Steel Coupler Rebar Steel Tube Made in Jiangsu China High Quality
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1500 pc
- Supply Capability:
- 100000 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Steel Coupler Rebar Scaffolding Tube High Quality
1.Description of Steel Coupler Rebar Steel Tube Made in Jiangsu China:
Lapped joints are not always an appropriate means of connecting rebar. The use of Steel Rebar Couplers can simplify the design and construction of reinforced concrete and reduce the amount of reinforcement required.
The threaded steel coupler system is designed as a threaded reinforcement connection with 100% load transmission. The steel coupler rebar connection system is suitable for both static and dynamic load transmission in construction joints.
The coupler is designed as a threaded reinforcement connection for formed construction joints. Reinforcement work is normally carried out on both sides of the construction joint using lap joints or one side is anchored. The bar lengths are based on the structural analysis requirements of the building component and are calculated from anchorage and lap lengths.
2.Advantages of Steel Coupler Rebar Steel Tube Made in Jiangsu China:
Advantages of Cut and Bend Services
Rebars are cut and bent to exact specifications, ensuring precision and consistency.
Cut and bend reinforcement bars do conform to BS 8666.
Material wastage is controlled and reduced.
Lesser on-site labour is required.
Better utilisation of on-site space, logistics and reduction of inventory on-site.
In-house processes and procedures that ensure traceability down to the order level
Weather independent
The coupler system provides the opportunity to connect rebars quickly, easily and cost effectively, even when large rebar diameters are used. This makes the steel coupler rebar range a logical extension to our rebendable CNBM reinforcement continuity system for rebars over 12 mm.
3.Available sizes of Steel Coupler Rebar Steel Tube Made in Jiangsu China:
14mm,16mm,18mm,20mm,22mmm,25mm,28mm,32mm,36mm,40mm
4.Delivery:
Delivery Term: FOB / CFR / CIF available.
Delivery Time: 15 days or less after order confirmed.
5.Why choose us?
Technical Expertise
Experienced Management
Stringent Quality Control
Exemplary Service
On-Time Delivery
Wide Product Range
Competitive Pricing
Huge branch network capable of catering worldwide
6.FAQ
Why Us?
We are one of the Top 500 in the world, largest construction materials supplier in China. Also we are a state-owned company and respond to every customer with large and also small orders.
We own professional manufacturers with powerful producing capacity.
Extensive and comprehensive quality control system
Excellent products with competitive prices.
Efficient services in pre and after sale.
Full energy with affluent experience team.
- Q: If you have two workers say standing on a scaffolding, their are downward forces from the weight of the workers along with the weight of the scaffold, and upward forces from tension suspending the scaffolding in place. The opposite forces add to zero and thus the scaffolding remains at rest.My question has to do with what would occur if more/less workers were on the scaffolding. It appears to me that the scaffolding would always remain at rest. Would there always be a ΣF=0 regardless of the amount of workers? As the decreases in weight from removing a worker would also cause the tension force to be weaker? And vice versa if there were more workers?I
- You are correct so long as the scaffolding is not allowed to move. I.e. the cables suspending it are locked and not unwinding from their spools as more workers get on. More weight added would necessarily increase the tension in this type of case. However, if, when another worker got on and the tension could not increase for what ever reason, a downward acceleration would take place that is proportional to the worker's weight. Hope that clears things up.
- Q: Which God can tell me what is required, how to get ah?
- Regardless of the site is the use of their own disc foot accessories, or rental of disc scaffolding accessories, before use should be carried out preliminary calculations, see how many accessories,
- Q: Construction scaffolding right angle fastener, rotary fastener, butt fastener weight? There are more than one meter steel pipe?Thank you!!!
- Button bowl frame of various specifications and theoretical weight list: scaffolding company, steel pipe, scaffold engineering, scaffold accessories, Wuxi scaffolding, scaffolding rental, mobile scaffolding, scaffolding, scaffolding rental, Aluminum Alloy scaffolding, scaffolding, mobile scaffolding, stainless steel scaffolding;
- Q: scaffolding piercing.. do they hurt? and how much are they in england? thanks x?
