Product Description:

1. Structure of 120 Steel frame formwork-wall formwork

It is a heavy-bearing steel frame formwork works with steel frame, plywood and lock. As the framework, it is adapted to the plywood with thickness of 18mm. High-precision production line guarantees the perfect products.

2. Main Features of 120 Steel frame formwork-wall formwork

-Special hollow steel frame covered with WISA-plywood, light weight but high strength.

-Its allowable pressure is 60KN/m2 with the weight of 65KG/m2.

-High standardized system.

-Easy connection with adjustable steel clamp

-Convenient tie arrangement with the hole in frame.

-Convenient and fast corner formwork.

3. 120 Steel frame formwork-wall formwork Images

  

 

 4. 120 Steel frame formwork-wall formwork Specifications


 

 

5. FAQ of 120 Steel frame formwork-wall formwork

 

1) What can we do for you? 

    .We can ensure the quality of the120 Steel frame formwork-wall formwork and avoid extra expenses for customers.

    .We can provide you the professional technical team.    

    .We can provide professional building proposal for your projects.        

 

2) What promises can be done by us?

   . If interested in this kind of early prop head formwork, please feel free to write us for any QUOTE.

   . If need any technical and building assistance, we could provide on-site professional staff for instruction.

   . Please DO check goods when courier knocks your door and contact us asap if any issueS.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the details of construction machinery parts in sand casting?
(1) all kinds of equipment and equipment with the arrival of the body parts, as equipment and components, gas pipelines and accessories such as materials, power capacitors on the construction equipment and materials division rules, various electric fans and electrolyzer etc.. 1, high voltage circuit breaker, platform, shortwave communication equipment and shortwave TV antenna device, natural white afrodite, chemical equipment parts, recycling. For the completion of the building, elevator rails are materials, catalyst, screen (including the box and the instrument has been installed in place, by the design unit to provide manufacturing drawings, unit combination instrument, strengthen the investment in the process of construction and management, and other accessories are materials; non standard equipment, sliding contact line
Q:What are the sectors of machine building and parts processing?
Industry to classify, it is not very strict. For example, the insurance industry, mining, energy, food, hotels, real estate services industry, garment industry, advertising industry, aerospace, aviation, chemical, chemical, construction, health care, education, training, computer, metal smelting, fire, police, soldiers, accounting, beauty, body, media, publishing, wood, paper retail, wholesale, agriculture, tourism, justice, lawyers, sports, sports, arts, entertainment, medical, art, design, banking, finance, Internet, music, dance, postal, courier, transport, consulting services.
Q:Definition of large mechanical equipment?
Depending on the size of the part to be machined, the parts must be set up as large equipment with the aid of a crane, and large machinery is usually assembled after the parts have been delivered to the destination. Material handling machinery is mainly in enterprises (including terminals, materials, mines and commercial warehouses, etc.) within the material handling, transportation, lifting, stacking and storage of machinery and equipment
Q:China mechanical net
There are mechanical product development and design, mechanical equipment transformation, mechanical equipment maintenance, data inquiries, standard inquiries, mechanical professional translation, mechanical CAD and other mechanical and technical services.
Q:What are the construction materials, components, fittings and equipment in construction?
: construction engineering materials, components, fittings, equipment, each refers to: 1, engineering materials: engineering materials mainly refers to raw materials. Such as: sand, stone, steel, etc., there is no processing materials. 2, structural parts: the main structure here is the main structure of the building, the two structure and other accessories. Most of the semi-finished products and the structure of part of the installation accessories, such as: beam beam, continuous beam, beam, beam, cantilever beam, curved beam; steel, timber, concrete beam.
Q:What are the safety protection equipment, machinery and equipment, construction machinery and accessories for construction enterprises?
Different types of work, security appliances are not the same. For buildings, the main safety helmets, safety nets, safety belts (San Bao), etc., for electrical operators, mainly insulated shoes, insulating gloves, insulation rod, insulation table, etc.
Q:What is the difference and connection between equipment manufacturing and machine building?
In accordance with the standards of classification, including metal products, general machinery manufacturing, machinery manufacturing, transportation equipment manufacturing, electronic and communication equipment manufacturing industry, electrical machinery and equipment manufacturing, instrumentation and office machinery manufacturing seven deducted 186 small consumer related manufacturing industry after class. Equivalent to the European countries referred to as "capital goods manufacturing", that is, we often say "the production of means of production industry."".
Q:Construction machinery production need to deal with what documents?
The person in charge of the enterprise, the person in charge of the project, full-time safety management personnel in "safety assessment qualified" column content according to the "three persons" Safety Assessment Certificate (fill in the contents of enterprise work safety management staff should meet the enterprise production safety management, the safety management department staff with the qualification to the total contract for not less than 5, not less than 3 professional contracting labor subcontracting, not less than 1; the construction site should be equipped with full-time safety management personnel according to the project size can be determined, according to the construction area of less than 10 thousand M2 project has at least a part-time staff of more than 10 thousand M2; project 1 - 2 full-time staff; more than 50 thousand M2 large sites, according to different professional safety management group);
Q:Where was the construction machinery conference held in 2015?
Co organizer: BMW (Chinese) Engineering Machinery Company Limited, Shandong Lingong Construction Machinery Co, Limited by Share Ltd, Shantui construction machinery Futian leiwo international heavy industry Limited by Share Ltd, Shandong Chang Linzhu Machinery Group Limited by Share Ltd, Shandong rhinos Engineering Machinery Company Limited, Beijing Tianshun Hydraulic Technology Co., Ltd. Ji'nan the Great Wall Andy Machinery Co. Ltd., Langfang Deji machinery Polytron Technologies Inc, Tai'an Dongyue Heavy Industry Co. Ltd.
Q:What measures can effectively reduce the construction accident rate?
Hefei construction workers training _ fail safe design: in the part of the system, equipment malfunction or damage, can also ensure the safety of safety and technical measures known as fault - Safety Design in a certain period of time (fail-safe). Generally speaking, through careful technical design, the system and equipment are in a low energy state when the fault occurs, thus preventing the unexpected release of energy. For example, a fuse in an electrical system is a typical fault - Safety Design; when the system is overloaded, the fuse is fused and the circuit is disconnected to ensure safety. Although the fail safe design is an effective measure of safe technology, but considering the fail safe design itself may not work due to failure, so the choice of safety technical measures should not give priority to the use of.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range