PPR 90° Elbow with threaded female take off with SPT Brand

Ref Price:
Loading Port:
Payment Terms:
Min Order Qty:
1000 pc
Supply Capability:
100000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Item specifice:

Brand: SPT Standard: ISO9001 Color: Grey&White&Green

Product Description:


PPR 90° Elbow with threaded female take off with SPT Brand

PPR 90° Elbow with threaded female take off with SPT Brand

Product Applications:

Distribution for cool and hot water
Duct for drinkable water system
Pipes for kinds of high-temperature and low-temperature heating system
Pipes for heating and coolling settings in solar energy system
Connecting pipe for air conditioners


Main Product Features:

Large drum hub to maximize cable life

Self-activating automatic brake hold the load securely when crank handle is released

With cable or strap

Safety guard cover available

Top quality with competitive price

Widely used in the double beam bridge crane and gantry crane

Easy to install and high quality

Compact structure and reasonable design

Could be mounted on t he ground or wall!

Double drum!!


Q1:How Can I Get A Sample?

A1:You can get samples by communicate with our export sales.

Q2:How Long Is Delivery?

A2:Delivery time will be30-45days according to order quantity.

Q3:What Is The MOQ?

A3:MOQ depends on different items.

Q4:What Is Our Normal Payments Terms?

A4:Our normal payment terms now is: T/T, L/C or western union,paypal

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Antistatic flame retardant PE plastic pipe installation, what should pay attention to?
When installing the pipe, the distance between the two socket flexible connections shall be no more than 3 meters. When the length compensation is needed, the pipe can be completely inserted into the socket and then out of the 10mm. Flexible connections between pipes and fittings can absorb thermal expansion of pipes up to 10mm.
Q:What quota should plastic tube be fitted?
In the pipeline installation, the plastic flange sleeve quota can be carried out according to the following conditions: installation engineering, plastic pipe installation, plastic flange installation, included in the flange valve
Q:When calculating the installation of water supply and drainage pipelines, are elbow and pipe fittings calculated separately?
Water supply and drainage pipeline engineering, bends and fittings of the material shall be calculated separately, the installation fee is included in the pipeline installation quota, do not need to be calculated, such as industrial pipeline, the pipe installation fee plus
Q:What are plastic PVC pipes and pipe fittings made of?
Forming equipment: pipe material, extruder, pipe fittings, injection moulding machine.
Q:Plastic Yong connector temperature is too high, how to do? Can reflect the sound quality of PPR tube?
Both ends of each tube should check whether the damage before the construction, in order to prevent the transportation process of the pipe damage, such as damage or uncertainty, pipe installation, port should be reduced by 4-5cm, is not available or the heavy hammer struck the water, to prevent pipe explosion, improve the service life of relative
Q:Natural gas aluminum pipe, what fittings are best the used?
Aluminum plastic pipe in the installation and use, should try to avoid small radius bending, in order to prevent the aluminum tube part of the rupture; at the same time avoid connecting pipe buried in the wall, underground, in order to facilitate inspection and maintenance.
Q:What are the connecting modes of steel wire mesh and plastic composite pipes?
The tube surface melting and melt, melt pipe expansion and full clearance, until the appearance of pipe has two mutually melt, melt together, cooling after molding, pipe fittings are closely connected as a whole.
Q:What's the blind head in the pipe fittings?
That is plug, the role is to suppress the time, plug the export, test pipeline installation sealing, pressure and pipe quality.
Q:The difference between PP-R aluminum pipe and PP-R pure plastic pipe
From the high temperature performance, long-term use temperature of aluminum pipe of national standard is 95. The maximum temperature is 1100 DEG C, and can fully meet the needs of the domestic water: PE pipe as the temperature increases the performance decreased rapidly, only cold water transport: long term use of PP-R national standard tube temperature is 70 degree Celsius. The highest the temperature is 95 DEG C, there are some limitations in the use of hot water tube.
Q:Doubts about the connection of plastic pipe and steel pipe flange?
Plastic pipe flanged fittings such as PPR, to have the corresponding, the flange pipe diameter, as long as the nominal nominal pressure and nominal diameter, nominal pressure pipe, bolt holes can be matched. Because the outer diameter of the pipe has been considered in the pipe fittings, there is no need to worry.

1. Manufacturer Overview

Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range