Railway Steel Plastic Geogrid

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
500 m²
Supply Capability:
100000 m²/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Black 100% new raw material steel plastic geogrid

suppliers from china

Description 

     Plastic biaxial geogrid with high strength steel wire (or other fiber), through special processing, and polyethylene (PE) or polypropylene (PP), and adding other assistants, by extrusion into composite type high tensile belt, and the surface is rough textured, for high strength reinforced geotextile strips. The single band, the longitudinal, transverse certain space preparation or clamping arrangement, with special reinforcement welding technology welding the connection point bonding and molding, is reinforced with Geogrid. 

Properties

      High stength,small deformation, homogenous stucture, easy for constrution etc. 


Application 

      Make reinforcement treatment for varions kinds of sot soil foundation and strengthen shearing resistance of the soil body,used in reinforcement of retaining wall and widening of old road. 

      It is also used as protect-support net in the coal mine when layer mining of thick (coal) seam, and support of road way in the coal mine. 

Specification 

Specifications

GSZ30-

30

GSZ40-40GSZ50-50GSZ60-60GSZ80-80

GSZ100-

100

GSZ150-150
Tensile   Strength KN/m(LD)≥30≥40≥50≥60≥80≥100≥150
Tensile   Strength KN/m(TD)≥30≥40≥50≥60≥80≥100≥150
Elongation   Rate(LD TD)≤2≤2≤2≤2≤2≤2≤2
Tensile Strength at 1% Elongation Rate(LD)≥20≥32≥40≥48≥63≥81≥125
Tensile Strength at 1% Elongation Rate(TD)≥20≥32≥40≥48≥63≥81≥125
Limit PeelForce at Welded Bonded Point N≥100≥100≥100≥100≥100≥100≥100
Products in the range of coal mineFire out time from outer   flam≤3
Surface   resistivity<1×109< span="">


Packaging Details:according to your need
Delivery Detail:7days


Railway Steel Plastic Geogrid





Railway Steel Plastic Geogrid

Railway Steel Plastic Geogrid

Railway Steel Plastic Geogrid

Railway Steel Plastic Geogrid

Railway Steel Plastic Geogrid

 

FAQ

1. How about the delivery time?   

    Lead time since receipt of 30% T/T deposit payment: 3 weeks.   

2. What kind of payments does jenor support?  

  T/T, L/C, Cash are accepted.

3. What's are the MOQ?  

    We can according to your condition to set the MOQ.

    And we can provide you samples for quality inspection. 

4. Do you charge for the samples?  

    Accordeing to our company policy, the samples are freee, we only charge the freight fee. And we will return the freight fee If you set the order . 

5. Can you produce the product according to customers' requirements ?   

    Sure, we are professional manufacturer, OEM and ODM are both welcome.

6. Can you tell me your main customers?   

    That's our customers' privacy, we should protect their information.   At the same time, please rest assured that your information is also safe here.


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:The difference between polyester glass fiber cloth and glass geogrid
Hello, this is two different products
Q:What is the difference between Geogrid TGSG and GSL?
TGSG is the national standard GB/T17689-2008 double plastic geogrid code
Q:Geogrid construction must be folded back 2m wrapped in compacted packing on it?
Edit this section of geogrid construction notesPaved geogrid should be smooth, paving layer after acceptance, to prevent longitudinal askew phenomenon, according to the width of paving layer or draw white thread, you can start paving, and then use the end of the nail fixed grid (nail 8, per meter wide uniform fixed distance) well, after the end of the fixed grid, with the paving machine will grill slowly pulled forward each shop, shop 10 meters long artificial tightening and straightening once, until a volume grating puwan, put the next volume, operation with a roll of puwan with roller 6T-10T from the starting point to begin the direction of rolling over, (steel rolling as road paving in the surface layer and the leveling layer, the machine is appropriate; such as grid laid directly on the concrete pavement, with the roller roller is appropriate) ground shop: Volume long unit as the laying of the long, the grid should be covered the long shop Full, then the overall check a paving quality, and then paving the next section, the next section of paving, grille and grille can be used lap length 10-15CM, and fixed with nails or wedge to shop in second, to the direction followed by analogy with operating requirements.
Q:How much is the steel plastic geogrid?
Steel plastic geogrid 70KN, 5.5 yuan per squareSteel plastic geogrid 80KN, 6.5 yuan per squareSteel plastic geogrid 100KN, 8 yuan per square
Q:The difference between composite geomembrane and bentonite waterproof blanket
Different waterproof performance. Composite geomembrane: composite geomembrane composite impermeable membrane is divided into one cloth and two membrane. Tensile, tearing resistance, bursting and other physical and mechanical properties of high index, the product has high strength, good elongation, deformation modulus, acid and alkali resistance, corrosion resistance, aging resistance, good performance of seepage control, etc..
Q:The geotechnical material is made of polyethylene (PE) or polypropylene (PP) plate
If it is reinforced soil retaining wall or steep slope, the use of polyethylene products: Specifications: TGDG80 (HDPE), do not know how to view the national standard: GBT17689-2008
Q:Each side of geogrid is not less than 3 meters, what does it mean?
At present, the largest width of single geogrid is 6 meters
Q:I would like to ask what is the definition of the grille in the building? What role? And what kind of?
Know that the grille here is to prevent "reflective cracking" and improve the shear capacity
Q:Introduction of steel plastic grille
Construction technology of steel plastic grille
Q:Where is the geogrid used?
1 strengthen the embankment, can effectively spread the load distribution to improve the bearing capacity of subgrade stability and prolong the service life; 2 can bear larger alternating load; 3 to prevent the loss of crack and deformation, caused by subgrade materials; 4 to fill the retaining wall after the self bearing capacity increase, reducing soil pressure, less retaining wall to save costs, prolong the service life and reduce maintenance costs; 5 with spraying anchor concrete construction method for slope maintenance, not only can save 30% to 50% of the investment, but also can shorten the period of more than 6; in the highway subgrade and surface layer and soil geogrid, can reduce the deflection, reduce rutting, delayed crack the emergence time of 3 - 9 times, can reduce the thickness of the layer structure of 36%; 7 is applicable to all kinds of soil, no place to be drawn, saving time and labor; 8 the construction of simple and quick, can greatly reduce the construction cost.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range