Swivel Scaffolding Swivel Couplers with Expected Performance

Ref Price:
Loading Port:
Payment Terms:
Min Order Qty:
15000 pc
Supply Capability:
300000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Quick Details:


Place of Origin:Hebei China

Model Number: GTJ-002

Type: Scaffolding Parts

Material: Q235

Weight: 0.58kg to 0.65kg

Surface Treament: as your requirements


Packaging & Delivery:



Delivery Detail: WITH IN 25 DAYS



Product Information


Product Name

Japanese Type Swivel Scaffolding Couplers






2.5mm or 3mm


0.58kg or 0.65kg

Surface Treatment

Electroplate Galvanized

Products’ standard

Fit for JISA8951


48.6   x 48.6mm



Product feature

anti-rust,   skid proof, high breaking strength

Swivel Scaffolding Swivel Couplers with Expected Performance

Cup-lock Scaffolding Specification:

  • Packaging Detail: vinner case,20ft,21T/GP,by sea;or welded on the cup lock vertical then bundle on steel pallet or Customer needs.

  • Delivery Detail: 1 month after the contract or as customer's requirement.


  • Three Year Warranty

  • Operating Friendly

  • Full Safety Devices

  • Provide OEM service

  • Reasonable price

Advantages of using CNBM coupler system

Increasingly, the use of mechanical couplers has been recognised by engineers and contractors to bring about benefits that can accelerate construction speed, increase productivity and simplify design details.

couplers save on lap lengths and could result in lower construction cost

Enhances construction speed by replacing the slow and tedious traditional methods of planting starter bars (e.g. boxing-out or drilling through formwork in wall construction, planting of starter bars into the soil in top-down construction)

Reduces congestion in lap zones, thus enhancing concrete flow.

FAQ of Ring-lock Scaffolding:

Consent Authority (BCA) for the issue of a Building Consent or a Code Compliance Certificate in relation to the Building Act 2004, as well as these Best Practice Guidelines, should be considered to ensure that all practicable steps are taken to assure the safety of the structures and of end users.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:examples of scaffolding?
Google these 1) Independent scaffold 2) Putlog scaffold 3) Birdcage scaffold
Q:Is it possible to use Boston Ivy as scaffolding for wisteria so one climbs up the other?
The wisteria will climb on anything and everything it can get it's tendrils on. But are you sure you want it on your ivy? Wisteria is the most aggressive grower,and will overtake the ivy, choking it out. As a matter of fact it's not the kind of plant to have close to your house. I know,the blooms are pretty and all but the rest of the plant is a holy terror on your siding,shingles,etc. If you still want to plant it near your house, choose a spot well clear of the power lines that supply your electricity.
Q:What are the advantages and disadvantages of the fastener type steel pipe scaffold and bowl buckle steel tube scaffold
(4) the bearing capacity is large: the vertical rod connection is a coaxial core socket, and the cross bar is connected with the vertical rod by a bowl buckle joint. And the axial line of each member is placed at one point, and the node is in the plane of the frame. (the entire frame bearing capacity, about the same clear fastener type steel tube scaffold condition is improved by more than 15%,)
Q:Scaffolding stuck, need ideas for removing.?
Heat the female connection with a torch. The outer connection will expand from the heat. Heat the connection hot enough not to touch but not cherry red. Put a pipe wrench on male side of tubing where its is cool and tap wrench with a hammer and it will come apart. If possible lay the scaffold on its size for better leverage.
Q:what is common cause of formwork and scaffolding failure during construction?
Improper assembly seems to be a big one. Workers often neglect to install the internal diagonal from upper corner to opposite lower corner when it comes to scaffolding. Formwork usually fails by inadequate bracing at the bottom as hydrostatic pressure builds. This can be mitigated to some extent by allowing the concrete to set up a bit before pouring the next layer. For earth formwork, you have to be real careful about expansive clay becoming saturated and overwhelming the bracing as it expands.
Q:Cantilever scaffold technical disclosure
Steel pipe anti rust paint. Vertical rod and bar brush yellow rust proof paint, scissors and handrails with red and white tube brush. The maximum quality of each steel pipe shall not be greater than 25Kg. Steel pipe is strictly prohibited.
Q:Cantilever scaffold technical disclosure Find satisfaction free speed!!!
1, steel pipe:(1) the steel pipe shall have the product quality certificate and inspection report with the outer diameter of 48mm and the thickness of 3.5mm of the steel pipe welded to the steel pipe of 3. Rust must be replaced, not to be used to build the frame.(2) the surface of the steel pipe shall be straight and smooth, and shall not be used for cracks, scars, delamination, dislocation, hard bending, burrs, indentation and deep drawing.(3) anti rust paint for steel pipe. Vertical rod and bar brush yellow rust proof paint, scissors and handrails with red and white tube brush. The maximum quality of each steel pipe shall not be greater than 25Kg. Steel pipe is strictly prohibited.
Q:What does my earth science teacher mean when he says to do a powerpoint with Link Scaffolding,how d u do it?
Link Scaffolding = A search found no answer. - Ask teacher to clarify.
Q:Is it easier to build a disc scaffolding system than a bowl buckle scaffold?
It is widely used in bridge engineering, tunnel engineering, workshop, elevated water tower, power plant, oil refinery... Support design and special plant, is also applicable to overpass span scaffolding, storage shelves, chimney, water tower and indoor and outdoor decoration, large concert stage, the background frame, stands, balcony frame, stairs, other party system, stage setting, sports watch station project.
Q:Scaffolding installation and precautions?
When the structural layer is attached to the wall, the wall column, the vertical horizontal rod and the transverse horizontal rod are set up immediately after the erection of the structure.5, closed with a step horizontal bar frame must turn around the hands all around the circle, with a right angle fastener and the inner and outer post fixed.6, the horizontal horizontal pole of the double row scaffold should not be greater than 100mm from the wall to the wall.7, when the scaffolding operation of the wall of the two steps, should take temporary stability measures, even after the wall pieces can be removed before the erection.

1. Manufacturer Overview

Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range