Segment Bridge Construction Launching Gantry Crane 1000 Ton CNBM

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
2000 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1000 ton segment bridge construction launching gantry crane is generally used in the erection of the Highway Bridge and Subway Bridge, using the precast segmental prestress concrete box beam (PC beam) assembly. The main feature is the high efficiency of construction and self-traveling. Generally it is composed of the main beam, leg and winch trolley, the main girder is used for bearing, the leg is to execute machine transverse moving, longitudinal moving, leveling, support, cross span, cross scale and other functions, and the winch trolley used for lifting the precast girder.

 

Technical Parameters

 

Product Model

CNBM 1000

Max. hanging weight(t)

1000

span(m)

50.51

Lifting height of trolley(m)

56

Rated lifting capacity(t)

140

Max. working slope

2%

Max. working transverse slope

2%

Traveling speed(m/min)

1

Speed of erection of girder(day/span)

10

The whole machine power(kw)

180

The total weight(k)

750

 

COMPANY ADVANTAGES:

CNBM(World Fortune 500) is one of the state owned corporation, which specialized in researching, developing, producing and exporting of construction machinery & industrial materials.


It mainly produces 1000 ton segment bridge construction launching gantry crane, overhead crane and gantry crane, beam launcher, movable scaffolding system crane, form traveller, straddle carrier, tyre transportor, beam trolley, portal crane and electric winch, electric hoist and all kinds of accessories, which widely cover machinery, metallurgy, electric power, railway, water conservancy, ports, terminals and other industries.


Our advantages:
A. More than 50 R&D personnel with advanced Science and technology
B. More than 400 sets advanced Production processing equipment and inspection equipment
C. Obtain ISO 9001 certificate and more than 10 series of patent certificates
D.fficient service and competitive products
E. Export more than 100 countries

 

Walking-through drawing:

Segment Bridge Construction Launching Gantry Crane 1000 Ton  CNBM

Installation process:

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Body being a fine piece of machinery releases spirit or soul after death. What are its components in heaven?
What are its components?? In heaven there is no more crying, pain, suffering. God takes all those things away. Heaven is about Joy, Peace, and most of all Worshiping. Revelation 7:16 They shall neither hunger anymore nor thirst anymore; the sun shall not strike them, nor any heat; Revelation 7:17 for the Lamb who is in the midst of the throne will shepherd them and lead them to living fountains of waters. And God will wipe away every tear from their eyes.
Q:In Tally7.2 I have to pass journal entry of Machinery purchased?
Well you are not very clear with yoUr question , you need to be clear about what you are trying to do, Did you receive an invoice for the fixed asset or the payment has already been made ? answer would depend on the situation: Although i think the main entry you are after is DR Fixed assets ( machinery) DR VAT paid- (assuming Ur sub ledger doesn't pick up any VAT) CR Trade creditors see the above entry when ur paid first and purchases the machinery in last month and invoice received in this month u can take vat Cr ok it will depand upon this type of situation
Q:all are true of the photosynthetic machinery of cyanobacteria except ?
b) it was assembled from two anaerobic systems that had originated in different types of bacteria
Q:How do I make cacao butter using raw beans and no machinery?
Did okorder.com/ . This is able to extremely manage one and all!
Q:Whats the biggest piece machinery you ever drove?
Semi truck pulling 3 - 53 foot trailers at one time
Q:why didnt worker like new machinery? how did factory owners solve the problems?
Because automation reduced the need for workers.
Q:how do i get over my fear of heavy machinery?
Go take Behavior therapy. it teaches you to overcome your fear and ecr. You should also use Gradual exposure. Basically, just go to a phychologist because that will help you more. -phyc major
Q:which machinery and raw material use to manufacture micro sd memory card ?
we also want to start, sd card manufacturing in PAKISTAN, please advice
Q:what kind of repellent to use on machinery to repell glue?
Wax or oil.
Q:Is a car considered heavy machinery?
What Is Heavy Machinery

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range