• Stair Case 420*2000*1500*2370mm Step Ladder with Hook CNBM System 1
  • Stair Case 420*2000*1500*2370mm Step Ladder with Hook CNBM System 2
  • Stair Case 420*2000*1500*2370mm Step Ladder with Hook CNBM System 3
Stair Case 420*2000*1500*2370mm Step Ladder with Hook CNBM

Stair Case 420*2000*1500*2370mm Step Ladder with Hook CNBM

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
50 m.t.
Supply Capability:
30000 m.t./month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

  • Quick Details of Stair Case 420*2000*1500*2370 Step Ladder with Hook

  • Material :Q235/Q345 carbon steel

  • Surface treatment :Hot dip galvanized,Pre- galvanized

  • Main Components :steel with hook

  • Diameter :420*2000*1500*2370


  • Stair Case 420*2000*1500*2370mm Step Ladder with Hook CNBM

  • Stair Case 420*2000*1500*2370mm Step Ladder with Hook CNBM

  • Descriptions of Stair Case 420*2000*1500*2370 Step Ladder with Hook

  • Step ladder with hook is an independent research construction ladder based on market needs. Its distinctive hook design, which is convenient and firm, makes safe construction work possible. The punched holes in galvanized steps enable a well drainage and corrosion & skid prevention. In combination with scaffolding structure, the step ladder with hook is convenient、safe and functional construction equipment can be used in any weather condition.

  • Advanced CO2 shielding gas welding design,assuring construction safety.

  • Well drainage and anti-skip step guarantee a safe platform work.

  • Standard step ladder, a necessary & fast construction equipment for scaffolding structure.

  • Galvanized treatment design, Independent research, cost control excellent product.

  • Energy-saving and environment-friendly.



FAQ

  • 1. What is considerations of Scaffolding installation?

  • There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

  • (1) scaffold frontage hurtful to prevent falling objects protection is required.

  • (2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

  • 2.What are the certifications of your products?

  • Certified by SGS, BS1139, EN74, Local Test Report.

  • 3. How long is the warranty period for your product?

  • Our products warranty is 2 years.

