PVC House Fence for Wholesales with New Design
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1000 pc
- Supply Capability:
- 50000 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
PVC House Fence for Wholesales with New Design
1. It can keep good looking for years which are longer than wood fence.
2. You need not to paint or stain. And it can resist being fade.
3. Strong point: aluminium steel inser to reinforce the fence.
4. Our products are environmental friendly and non-toxic.
5. We can offer any length or size according to your needs.
PVC House Fence for Wholesales with New Design show :
Factory Capacity :
Trade Items Of Field Horse Fencing
Packing: | 1. Envirnment PE bag export packing |
2. Carton as customer's request | |
Transaction: | T/T,L/C,D/A,D/P, Western Union |
Payment Term: | FOB,CIF,CFR |
Port: | China main port |
Delivery time: | supply quick delivery time, normally 15 working days |
Sample Cost: | Free sample cost |
Sample Time: | Small piece sample one day, full section sample 2 days |
Service:
1.Sample can be offered with free sample charge and courier fee by buyer's side.
2.We have full stock and can deliver within short time.
3.OEM and ODM order are accepted, Any kind of logo printing or design are available.
4.We offer you the different types of product.
5.Good Quality + Factory Price + Quick Response + Reliable Service, is what we are trying best to offer you.
6.All of our products are produced by our professional workman and we have our high-work-effect foreign trade team, you can totally believe our service.
7.We are very glad that customer give us some suggestion for price and products.
FAQ:
Why choose us ?
1.Commpletely production line. From raw material to delivery, all fences have passed strict tests, so the quality can be assured.
2.Delivery time: about 7 days for a 20ft container.
Where is our main market ?
The products are exported to Northern America, Australia, Canada,Europe and so on.
- Q: How much is one meter for the road barrier?
- Road central isolation guardrail specifications: 0.5-1.3 meters for the conventional height, width of 2 meters or 3 meters two specifications;The center of the road is isolated guardrail type:1, Beijing style guardrail consists of 16 rounds of more than N type connection, also known as the central isolation guardrail, columns generally by 60*80, housing management plug connection, with reflective film;
- Q: I was in a traffic accident. Crashed. Guardrail. Guardrail money is my own consultations, the money or on?. The insurance company went to negotiate compensation
- I was in a traffic accident. Crashed. Guardrail. Guardrail money is my own consultations, the money or on?. The insurance company went to negotiate compensation
- Q: Traffic accidents, after escaping, surrendered, crashed guardrail, no casualties, how will the sentence? 1 will they be in custody? 2 what will be done if the penalty is deducted?
- 3. where a major traffic accident constitutes a crime and escapes, in addition to being investigated for criminal responsibility according to law, the public security organ shall revoke the motor vehicle driving license and may not renew the motor vehicle driving license for the rest of his life
- Q: The role of traffic barrier
- Based on the great promotion and maintenance function of the guardrail on the economic, social and traffic safety of the expressway, many countries have done a lot of work on the research and application of the guardrail. According to [6] records, in 1987 1992 5, Western Europe traffic increased by 16%, while in the period from 1988 to 1992, the German traffic accident rate decreased by 70%; France and Spain also decreased about 20%; the British death rate by 1, 8 people / million to 1.1 vehicles / million vehicles. In recent years, the loss of life and property caused by traffic accidents in western countries has gradually declined, and the emergence and application of all kinds of new traffic safety barriers can not be ignored.
- Q: Sidewalks, overpasses, tunnels, fences, these are traffic facilities or road facilities?
- If there are some signs on the sidewalk, such as signs and signs, they belong to traffic. The fence is part of a separate roadway belt or bridge structure.
- Q: How do you handle a guardrail when you hit the road?
- (five) forcing a motor vehicle driver to drive a motor vehicle in violation of the laws and regulations of the road traffic safety and the driving safety requirements of the motor vehicle, causing traffic accidents and not constituting a crime;(six) in violation of the provisions of traffic control, forced access, do not listen to dissuade;(seven) intentionally damaging, moving or altering traffic facilities and causing harmful consequences, but not yet constitute a crime;(eight) illegally intercepting or detaining motor vehicles, not listening to them and causing serious traffic jams or major property losses.If the actor has one of the second or fourth items mentioned in the preceding paragraph, he may also suspend his motor vehicle driving license; if he has one of the first, third or fifth to eighth items, he may also be detained for not more than fifteen days.
- Q: Reaction traffic barrier problem can not be solved, how to do?
- If the traffic control office does not handle the traffic barrier, you can call the local city government to report or write anonymous letters, feedback problems, there is always a way to solve.
- Q: On the original double yellow line installed guardrail, logo is a double yellow line at the junction of the left, in the corner? Please state the laws and regulations
- The yellow line on the highway should not be riding or pressing, and there should be no turning and turning around the Yellow line.
- Q: In November 26th I caused a traffic accident damaged guardrail section five isolation belt (about ten meters long way), damage to the more than 21 thousand municipal list list, but the insurance company only with loss of 7000 or 8000 yuan, the reason is the two municipal 5K unreasonable valuation plate (only one side of the plate loss picture, the other side no pictures). The two sides deadlocked, my car has been unable to handle the relevant procedures for portable vehicles. How do I deal with such a thing? The two sides of Municipal Insurance have been dragging. What should I do?
- The law stipulates the procedures for handling road traffic accidentsWithin five days from the date of the conclusion of the forty-fourth inspection and appraisal conclusion, the traffic administrative department of the public security organ shall notify the party concerned to collect the detained accident vehicle, motor vehicle driving permit and the seized articles.Escape to the driver of the main vehicle or by notice thirty days after the parties still do not receive the vehicle after the announcement three months is still not to accept the deal, to detain the vehicle in accordance with the law.
- Q: I want to buy an electric car.. Is it necessary to install a guardrail? Does electric car guardrail play a big role?
- Electric cars need to be fitted with guardrails. Should be called the bumper, it is necessary, ah, now the car shell is plastic parts, without touching, there are bumpers can be protected. Bumpers are important to protect cars from damage.
Send your message to us
PVC House Fence for Wholesales with New Design
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1000 pc
- Supply Capability:
- 50000 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords