Swivel Scaffolding Swivel Couplers For Scaffolding Using
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 20000 pc
- Supply Capability:
- 300000 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details:
Place of Origin:Hebei China
Model Number: GTJ-002
Type: Scaffolding Parts
Material: Q235
Weight: 0.58kg to 0.65kg
Surface Treament: as your requirements
Packaging & Delivery:
Packaging Detail: CARTONS THEN ON PALLET,OR AS YOUR REQUEST.
Delivery Detail: WITH IN 25 DAYS
1. Product Information
Product Name | Japanese Type Swivel Scaffolding Couplers |
Type | GTJ-S002 |
Material | Q235 |
Thickness | 2.5mm or 3mm |
Weight | 0.58kg or 0.65kg |
Surface Treatment | Electroplate Galvanized |
Products’ standard | Fit for JISA8951 |
Dimensions | 48.6 x 48.6mm |
MOQ | 10000PCS |
Product feature | anti-rust, skid proof, high breaking strength |
- Q: What are the requirements for the construction of the scaffold eye in the building?
- Optimistic, the most comprehensive!5.2.5 scaffold EngineeringA. accessories(1) selection and calculation basis of structural parts
- Q: I would like to ask how much scaffolding steel prices, scaffolding steel pipe use what are the requirements?
- The question is not a good answer, is to do the building, on the Internet to help check a lot of information, here to share, you can look at the reference price, the price there is no uniform standard, each region is different, the price is for reference only. Practice has proved that the new scaffold not only safe and reliable construction, installation speed, and the amount of steel scaffolding can be reduced to 33%, disassembly efficiency is improved by more than two times, the construction cost can be decreased, the construction site civilization, clean and tidy.
- Q: How to set up the temporary structure of the external structure of the balcony on the two structure
- Earthwork:The pile cap is shallow, the foundation beam and sand filling quantity is less, the depth is to the outdoor floor 1.5m, so the earthwork construction adopts the mechanical leveling site construction scheme. Backfill soil must be layered compaction, density of not less than 0.9. Construction lap should be compact, interval time should not be too long, in case of rain water, the construction of various types of pipe should be synchronized with the foundation construction.
- Q: Specification for construction steel pipe scaffolding and construction safety rules?
- Construction preparation1, materialThe steel pipe diameter is 48 or 51mm, wall thickness is 3 ~ 3 5mm or hot-rolled seamless pipe joints, used as the main column, a large bar, a small bar, inclined support.The connecting member: rotary buckle, square buckle, buckle, docking barge core.The base made of phi 40 steel tubes and 4 ~ 5mm steel, used for main column stepping. The floor area of the base should not be less than 200C.
- Q: It's when u get two ear piercing and there connected by a tongue ring. So question is where can I get it and how old? I'll be gettin it in Rhode island . Please anwser
- Daddy didn't hug you a lot I take it. Are you going to get a tramp stamp too? Remember if you want to be a proper non-conformist you have to wear the uniform.
- Q: Im 18 years old and maleI have 4 piercings. On my left I have my lobe and a double helix (a type of cartilage piercing). On my right I have a scaffold/industrial. I know I want another piercing on my right ear, but cant decide what to get. Any input is greatly appreciated.
- conch would look great and not make it look to cluttered go for it :)
- Q: Im thinking of getting a scaffold piercing when i am old enough to and ive seen videos of people who have one but it cause bacteria in their ear and if they take it out their ears swell. I want to know if this is a bad piercing to get. Also i have had an allergic reaction to an earring before and im not sure what type of earring it was. Can that affect it as well.
- Getting piercings is not that dangerous except that a lot of normal people will think that you are a weirdo
- Q: Scaffold removal should comply with those requirements......
- Demolition safety requirementsThe removal order should be 1 layers from the top down, at the same time no homework.2 remove the frame rods and connectors, springboard and other materials, should be used in rolling, prohibited throw down. The foot lever and remove the plate have been demolished, should be disposable.3 all the pieces of the wall should be removed from the scaffold layer by layer, it is strictly forbidden to take the whole or a few layers of the demolition of the wall and then dismantle the scaffolding; the demolition of the height difference should not be greater than two steps, such as the height difference is greater than the two step should be added to strengthen the wall.4 when the scaffolding removed to the lower part of the last long steel pipe height, according to the needs of the site in the appropriate position to take temporary support reinforcement, after the demolition of the wall.
- Q: Which loads are considered in the design of the scaffold
- The load of the scaffold can be divided into permanent load (constant load) and variable load (live load).The permanent load of the scaffold shall contain the following contents:
- Q: What heights do u need a harness for(had to repost as didnt explain correctly in last 1)
- OSHA says that you need guardrails, safety nets or a fall-arrest system if you're working or walking near an unprotected surface more than 6' above a lower level.
Send your message to us
Swivel Scaffolding Swivel Couplers For Scaffolding Using
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 20000 pc
- Supply Capability:
- 300000 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords