface. Bring the Bunsen burner and adjust it to produce a blue flame with a height of 19mm. Place the Bunsen Lights flame at the bottom of the sample for 10s, then remove the flame (at least 152mm away from the specimen) and write down the sample. Burning time. If the flame of the sample within 30s after removal of the flame is extinguished, the original lamp must be moved under the specimen again, re-ignite the sample for 10s, and then remove the Bunsen burner again and note the flame burning And flames burning the burning time. If the sample droplets drip, let it fall into the sample under the 305mm cotton, to see whether it ignited cotton. If the absorbent cotton is on fire, the rating should be taken into account. Specific grading indicators are as follows. Test Item 94V-094V-194V-21 Ten-time ignition Total flame burning time Maximum value (S) Individual flame burning time Maximum value (s) Flameless burning time (s) Yes Flame drop No No Allow only short time Burning general UL yellow card on the thickness of the test strip is divided into: 1/8 inch, 1/16 inch, 1/32 inch thickness, that is, 3.2mm, 1.6mm, 0.8mm three grades test.
Q:HVAC Heating: What are the main components of the air distribution system?
Geothermal construction, the heating pipe spacing can not be less than 100mm, the construction can not be achieved, big brother!
Q:Air conditioning machine work when the sound is too much reason
Many of the good quality of the model, of course, bear some of the larger. Common scaffolding brackets are U-type care, "construction fastener steel scaffold safety technical regulations" (JGJ130-2011) provides "adjustable support bearing capacity design value should not be less than 40kN, support plate thickness should not be less than 5mm ", the general calculation using 30kN. Not to say how fast buckle steel scaffold can bear the load, but according to how much load to calculate how scaffolding erection. Need to be calculated. In the "construction of fasteners steel scaffold safety technical specifications" provides instructions. Double fastener (anti - skid) bearing capacity design value 3.2KN. Right angle fastener, rotary fastener (anti-skid) bearing capacity design value 8KN.
Q:Single cold air conditioning function can not change the cold and warm?
So good, then you recommend more. Give an address. You are not layman, too modest.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range
客服
live chat