scaffolding for sale: Cup-lock scaffolding System Pressed Bottom Cup
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 10000 pc
- Supply Capability:
- 10000 pc/month

- OKorder Service Pledge
- Quality Product
- Order Online Tracking
- Timely Delivery

- OKorder Financial Service
- Credit Rating
- Credit Services
- Credit Purchasing
Quick Details
Model Number: | MTH0401-MTH0407 | ||||
.Material: | Steel Q235 | Certificate: | ISO9001:2008 | surface: | galvanized or black. |
Weight:: | 0.27kg. | Name: | scaffolding for sale: Cup-lock scaffoldi |
Terms of payment:
L/C and T/T
experience:
10 years
sample:
free
Packaging & Delivery
Packaging Detail: | To be packed in pallet or carton or Big bags or to buyer's requirement . |
Delivery Detail: | with 20 days after confirming the order |
Specifications
scaffolding for sale: Cup-lock scaffolding System Pressed Bottom Cup
1.Material:Q235
2.surface: galvanized or black.
3.wei
Scaffolding top cup Product Description
scaffolding for sale: Cup-lock scaffolding System Pressed Bottom Cup
1.Material:Q235
2.surface: galvanized or black.
3.weight :0.45kg,0.53kg.
4.sample: free.
Our Advantage
1.Dedicated attitude and attention on metal-forming industry;
2.Specialized in stamping, casting, forging process;
3.Completed product delivery system;
4. We submit required products by reasonable cost;
5. Trustworthy business partner, perfect after-sales service!
- Q:i have my nose pierced and am thinking about getting a scaffold cartilage piercing, but am affraid because your cartilage is so tough! and i know it depends on the person when it comes to pain, but just compairing it to a nose piercing? (when i got my nose pierced i cried, but once they finished piercing it, i wasn't in anymore pain)
- if you get it done with a gun it doesnt hurt at all but you shouldntget it with a gun cz it can shatter ur cartilage . i dont think it hurts at all i pierece mine all the time i ahve about.. 8 in each ear i did them all myself it doesn hurt me tht bad after woards its tender to the touch tths it tho .aah
- Q:Find the demolishing scheme of scaffold
- Removal of scaffolding shall comply with the following requirements:11.2.1 removal operations must be carried out from top to bottom, prohibited from top to bottom operation at the same time;11.2.2 even wall pieces must be removed with the scaffolding layer by layer, is strictly prohibited even after the first wall or a few layers of the demolition of the dismantling of scaffolding; demolition of the height difference should not be greater than 2 steps, such as the height difference is greater than the 2 step, should be added to strengthen the wall;
- Q:If you have two workers say standing on a scaffolding, their are downward forces from the weight of the workers along with the weight of the scaffold, and upward forces from tension suspending the scaffolding in place. The opposite forces add to zero and thus the scaffolding remains at rest.My question has to do with what would occur if more/less workers were on the scaffolding. It appears to me that the scaffolding would always remain at rest. Would there always be a ΣF=0 regardless of the amount of workers? As the decreases in weight from removing a worker would also cause the tension force to be weaker? And vice versa if there were more workers?I
- You are correct so long as the scaffolding is not allowed to move. I.e. the cables suspending it are locked and not unwinding from their spools as more workers get on. More weight added would necessarily increase the tension in this type of case. However, if, when another worker got on and the tension could not increase for what ever reason, a downward acceleration would take place that is proportional to the worker's weight. Hope that clears things up.
- Q:He pushes a can over the scaffold at 15 meters and it takes 3.25 seconds for it to land.I keep doing the problem over and over. the Correct answer is 20.5 m/s, however I keep arriving to the solution of 17 m/s. I solved it by doing Vf^2 = Vi^2 + 2adwhere the initial velocity is zero and the acceleration is -g. I made my coordinate system so that down is negative in which the distance will be negative. This however, did not give me the correct answer. Am I right or is the book right?
- The initial velocity is not zero since the scaffold is moving upward when the can gets pushed over. And final velocity, vf, does not represent the speed of the scaffold (if that is what you're trying to solve). y = (vo)(t) - (1/2)gt? 15 m = (vo)(3.25 s) - (1/2)(9.81 m/s?)(3.25 s)? vo = +20.5 m/s
- Q:What are the general specifications of bowl buckle scaffold?
- Different specifications of the bowl buckle scaffolding accessories in the use of steel pipe materials and fasteners are different, the price is naturally the larger the price will be more expensive. What are the advantages of bowl-scaffold: Processing 1, scaffolding is very simple, the most commonly used 48 steel pipe, welding on the bowl, fastener scaffold steel pipe improvement can even use the traditional.
- Q:Standard Specification for bowl buckle scaffold
- The utility model has the advantages of reasonable structure, simple manufacturing process, easy operation and wide application range, and can fully meet the construction requirements of buildings, bridges and culverts, tunnels, chimneys, water towers and other buildings
- Q:What is the mobile scaffolding materials
- The overall life of cold galvanized mobile scaffolding accessories for about 5 years, the surface does not require maintenance, moderate cost. The main processing technology: the welding of the scaffolding parts and then galvanized, the surface of each part, are galvanized
- Q:Whats a scaffold in ac brotherhood?
- Wrong category. Post under Video and Online Games.
- Q:For indoor use of mobile scaffolding safety construction plan! Four support points with four pulleys with brake!The construction scheme of scaffolding safety belt for indoor high Jiqiu braking pulley, for about 12 meters of buildings, indoor emergency please heroes!
- Wall point setWhen the height is not less than 6.0m, you must set the uniform distribution of wall, its setting should meet the following requirements:Door type steel pipe scaffold: when height is less than or equal to 20m, less than 50m2 of a wall, and even the vertical spacing wall point should be less than or equal to 6m; when the frame of high >20m, not less than 30 M2 a point, and even the vertical spacing wall point should be less than 4m.The other floor (or bottom bracket) scaffolding frame: when high than 20m, a point of not less than 40m2, and even the vertical spacing wall point should be less than or equal to 6m; when the high frame >20m, a point of not less than 30m2, and even the vertical spacing wall point should be less than 4m.The free height of the upper wall of the scaffold is not more than 6m.
- Q:Sweeping rod, large cross bar, small cross bar, scissors brace, vertical pole, right angle fastener, rotating fastener, butt joint fastener, even wall piece! If there is a cantilever frame, the main beam, steel wire rope, such as pull down support
- Steel tubular scaffold. As to the steel pipe, and combined with other type of steel pieces composed of scaffolding, such as the channel has a base in the backwater or scaffolding, connecting steel scaffolding and so on.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Similar products
New products
Hot products
Hot Searches
Related keywords
You Might Also Like