Scaffolding pipe clamp swivel coupler

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Quick Details

Place of Origin:
Shandong China (Mainland)


Model Number:
FJ-BSW-0268
Type:
Scaffolding Parts
Scaffolding Part Type:
Scaffolding Couplers
Material::
Q235
Surface treatment::
Electric Galv.
Fit prop diameter::
48.3mm x 48.3mm
Weight::
1.10 kg
Type::
Swivel

Packaging & Delivery

Packaging Detail:GUNNY BAG THEN ON PALLET.
Delivery Detail:WITH IN 25 DAYS.

Specifications

scaffolding pipe clamp swivel coupler
1.EN74/BS1139 products.
2.Clearly mark letters.
3.Perfect surface.
4.Time delivery.

 scaffolding pipe clamp swivel coupler

Used for connecting horizontal or ledger tubes to standards.

Can be used in all positions where the tube it secures comes under

Used for bracing, these couplers allow tubes to be connected at any angle

                                   

SWIVEL COUPLERS

Dimensions:

48.3 x 48.3mm (1 29 / 32" x 1 29 / 32" )

Material:

drop forged carbon steel

Bolt:      

T-bolt

Nut sizes:

17mm, 19mm, 21mm, 22mm, 23mm

Styles:    

standard, flanged

Standards:

BS1139 (1982 & 1991), EN74 class A & B

Surfaces:

self-colored, galvanized, hot dip galvanized

Designed to fit tubes with 33.7mm (1 11/32") - 88.9mm (3 1/2") diameters


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:examples of scaffolding?
As long as you're on the internet, why not just Google examples of scaffolding rather than expecting someone on YA to do your homework for you?
Q:Find the demolishing scheme of scaffold
Removal methodThe development of the demolition plan, the program should include the removal of the steps and methods, safety measures, etc.. Demolition order should be observed from top to bottom, the first after the demolition, after taking the first demolition principle. That is, first remove the railings, scaffolding, scissors support, diagonal bracing, and then small beams, large cross bars, vertical poles, etc., and according to the principle of one step clear in order to be prohibited from top to bottom at the same time the demolition work. Remove the shelf of the high-altitude personnel should wear safety helmet, safety belt, wear soft shoes on the shelf, at the same time, around the railing or set up a warning sign and a special command, in order to avoid casualties.
Q:Should I get a Scaffold piercing and hide it from my parents?
dont do it. when your parents say grounded, you may be let off easy but if is about your body then if you get it your in deep ****. also your parents could see this question and then you would be in even more trouble. please dont get it. also things like that are really hard to hide from parents. if your 18 years or older llegally they cant stop you from doing it. i dont think you should do it.
Q:As Hester once did, what time of day did Dimmesdale attend the Scaffold, and what compels his action?
Haven't read this book in years but I believe he goes back to the scaffold at night because he is being eaten away by guilt. It is a type of redemptive action, just as Hester had to stand there and be judged for her sins he feels the need to also stand there on the scaffold with Hester (theoretically) and be judged/punished as well, the only difference, of course, is that he does it under the cloak of night, when no one can see him.
Q:Questions about Scaffold (aka Industrial) piercings?
Ask how long they have been piercing and what certifications (if any) they carry, additionally verify close by regulations to ascertain if any are required. additionally ask how generally they spore verify their autoclave and while it grew to become into accomplished final time. Ask to ascertain a portfolio of HEALED piercings, exceptionally pictures of in spite of piercing you try to get.
Q:What scaffold courses do i need to do to work offshore?
Sorry if I'm not serious, but go to Hong Kong as there they do scaffolding made of bamboo and 170 floors high ,2000mtrs above the sea level... Now that is serious...
Q:Scaffolding????
It refers to the ways that you break a concept and/or a task down using graphic organizers, etc.
Q:how can i prevent my scaffold piercing from getting keloids/infected?
try drying it out with sea salt soaks, tea tree oil, aspirin paste (crushed aspirin and water) , chamomile tea bag soaks !!! keloids are unpredictable , you can get them anytime from changing the jewelry early, irritation, bumping it on stuff or accidentally yanking it , and they will either stay or go away !!! you can prevent infections by cleaning the piercing regularly with anti bacterial soap and sea salt soaks , making sure to use clean hands when handling the piercing and not letting anyone touch the piercing
Q:how long will a scaffold piercing take to heal?
They take around 6-9 months to heal completely...you shouldn't be taking it out at all. I stupidly took mine out after 3 months to clean a bit behind the bar and the bar would never go back through the top hole. It hurt like crap and bled profusely if I tried to push it through.
Q:Can you do the outer scaffolding?
6 15cm. When the oblique rod in a span of two step distance, it is appropriate in the intersection of the large cross bar to add a small bar, the oblique abdominal rod fixed on its protruding end. 7, scissors (1) of the scaffold bridging with columns, longitudinal and transverse horizontal rod synchronous erection, with long scissors along the elevated continuous layout

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range