Q: i need as much detail you can give me on these symbols in the book scarlet letter by Nathaniel Hawthorne. if you have any website references besides cliffs notes and spark notes i would greatly appreciate it!!!
The letter A on Hester's chest AND the letter A traced in the sky the night the governor died. The A on Hester's chest was, of course, a sybol of Adultry. But in the end, Hester chooses to wear it after she doesn't need to anymore, and most people take that to mean that the meaning of the symbol has changed, it became more something she overcame, it comes to stand for able. The letter A traced in the sky when the governor dies has two different meanings, the general public took it to mean that the governor was now in heaven as an angel, but Dimmesdale saw it as a symbol of his own adultry. The scaffold, as you said, which I think is a symbol of judgement and sin. Pearl is also a symbol - she is a literal symbol of the love affair, but also a symbol of innocence. For websites, just google scarlet letter - thats what I did and found lots of good information.
Q: The classification of scaffolding and the relevant provisions of the provisions of the installation, please explain professional, thank you
2, scaffolding construction should be appropriate qualifications for safety in production permit in accordance with the construction of the scaffolding for the implementation of special case of Wu erection qualification prohibited the construction team to set up construction, 3 steel tubular scaffolding steel tube, fastener, wall fittings etc. shall be in accordance with the "construction of steel tubular scaffold Safety specifications" (JGJ130-2001) requirements and factory certification, inspection report inspection qualified components for 4 steel tubular scaffolding, scaffolding operations engineering supervisor should strengthen inspection found the construction according to the special case of the implementation of existing safety accidents should be in accordance with the relevant provisions of the written instructions and construction units ordered rectification or stop two, construction scaffolding technology standard 1 basic requirements, the pole base (base plate) a malleable cast iron manufacturing and welding base two erection scaffold Wooden plate paving base pole again put into the base plate in the bottom area of the calculation and should be less than 2 degrees, the thickness of 50mm to cross the wooden shim plate adopts steel plate 2, using plywood as cantilever scaffold cantilever beam layer cantilever scaffold with cantilever beam or cantilever frame with steel cantilever beam should be prohibited (I-beam, channel) made of cantilever frame made from steel tubes connected by the fastener 3, operation layer, protective railing railing ramps block baseboard shall be erected outside the pole inside; rail height should be 1200mm; the railing height should be 600mm; in 180mm4, the block foot height should be within the framework of closed scaffolding laying scaffold should be at least two layers. Operation layer protective layer operation layer protective layer of scaffold safety net fallback
Q: What are the main safety problems when dismantling the scaffold
3, the demolition of spare parts to be loaded into the container, with a crane hanging; the steel pipe to be tied to secure, double point lifting, prohibited from high altitude thrown.4, more than six wind (including level six) to stop the construction of mobile scaffolding.
Q: What are the characteristics of Pankou scaffolding
Pankou scaffold has the advantages of low cost and high efficiency of the hitherto unknown advantage. Comprehensive consideration of the company's future worries, no need to worry too much about frequent accidents, high cost of substantive issues.
Q: I've wanted an industrial/scaffold piercing for ages! My mum is finally looking into letting me have it done. Any advice about it? How can I hide it for school? What's the healing time? :) thank you for any feed back.
Healing time is generally 6 months. It doesn't hurt to get it pierced but it's very sensitive after its pierced, DO NOT roll the bar around cuz you can damage the cartilage that way, and keep it super clean
Q: I have some scaffolding that I would like to use to build a temporary slide to my swimming pool. The slide I would like to be made out of the side parts which are the ones like rectangles with bars going across them and I have a variety of poles. I would then like to put a slippery tarpaulin on to the frame.But how would I hold the tarpaulin up, because the metal poles will be too short? So that if someone slid down it they would not just burst through the tarpaulin and hit the floor after hitting around five metal poles!
Why would you even consider something like that? Obviously you kids and your family use this pool, why put them at risk making a temporary slide with scaffolding. Not a good idea.
Q: How to remove the disc scaffolding ah, do not know how to get through the decoration
Second, the demolition of disc type scaffolding parts down to classify storage and management, in order to transport, but also a process of removing parts check the parts, to separate the deformation, the rusty parts, don't put the next time in construction.
Q: Can anybody provide me the formula for calculating scaffold volume on circular tank?
Step 1. Measure the diameter of the tank (D). Step 2. Measure the height (h) for a vertical tank or length (l) of a horizontal tank. Step 3. Calculate the cross-sectional area of the tank using Equation 1. Equation 1: Cross-sectional Area, A = 3.14 x D x D/4 Step 4. Calculate the volume of the tank in cubic feet using Equation 2. Equation 2: Volume in cubic feet = A x h [for a vertical tank] Volume in cubic feet = A x l [for a horizontal tank] Step 5. Convert the volume of the tank from cubic feet to gallons using Equation 3. Equation 3: Volume in gallons = (Volume in cubic feet) x 7.48
Q: how did they turn the cells into a polymer for the heart scaffold ?
May have misunderstood. The heart is gently stripped of cells by using a detergent - this leaves the extracelllular matrix - a polymer of collagen - inert and insoluble. New cells (stem cells) will then be added to the structure to repopulate it with living heart muscle which gain coordination and structure from the matrix.
Q: Who knows how much the amount of the main material used to take one square metre of conventional double row scaffolding (within 12 meters). For example, how many kilograms of steel pipe, the number of fasteners. The content of the quota is low, I am also very confused, to the completion of the work of the scaffolding rental fees. Very urgent, I hope to know the user to answer. Accident report
The following is a quote fragment: who knows how to use a square meter of the main raw material of double row scaffolding

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords