• Tower Crane TC7135 Construction Equipment Building Machinery Distributor Sale System 1
  • Tower Crane TC7135 Construction Equipment Building Machinery Distributor Sale System 2
  • Tower Crane TC7135 Construction Equipment Building Machinery Distributor Sale System 3
  • Tower Crane TC7135 Construction Equipment Building Machinery Distributor Sale System 4
  • Tower Crane TC7135 Construction Equipment Building Machinery Distributor Sale System 5
  • Tower Crane TC7135 Construction Equipment Building Machinery Distributor Sale System 6
Tower Crane TC7135 Construction Equipment Building Machinery Distributor Sale

Tower Crane TC7135 Construction Equipment Building Machinery Distributor Sale

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
5 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Tower Crane TC7135 Description:

1.CMAX Tower Crane TC7135  is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

2. Tower Crane TC7135 can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.

3. Tower Crane TC7135 has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

4.Tower Crane TC7135  has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on. 

5.Tower Crane TC7135  has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.


Tower Crane TC7135 Parameter:

 Max. working range 71m, tip lifting weight 3.5T and Max. lifting weight 16T.

Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.

Trolleying mechanism can provide two operation speeds.

Free standing height (m) 50

Max height with attachment (m) 200

Working range can be adjusted (m) 50、55、60、65、71

Min working range (m) 2.5

Max lifting capacity (t) 16

Tip load @ 50m (t) 3.5

Tower Crane TC7135  Packaging & Delivery:

40HQ container

20~25days after deposit


Tower Crane TC7135 Diagram:

Tower Crane TC7135 Construction Equipment Building Machinery Distributor Sale

Tower Crane TC7135 Construction Equipment Building Machinery Distributor Sale

Tower Crane TC7135 Technical Sheet:

Tower Crane TC7135 Construction Equipment Building Machinery Distributor Sale

Tower Crane TC7135 FAQ:

1.What is tower crane?

Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.

2. What is the meaning of the tower crane’s code?

Take Tower Crane TC7135 for example, the first two letters “TC” means Tower Crane, “71”means jib length is 71 meter, and the last two letter “35” means the tip load is :3.5 ton.

3. What is the principal to quote the right tower crane to the client?

First, we need to know clients’ requirements,for example, max lifting capacity, height, tip load and jib length.. Second, we need to know what the foundation requirement from the client is and Third if there are special needs. CNBM could suggest proposal according to clear data provided by the clients.

Q: please tell me thats not what i think it is O_O
It probably is cranes bill unfortunately. You could always contact the manufacturer be sure. They should have a number somewhere on the packaging. Lots of animals are used in cosmetic products. Sharks, whales and other fish are commonly used in lipstick ground beetle shell is used in most kinds of makeup. All you can do is use it up, because if you waste it then that animal died for nothing. If it really creeps you out, give it to someone who would use it. If I were you, I wouldn't buy this primer again... :S Hope this helps xx
Q: I've always been puzzled how cranes operate.Because as buildings get taller so do cranes but i don't know how they increase the height of the cranes.Can you help answer this please?
search for others, animation and video of process more edit Some cranes actually climb the structure of the building and are taken apart when the building reaches its full height.
Q: I have to build a hydralic system that can pick up a paper clip . the supplies you are allowed to use are 10 straws, 5 pipe cleaners, 1 yard of masking tape. 10 note cards. 2 syringes and tubing. 5 rubber bands. 8 popsicle sticks. 2 feet of string. 1 magnet. Please help.
Obviously you must link the syringes with tubing, fill all with fluid, no air spaces, and then use the plunger in one to make plunger move in the other. That will be the hydraulic motion. You must make this motion to move the magnet up and down. How you construct the magnet holder to move the magnet by syringe action is up to you.
Q: i need to write a 2 pg paper on this, and i cant even begin
Stpehen Crane used interesting literary techniques such as colorful metaphors which can easily be identified in eg like knowing eyes which represent the people of Dunnet (ammons, 84). Another literary technique he uses often is irony which is seen in chapter with Mrs. Todds variety of personality which shows how Mrs. Todd has this varied personality(eden, 141). Other literary techniques shown are comparisons and contradictions, dramatic personification and powerful paradox.
Q: I'm folding 1000 origami cranes for my upcoming wedding. It's a tradition. I'm trying to find a website that can show me how to make the cranes into a large picture or an idea for a mobile. I found some sites that show pictures of each, but nothing with a how to on it.
from most of the pictures i saw, it seems pretty simple to figure out thinking of it logically. Origami cranes, string, wood sticks, Love and care. And with a bit of your own creativity and whatever supplies you can gather I think you will do a great thing. (making a paper crane now :)
Q: If the crane Dawkings refers to about natural selection is not operating or existing by chance, then some questions arise:1) who or what is operating the crane?2) if its self operating, how is it programmed to do so?3) who made the crane?And about designing the designer, No one did. Otherwise the crane would be lifting the operator of the crane into the crane. I guess the crane can operate by itself, but then stopped doing so when something designed the designer. Too many philosophical conundrums for me. The belief in an unified, and self-complete, creator is far less of a complex explanation than the 'crane' concept with all its requisite philosophical flamings hog's heads.
Bit by bit you may come to realise that complexity out of simplicity is much easier to comprehend than complexity from nowhere. The crane idea is from Daniel Dennet I think, and the boeing being assembled by chance is more or less what happened only bit by bit through evolution and natural selection. God is the complexity from nowhere to which I refer. Self-complete creator? did he make himself?
Q: These cranes always stay higher than the construction process but I have never seen how they are extended to stay above all of it. They come in two formats, free standing and those attached to the building. The possibilities that I thought of was that maybe they use another crane to lift the housing and the horisontal arm to put in more modules into the vertical part; or that they extend it by some way by putting modules in at the top or bottom and that the crane has some self-lifting mechanism to accommodate the insertion of more modules. However, I have never seen this being done, nor does the construction of these cranes point to its ability to do so. The only other possibility that I could think of was that the crane is set up at the outset to be higher than the completed height of the building, hence there is no need to extend it but this does not explain how they do it for very high buildings where the crane is attached to the building and seems to grow higher with the building.
The cranes are self erecting. The cranes tower is raised in sections. The lowest section is jacked up to the correct height and then a new section inserted and so on.
Q: What are equations /formulas that use to calculate maximum vertical load values, the maximum length of boom?
Hello, Briefly, the structure of the crane or lifting mechanism is not usually the limiting case. The limiting case is to ensure that the Center of Gravity of the mobile crane with the load is such that it is bound within the tires or footprint of the crane. If this load is outside the footprint, the crane tips over.
Q: i have 5 tower cranes outside my window at different construction sites and they all position their cranes the same direction at the end of the day. is there a reason for this.
I spent a year walking to work past a tower crane that was being used for a high rise apartment building in Philadelphia. I don't recall ever seeing it parked pointing in the same direction two days in a row.
Q: I am looking for guidance on determining the optimal design parameters for the design of an overhead travelling crane when considering a span of 60m and a lift requirement of 2500Tonnes. If not possible what would be the maximum lift for the same span
Is this for a nuclear power station? If 2500 Te and 60m really are the specified loads and span then it is likely that it will be used very seldom. In theory you can design for any load to be lifted but maintenance on a crane system that is used once a year (10 years?) is a real problem. The main items to consider are: Availability of winches and bogies which then dictates running beam and rail sizes. For the spanning beam several alternative sizes needed to be designed and then costed. It will be not just weight but transport costs that determine the most efficient sizes The overall height of the crane will then determine the required roof height assuming that the crane is under cover. For comparison the Harland and Wolf cranes in Belfast called Samson and Goliath can lift 840 Tonnes each. Overall design needs to consider speed of travel, acceleration and deceleration rates and a host of other things.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords