Steel Ringlock Scaffolding Standard with Hot Dip Gavenized CNBM

Ref Price:
Loading Port:
Guangzhou
Payment Terms:
TT OR LC
Min Order Qty:
20 m.t.
Supply Capability:
3000 m.t./month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 Steel Ringlock Scaffolding Standard with Hot Dip Gavenized

Name

Steel Ringlock Scaffolding standard with Hot Dip Gavenized

Place of Origin

China

Brand name

CNBM

Size

Ø48.3*3.25*1000/2000/3000 or as your request

Main Material

Q345 ,Q235, Q195

Surface Treatment

High Protected Painted, Powder Coating, Electric Gavenized, Hot Dip Gavenized.

Color

Silver, Orange

Certificate

SGS, EN74, ISO

Features

Automatic Welding

Service

OEM Service available

MOQ

20ton

Payment

T/T or L/C in sight

Delivery Time

About 20-30 days after confirmation

Packing

in bulk or steel pallet or as your request

production capability

100 tons per day

Steel Ringlock Scaffolding Standard  with Hot Dip Gavenized  CNBM

Futures:

Versatility: The revolutionary node point- rosette provides up to 8 connections in one plane, allowing the system scaffold highly adaptable for straight as well as curved structures, such as ship yards, power generation stations, petrochemical plants.

Low maintenance: The dip galvanized finish will greatly last the life of the products, no paint required, no more rust or corrosion, even they can be stored externally.

 

The specification componant parts of Steel Ringlock Scaffolding Standard 

Ring Lock System Scaffold Standard / Verticals

Model

Description

Weight(kg)

Weight(lbs)

AR.S.3000

Ring Lock Standard 3000mm (9'10")

14.41

31.77

AR.S.2500

Ring Lock Standard 2500mm (8'2")

12.12

26.72

AR.S.2000

Ring Lock Standard 2000mm (6'6")

9.82

21.66

AR.S.1500

Ring Lock Standard 1500mm (4'11")

7.53

16.60

AR.S.1000

Ring Lock Standard 1000mm (3'3")

5.24

11.55

AR.S.500

Ring Lock Standard 500mm (1'8")

2.94

6.49

Steel Ringlock Scaffolding Standard  with Hot Dip Gavenized  CNBM


The specification of the other parts of the Ringlock Scaffolding

Ring Lock System Scaffold Ledger / Horizontals

Model

Description

Weight(kg)

Weight(lbs)

AR.L.3050

Ring Lock Ledger 3050mm (10')

11.66

25.74

AR.L.2745

Ring Lock Ledger 2745mm (9')

10.57

26.74

AR.L.2440

Ring Lock Ledger 2440mm (8')

9.47

20.88

AR.L.2130

Ring Lock Ledger 2130mm (7')

8.36

18.43

AR.L.1830

Ring Lock Ledger 1830mm (6')

7.28

16.06

AR.L.1520

Ring Lock Ledger 1520mm (5')

6.17

13.61

AR.L.1220

Ring Lock Ledger 1220mm (4')

5.10

11.24

AR.L.1150

Ring Lock Ledger 1150mm (3'10")

4.84

10.68

AR.L.1065

Ring Lock Ledger 1065mm (3'6")

4.54

10.01

AR.L.910

Ring Lock Ledger 910mm (3')

3.98

8.78

AR.L.650

Ring Lock Ledger 650mm (2'2")

3.05

6.73

AR.L.610

Ring Lock Ledger 610mm (2')

2.91

6.41





AR.L.3072

Ring Lock Ledger 3072mm

11.74

25.89

AR.L.2572

Ring Lock Ledger 2572mm

9.94

21.92

AR.L.2072

Ring Lock Ledger 2072mm

8.15

17.97

AR.L.1572

Ring Lock Ledger 1572mm

6.36

14.02

AR.L.1400

Ring Lock Ledger 1400mm

5.74

12.66

AR.L.1286

Ring Lock Ledger 1286mm

5.33

11.75

AR.L.1088

Ring Lock Ledger 1088mm

4.62

10.19

AR.L.1036

Ring Lock Ledger 1036mm

4.44

9.79

AR.L.1020

Ring Lock Ledger 1020mm

4.38

9.66

AR.L.880

Ring Lock Ledger 880mm

3.88

8.56

AR.L.732

Ring Lock Ledger 732mm

3.35

7.39





AR.L.3000

Ring Lock Ledger 3000mm

11.48

25.31

AR.L.2500

Ring Lock Ledger 2500mm

9.69

21.37

AR.L.2000

Ring Lock Ledger 2000mm

7.89

17.40

AR.L.1500

Ring Lock Ledger 1500mm

6.10

13.45

AR.L.1000

Ring Lock Ledger 1000mm

4.31

9.50





AR.L.2400

Ring Lock Ledger 2400mm

9.33

20.57

AR.L.1800

Ring Lock Ledger 1800mm

7.18

15.83

AR.L.1200

Ring Lock Ledger 1200mm

5.02

11.07

AR.L.900

Ring Lock Ledger 900mm

3.95

8.71

AR.L.600

Ring Lock Ledger 600mm

2.87

6.33

Steel Ringlock Scaffolding Standard  with Hot Dip Gavenized  CNBM

Ring Lock System Scaffold Bay Brace / Diagonal Brace

Model

Description

Weight(kg)

Weight(lbs)

AR.DB.3050x2000

Ring Lock Bay Brace 3050x2000mm (10')

10.87

23.96

AR.DB.2745x2000

Ring Lock Bay Brace 3050x2000mm (10')

10.24

23.96

AR.DB.2440x2000

Ring Lock Bay Brace 2440x2000mm (8')

9.62

21.20

AR.DB.2130x2000

Ring Lock Bay Brace 2130x2000mm (7')

9.03

19.91

AR.DB.1830x2000

Ring Lock Bay Brace 1830x2000mm (6')

8.51

18.76

AR.DB.1520x2000

Ring Lock Bay Brace 1520x2000mm (5')

7.91

17.45

AR.DB.1220x2000

Ring Lock Bay Brace 1220x2000mm (4')

7.62

16.80

AR.DB.1150x2000

Ring Lock Bay Brace 1150x2000mm (3'10")

7.53

16.61

AR.DB.1065x2000

Ring Lock Bay Brace 1065x2000mm (3'6")

7.44

16.41

AR.DB.910x2000

Ring Lock Bay Brace 910x2000mm (3')

7.29

16.07

AR.DB.650x2000

Ring Lock Bay Brace 650x2000mm (2'2")

7.08

15.62

AR.DB.610x2000

Ring Lock Bay Brace 610x2000mm (2')

6.90

15.21





AR.DB.3072x2000

Ring Lock Bay Brace 3072x2000mm

10.95

24.14

AR.DB.2572x2000

Ring Lock Bay Brace 2572x2000mm

9.89

21.81

AR.DB.2072x2000

Ring Lock Bay Brace 2072x2000mm

8.93

19.69

AR.DB.1572x2000

Ring Lock Bay Brace 1572x2000mm

8.10

17.86

AR.DB.1400x2000

Ring Lock Bay Brace 1400x2000mm

7.86

17.33

AR.DB.1286x2000

Ring Lock Bay Brace 1286x2000mm

7.71

17.00

AR.DB.1088x2000

Ring Lock Bay Brace 1088x2000mm

7.47

16.47

AR.DB.1036x2000

Ring Lock Bay Brace 1036x2000mm

7.41

16.34

AR.DB.1020x2000

Ring Lock Bay Brace 1020x2000mm

7.40

16.32

AR.DB.880x2000

Ring Lock Bay Brace 880x2000mm

7.26

16.01

AR.DB.732x2000

Ring Lock Bay Brace 732x2000mm

7.14

15.74





AR.DB.3000x2000

Ring Lock Bay Brace 3000x2000mm

10.77

23.75

AR.DB.2500x2000

Ring Lock Bay Brace 2500x2000mm

9.74

21.48

AR.DB.2000x2000

Ring Lock Bay Brace 2000x2000mm

8.80

19.40

AR.DB.1500x2000

Ring Lock Bay Brace 1500x2000mm

8.00

17.64

AR.DB.1000x2000

Ring Lock Bay Brace 1000x2000mm

7.38

16.27





AR.DB.2400x2000

Ring Lock Bay Brace 2400x2000mm

9.55

21.06

AR.DB.1800x2000

Ring Lock Bay Brace 1800x2000mm

8.47

18.68

AR.DB.1200x2000

Ring Lock Bay Brace 1200x2000mm

7.60

16.76

AR.DB.900x2000

Ring Lock Bay Brace 900x2000mm

7.28

16.05

Steel Ringlock Scaffolding Standard  with Hot Dip Gavenized  CNBM

Model

Description

Weight(kg)

Weight(lbs)

AR.COL.280

Ring Lock Collar 280mm

1.81

3.98

AR.COL.235

Ring Lock Collar 235mm

1.52

3.35

AR.CJ

Ring Lock Caster Jack

3.51

7.74

AR.SA

Ring Lock Spigot Adaptor

1.62

3.58

Steel Ringlock Scaffolding Standard  with Hot Dip Gavenized  CNBM

Ring Lock System Scaffold Side Bracket

Model

Description

Weight(kg)

Weight(lbs)

AR.SB.400

Ring Lock Side Bracket 400mm (1'4")

4.88

10.77

AR.SB.650

Ring Lock Side Bracket 650mm (2'2")

6.72

14.81

AR.SB.880

Ring Lock Side Bracket 880mm (2'11")

8.12

17.91

AR.SBW.400

Ring Lock Side Bracket (Wall) 400mm (1'4")

4.82

10.62

AR.SBW.650

Ring Lock Side Bracket (Wall) 650mm (2'2")

6.72

14.82

AR.SBW.880

Ring Lock Side Bracket (Wall) 880mm (2'11")

8.36

18.44

Steel Ringlock Scaffolding Standard  with Hot Dip Gavenized  CNBM





 

Ring Lock System Scaffold Double Ledger

Model

Description

Weight(kg)

Weight(lbs)

AR.DL.1520

Ring Lock Double Ledger 1520mm (5')

11.80

26.02

AR.DL.1830

Ring Lock Double Ledger 1830mm (6')

14.26

31.44

AR.DL.2130

Ring Lock Double Ledger 2130mm (7')

16.41

36.18

AR.DL.2440

Ring Lock Double Ledger 2440mm (8')

18.87

41.6

AR.DL.3050

Ring Lock Double Ledger 3050mm (10')

23.48

51.76

Steel Ringlock Scaffolding Standard  with Hot Dip Gavenized  CNBM

 

Ring Lock System Scaffold Steel Plank (9.5" wide)

Model

Description

Weight(kg)

Weight(lbs)

AR.SSP.3050

Ring Lock Steel Plank 3050mm (10')

20.56

42.92

AR.SSP.2440

Ring Lock Steel Plank 2440mm (8')

17.01

35.13

AR.SSP.2130

Ring Lock Steel Plank 2130mm (7')

15.21

31.17

AR.SSP.1830

Ring Lock Steel Plank 1830mm (6')

13.47

27.34

AR.SSP.1520

Ring Lock Steel Plank 1520mm (5')

11.66

23.39

AR.SSP.1220

Ring Lock Steel Plank 1220mm (4')

9.92

19.56

AR.SSP.1150

Ring Lock Steel Plank 1150mm (3'10")



Steel Ringlock Scaffolding Standard  with Hot Dip Gavenized  CNBM

 

Why choose us?

Experience: over ten years in scaffolding manufacturing.

Quality: Certified by SGS, BS1139, EN74, Local Test Report.

Price: Moderate, Reasonable.

Service: Friendly and Responsible,OEM accepted.


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Why has my scaffolding collapsed?
You need to be examined by your doctor as only an examination could determine the reason why this is happening..............
Q:Bowl buckle scaffold is not a pipe fitting scaffold
The steel pipe scaffold is mainly used to connect the steel pipe, the specific method is different.
Q:Scaffold/Industrial piercing help?
I don't have one of these piercings but I have also heard they are pretty painful. However, it really depends on your pain tolerance. I still don't think the pain would be too bad to stop you from getting the piercing, it is pretty quick. And they look really cool, so don't let the pain put you off.
Q:i walk almost all day long carrying heavy material and climb up and down scaffolding. is this a workout?
Thats work not a workout.
Q:What are the advantages of rotary - type scaffolding compared with other scaffolding
Wheel buckle scaffolding (DIP) is an in-line scaffold with self-locking function, according to the Ministry of housing and Urban Rural Construction issued JGJ231-2010 standard production, the main component is a vertical rod and a cross node, reasonable structure, pole axial force transmission
Q:What are the specifications of the bowl fastener? What kind of?
Bowl buckle bracket. Divided into horizontal and vertical rod.Crossbar common specifications are: HG-60.HG-90.HG-120.HG-150
Q:A 75kg painter stands on a 5.5m long uniform plank resting on a scaffold.?
The mass of the plank on the left side of the scaffold is: M₁ = (20 kg) × (1.5 m) / (5.5 m) = 5.45 kg The distance between the scaffold and the center of mass on the left side is: L₁ = (1.5 m) / 2 = 0.75 m So the torque of the plank on the left side is: T₁ = (5.45 kg)×(0.75 m) = 4 kgm The mass of the plank on the right side of the scaffold is: M₂ = (20 kg) × ((5.5 m) - (1.5 m)) / (5.5 m) = 14.5 kg The distance between the scaffold and the center of mass on the left side is: L₂ = ((5.5 m) - (1.5 m)) / 2 = 2 m So the torque of the plank on the left side is: T₂ = (14.5 kg)×(2 m) = 29 kgm Now, say the painter stands at X meter on the left side from the scaffold, so the torque added on the left side is: T₃ = X × (75 kg) The total torque on the left must be the same as the total torque on the right, so (4 kgm) + X×(75 kg) = (29 kgm) X×(75 kg) = (25 kgm) X = 0.333 m That is the maximum distance the painter can move away from the scaffold, so the distance to the end of the scaffold is: D = (1.5 m) - (0.333 m) = 1.167 m < - - - - - - answer
Q:Scaffold Piercing questions?
afte the guy pierced it my ear felt really warm and swollen i tried to not get my hair caught around the jewelry. mix sea salt with warm water or anti-bacterial soap
Q:massless scaffold is held up by a wire at each end. The scaffold is 12m long. A 300-N box sits 4.0 m from the?
And you asked this physics question in the math section of answers because? Let Tl and Tr be the tensions in the left and right wires. We are told the weight of the box is W and that the scaffold is weightless.
Q:Should the WWE bring in New Jack to work scaffold matches with John Cena & Randy Orton?
New Jack? Jack Swagger O_o

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range