- Yes they hurt but like all piercings if you look after them then it wont hurt for long. If you don't like pain don't get them. I can't tell you what they cost in England as you posted your question in the Australia section.
- Q: At 16 I took my bros 16 gauge piercing needle and pierced my left cartilage and it didn't hurt at all.... and I have a tattoo as well and I laughed through it. So pain isn't huge when it's a small amount.
- once you get it pierced do no longer stressful up bc its going to harm like 10 situations extra. stay comfortable and actual do now not sleep on it in view which you will awaken day after today with a swollen ear and in discomfort. sparkling it thrice an afternoon for 12 weeks. And basically a reminder cartilage piercings do take a together as to heal. Mine took a pair of 365 days in a a million/2 to absolutely heal. meaning the place i became into waiting to sleep on it and not harm.the place i became into waiting to pass it around without it getting contaminated minutes later. you may haven't any problem with it as long as you're looking after it =) And from a a million to 10 i say its between a 7 and eight once you get it pierced bc it does throb after.
- Q: What are the common rules for calculating the amount of scaffolding works
- The independent brick (stone column) less than 3.60M in height, scaffold to construct the core column multiplied by the circumference of high calculation, the implementation of masonry scaffolding in the shelf; column 3.60M with column wise, the structure of the circumference of the core column height calculated by multiplying plus 3.60M, the implementation of masonry scaffolding outside the shelf (single row). Where masonry height exceeds 1.5m of the masonry are required to calculate the scaffolding.
- Q: So, 12 Days Ago I Went To Blue Banana To Get Scaffolding On My Right Ear. Everything Went Fine And They Did A Brilliant Job. I Clean It With Sea Salt Soaks 2-3 Times A Day And Use A Bit Of Tea Tree Oil After To Help Sooth. I Was Just Wondering From People Who've Experienced This Piercing How Long It Took For Yours To Stop Hurting And The Time It Took For The Swelling To Go Down (: Thank You lt;3
- It only really hurt for the first month-ish but was really tender for the first 3 months. After that, I barely noticed it was there. Goodluck :]
- Q: Specific requirements, the civil code is what ah! Thank you very much, I am lack of this kind of information, I hope you can tell me which of the following
- The surface of the steel pipe shall be smooth and free of cracks, scars, delamination, dislocation, hard bending, burrs, indentation and deep scratches.The outer diameter of steel pipe 48mm allowable deviation is 0.5mm; the thickness of the wall 3.5mm allowable deviation of.0.5mm; steel pipe surface cutting oblique deviation 1.7mm;Dressing should be checked once a year. When the examination, should be in serious pipe corrosion in the selected three roots in each part of the serious corrosion of transverse sampling inspection, the outer surface of the steel pipe corrosion depth allowable deviation is less than 0.5mm, more than the provisions shall not be used.All new and old steel pipes must be painted with anti rust paint.
- Q: Specification and type of scaffold erection
- Specification for scaffold erection(a) basic requirements1 important scaffolding must develop a construction plan, if necessary, to develop safety assurance measures. 2 more than 25m high scaffolding must adopt the fastener type steel tube scaffold, the single pole scaffolding height should be controlled within 50m; height of more than 50m of the scaffolding should be effective measures by a double pole, wire rope, cable stayed unloading segment, and additional design.3 the design of the scaffold shall meet the requirements of the project and shall indicate its use, maximum static load, maximum dynamic load andThe selected design parameters and structural parts shall not be lower than the existing national and industry related safety technical standards.4 scaffolding in the construction of the need to change the original structure, Gago (wide), to its use, etc., must be verified by the technical department, and the approval.
- Q: How does the second scaffold scene morally change Hester Prynne?
- concentration your activity on who's on the scaffold, how they react to the customary public shaming, and what the reader learns with connection with the character from analyzing the define of them on the scaffold.
Send your message to us
Steel Coupler Rebar Steel Tube Made in Jiangsu China High Quality
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1500 pc
- Supply Capability:
- 100000 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords