• Ringlock Scaffolding System  Galvanized with top quality CNBM System 1
  • Ringlock Scaffolding System  Galvanized with top quality CNBM System 2
Ringlock Scaffolding System  Galvanized with top quality CNBM

Ringlock Scaffolding System Galvanized with top quality CNBM

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
10 m.t.
Supply Capability:
3000 m.t./month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Quick Details

  • Material: Q235/Q345

  • Diameter: 48.3mm

  • Thickness: 3.25mm

  • Surface: Hot Dipped Galvanized

  • Minimum Order Quantity: 20 tons

  • Packaging Details: Steel Pallets

  • Certificate: CE

Ringlock Scaffolding System  Galvanized with top quality CNBM

2.Packaging & Delivery

Packaging Details:pallet

Model No: RS

Product Name: Ringlock scaffolding system

3.Features:

1. Standard:  Made of 48mm O.D. x 3.2mm thickness high grade steel tube, 1 discal leg 0.5meter, Length: 3000, 2500, 2000, 1500, 1000, 500mm etc. Available, and can be to ordered by you,

2. Ledger: Made of 48mm O.D. x 3.2mm thickness high grade steel tube, length800mm/ 1500mm, length can be ordered.

3. Ring: Made from cast-steel or pressed steel

4. Ledger connection-peg: made from cast-steel,

5. Base screw jack: length 600mmx3.5mm thickness strength tube, length to be order, solid tube available.

6. U head screw jack: length600mmx3.5mmthickness strength tube with U head plate, length can to be order, solid tube available.

7.  Surface: painted/electro (hot dipped) galvanized or to be order

8.  Also can manufacture it as your requirement.

4.The specification componant parts of Steel Ringlock Scaffolding Ledger 

Ring   Lock System Scaffold Ledger / Horizontals

Model

Description

Weight(kg)

Weight(lbs)

AR.L.3050

Ring Lock Ledger 3050mm (10')

11.66

25.74

AR.L.2745

Ring Lock Ledger 2745mm (9')

10.57

26.74

AR.L.2440

Ring Lock Ledger 2440mm (8')

9.47

20.88

AR.L.2130

Ring Lock Ledger 2130mm (7')

8.36

18.43

AR.L.1830

Ring Lock Ledger 1830mm (6')

7.28

16.06

AR.L.1520

Ring Lock Ledger 1520mm (5')

6.17

13.61

AR.L.1220

Ring Lock Ledger 1220mm (4')

5.10

11.24

AR.L.1150

Ring Lock Ledger 1150mm (3'10")

4.84

10.68

AR.L.1065

Ring Lock Ledger 1065mm (3'6")

4.54

10.01

AR.L.910

Ring Lock Ledger 910mm (3')

3.98

8.78

AR.L.650

Ring Lock Ledger 650mm (2'2")

3.05

6.73

AR.L.610

Ring Lock Ledger 610mm (2')

2.91

6.41

5.What is considerations of Scaffolding installation?

There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

(1) scaffold frontage hurtful to prevent falling objects protection is required.

(2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

Q:Mine has passed the healing date and i have had another one put in it's been over 2 months since i had it done...but there is still some swelling on the top half of the ear that is pierced...will it go down eventually or is there something wrong with it?
it will eventually go down. industrials can take up to a year to heal. don't worry about it.
Q:A 75kg painter stands on a 5.5m long uniform plank resting on a scaffold. If the plank's mass is 20kg , how close to the left end of the plank can he stand without tipping the plank? ( The scaffold supports are 2.5m apart, and the plank extends beyond the scafold supports, 1.5m on each end.)
The mass of the plank on the left side of the scaffold is: M? = (20 kg) × (1.5 m) / (5.5 m) = 5.45 kg The distance between the scaffold and the center of mass on the left side is: L? = (1.5 m) / 2 = 0.75 m So the torque of the plank on the left side is: T? = (5.45 kg)×(0.75 m) = 4 kgm The mass of the plank on the right side of the scaffold is: M? = (20 kg) × ((5.5 m) - (1.5 m)) / (5.5 m) = 14.5 kg The distance between the scaffold and the center of mass on the left side is: L? = ((5.5 m) - (1.5 m)) / 2 = 2 m So the torque of the plank on the left side is: T? = (14.5 kg)×(2 m) = 29 kgm Now, say the painter stands at X meter on the left side from the scaffold, so the torque added on the left side is: T? = X × (75 kg) The total torque on the left must be the same as the total torque on the right, so (4 kgm) + X×(75 kg) = (29 kgm) X×(75 kg) = (25 kgm) X = 0.333 m That is the maximum distance the painter can move away from the scaffold, so the distance to the end of the scaffold is: D = (1.5 m) - (0.333 m) = 1.167 m < - - - - - - answer
Q:How many kinds of wheel buckle scaffolding and adjustable wire base and support?
3, the vertical and horizontal spacing of the vertical pole, the horizontal and vertical, the step distance of the bridge should be approved by the erection scheme, is approved by the calculation;4. The vertical and horizontal spacing of the vertical rod can be arranged by 90cm * 90cm, which can meet the requirements of JGJ162-2008 specification and GB50666-2011 specification;
Q:Can a guardrail on a scaffold be used as an access point?
No NEVER! It is a breach of Health and Safety regulations.
Q:how much does a scaffold/industrial piercing cost in the US????i really want one. i know it'll probably hurt.do i have to go to a tattoo/piercing place to get it?i live in europe and here it costs 70 euros which is like $105ish. don't want to pay that much.
it really depends on where you get it done i not really good on math but it should only cost 30 or so check around where you live and see go to a local tattooing shop they should do piercings there for cheap and on the pain level i give about a 6 or 7 depending or youre pain tolarance i hope this helps
Q:What are the requirements for the broken seam connection of bowl buckle scaffold. For example, both sides of the seam on the vertical pole is very neat, with steel pipe
JGJ 1302011 steel tubular scaffolding construction safety technical specification.
Q:So I have 2 paws on my wrist and had my belly done years ago as well as my ears. Now im interested in getting a scaffold piercing but ive been told it hurts, a lot! im not too botherd about the pain cause I know there will be something good at the end but can you tell me more?
i doesn't really hurt at all, just bleeds a lot. about 2 out of 10. less than a belly piercing.
Q:Ariel Atom Supercar, Hypercar or a just a bunch of scaffolding?
No such thing as a Hyper car. It is a Sports car. It does not even classify as a Supercar because its top speed is around 125mph. A Supercar's top speed is 185mph+. A high-end sportscar is 155mph+ A regular sports car is 130mph-155mph. I am counting the Ariel as a sportscar because of its quick acceleration. It is a great car. Very fun to drive. Lasts forever with the Honda Civic engine that it has. It is an exciting car.
Q:i have two holez i the bottom of my ear and now i wanna get something done to the top i want eather a scaffold or a cartlige and a tragus what do you guyz think
i have my tragus done and it didnt hurt at all, so i would reccomend doing the cartilage/tragus, but make sure, just like with any piercing, to keep it clean.
Q:I'm 14 and getting my scaffold pierced soon. I am terrible with nerves and pain. I had a panic attack getting my doubles pierced. To calm my nerves, can you tell me what to expect?
I've passed out getting shots before! Almost to the point where I had a seizure. And I got mine done, and I thought I was going to pass out again! But my lady was really nice. It really doesn't feel like anything more than a lobe piercing, but you feel a bit of a pinch the second time it goes through. Nothing more! You'll be fine. Ask if you can hang around for a bit after to make sure you're okay! Good luck. Just take a deep breath in, then let it out as the needle goes through. Good luck!

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords