PRODUCT NAME:Semi-electric Stacker SPM1016/25/30
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 1000 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
PRODUCT INTRO |
Strong robust and classical design |
Semi-electric stacker
Residual Capacity at different lifting height
1KG=2.2LB 1INCH=25.4MM
Up to h3 mm | ACTUAL CAPACITY(Q)kg | |
1500 | 1000 | 500 |
2500 | 1000 | 400 |
3000 | 600 | 300 |
Load centre distance (C)mm | 600 | 800 |
1KG=2.2LB 1INCH=25.4MM
Characteristics | 1.2 | Model of manufacture | SPM1016 | SPM1025 | SPM1030 | |
1.3 | Drive:(electric-battery or mains,diesel, petrol,fuel gas,manual) | manual | ||||
1.4 | Type of operation(hand,pedestrian,standing, seated,order picker) | Pedestrian | ||||
1.5 | Load Capacity /rated load | Q(Kg) | 1000 | |||
1.6 | Load center distance | C(mm) | 600 | |||
1.9 | Wheelbase | y(mm) | 1210 | 1210 | 1210 | |
Weight | 2.1 | Weight(including battery) | Kg | 350 | 495 | 495 |
Wheels | 3.1 | Tyres(solid rubber, superelastic, nylon, polyurethane) | Nylon/PU | |||
3.2 | Tyre size,front | mm | 180x50 | |||
3.3 | Tyre size,rear | mm | 74x70 | |||
3.5 | Wheels, number front/rear | 2/4 | ||||
3.6 | Track width,front | b10(mm) | 680 | |||
3.7 | Track width,rear | b11(mm) | 400/490 | |||
Basic | 4.2 | Lowered mast height | h1(mm) | 1980 | 1830 | 2080 |
4.4 | Lift height | h3(mm) | 1600 | 2500 | 3000 | |
4.5 | Extended mast height | h4(mm) | 1980 | 3070 | 3570 | |
4.9 | Height of handle min./max. | H14(mm) | 790/1156 | |||
4.15 | Fork height lowered | h13(mm) | 85 | |||
4.19 | Overall length | L1(mm) | 1720/1570 | 1720/1580 | 1720/1580 | |
4.2 | Length to face of forks | L2(mm) | 610/670 | |||
4.21 | Overall width | b1(mm) | 777 | |||
4.22 | Fork dimensions | s/e/l(mm) | 60/180/1100 | |||
60/150/900 | ||||||
4.25 | width over forks | b5(mm) | 570 | |||
330~640 | ||||||
4.33 | Aisle width for pallets 1000x1200 crossways | Ast(mm) | 2235 | |||
4.34 | Aisle with for pallets 800x1200 lengthways | Ast(mm) | 2175 | |||
4.35 | Turning radius | Wa(mm) | 1400 | |||
Performance | 5.2 | Lift speed, laden/unladen | mm/s | 90/140 | ||
5.3 | Lowering speed, laden/unladen | mm/s | 120/100 | |||
5.11 | Parking brake | Manual | ||||
E-Motor | 6.2 | Lift motor rating at S3 15% | kw | 1.5 | ||
6.4 | Battery voltage, norminal capacity K5 | V/Ah | 12/150 | |||
6.5 | Battery weight | Kg | 45 |
- Q: What about mechanical and electrical engineering? Employment direction? Employment prospects?
- Graduates can go to all kinds of machinery design and manufacturing enterprises, electronic and electrical enterprises and other production departments, companies, like you, confused, looking forward to the answer, I also learn this, which school you have, employment is very wide,
- Q: What kind of work does a small building mechanic consist of?
- This book is suitable for construction site mechanical equipment management, operation, maintenance personnel as training materials and self-study, reference books. Edit this paragraph editor's recommendation
- Q: i want to sell an unused candle maker
- The questions need to ask yourself are: - Is the weight of the product and corresponding freight cost going to be prohibitive for anyone bidding internationally or far from my local area? - Is my product too specialised for OKorder? - do I need a large national/international group of prospective buyers to ensure a sale? You may in fact be better off finding a more specialised sales platform. Good luck.
- Q: If anyone know supplier of Hydraulic Machinery and equipments in India then please reply me urgently.
- I would like to recommend Pressmex Hydraulics is a manufacturer and exporter of hydraulic equipments and machinery, at Mumbai, Maharashtra in India. Pressmex provided Hydraulic Machinery and Special Purpose Testing Equipments like hydraulic or hydrostatic pressure testing, impact test machine, pipe end caps, bottle thickness measuring equipments, lab deep freezer, humidity chamber, opacity or transparency testing apparatus, constant temperature bath, lab oven, hydraulic pressure measuring equipment, etc at affordable price from Mumbai
- Q: What machinerys did the germans and british use in ww1subs, boats, knives, machine guns, etc?and who had the best?
- Not to mention tanks.
- Q: pls answer. im very confunded
- it depends on your definition of machinery. I define machinery as something with moving parts and a propulsion system. so a hang glider or a bunch of balloons doesn't fit the criteria and both will definitely get you up in the air.
- Q: 2. Prepare balance of Machinery account on following dataOpening Balance on 1 jan 2010 - 1,20000Purchase of new machinery in yr 2010- 60,000Destruction of machinery due to fire - 12000What is balance on Dec 2010
- Assuming all this is at cost and we don't have to worry about depreciation, AND if the opening balance is 120,000, then Opening Balance on 1 jan 2010 - 120,000 + Purchase of new machinery in yr 2010- 60,000 - Destruction of machinery due to fire - 12000 = balance on Dec 2010 $168,000
- Q: mainly in construction.
- Computerized machinery can cut labor costs by automating a lot of tasks. This a given worker produce more in the same time and is thus more efficient. It can also cut waste by reducing errors in measurements and assuring maximum use of raw materials.
- Q: I'm doing a paper and I need to know how space exploration influenced movies around the Apollo era. What technological advances (such as the satellites that appear in the movies) were used in Star Wars?
- I have an interesting comment (as usual). Most of the technology in Star Wars is looking pretty dated nowadays. Either that or it is totally absurd in that we now know that it is either totally impossible or it just would not happen.
- Q: I am trying to decide what i want to settle in and do for a career. I would really like to become a heavy machine operator for road contruction and such. What are the requirements to get into this kinda work and where is a good place to start? I don't have any other contruction experience, i have painted houses and installed satellite for years.
- This is a very good occupation. Many current heavy machine operators were trained on the job. They got this training because they first worked in construction for years, and knew the right people to send them to school. Without a good recommendation from a construction crew leader, or from your union, it will be hard to get this specialized training. You have to prove yourself as being trustworthy, responsible, and able to do complicated problem solving.
Send your message to us
PRODUCT NAME:Semi-electric Stacker SPM1016/25/30
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 1000 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords