Plastic Insulated Armoring Cable Machine

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT or LC
Min Order Qty:
1 Set set
Supply Capability:
10 Sets per Month set/month
  • OKorder Service Pledge
  • Quality Product
  • Order Online Tracking
  • Timely Delivery
  • OKorder Financial Service
  • Credit Rating
  • Credit Services
  • Credit Purchasing

Add to My Favorites

Follow us:

specifications:

 

steel wire armoring machine is used for armoring of logging cable,communication cable,elletrical power cable.

characteristics:

steel wire armoring machine has some excellences,high rotating speed,quality good,machine ringdity,lower noise and made a  synchro stranding betwe

two cages etc.

machine compose

steel wire armoring machine consists of pay-off frame,stranding cage,pree-shape stand,tractor,wapping setting,straight alignment,roller,atke-up

traversing and electrical devices etc.

Q:Network wire processing production I want to do a small processing plant, how much cost, how much equipment '?
Hello: You look at the motherboard manual, find the fan interface, usually 3-pin, the other market to sell the fan, usually two plugs, you can access the motherboard or power supply on the two-pin plug. Hope to answer to your help!
Q:If you own the stem shield Gong Dun folder Yong locust fall off the lack of continuous PLC and computer USB port or serial communication cable between the cable, how to find a one-to-one relationship. Because, our factory equipment, one by one line model. anxious! More
"VV39-4 * 1.5" This model may be wrong! Old models are only VV29 (ordinary carbon steel armored PVC outer jacket), the new models are VV22 (galvanized steel tape armored PVC outer jacket), VV32 (thin steel wire armored PVC Sets), VV43 (thick steel wire armored polyethylene outer jacket). Even the innovation is at best VV23 (steel tape armored polyethylene outer jacket), VV33 (thin steel wire armored polyethylene outer jacket). The front of the VV that PVC (PVC) insulation and sheath), behind the 4 * 1.. that 4-core, 1.5mm mm per core square.
Q:Yc-185 cable carrying capacity is how much, what is the current carrying capacity of the cable can calculate it?
This situation I have seen, audio and video lines, video cable connected to the problem, you look carefully according to the line map, no problem, certainly can be resolved.
Q:Substation secondary circuit in a variety of screens and equipment between the cable is how the number, the number of principles is what? The More
A word can not tell, said the mailbox to me to you, I have a special principle of the text
Q:My three friends steal communications cable 3 times, the results were caught by the police, they will be subject to social punishment? Three people have a 17-year-old (will be sentenced to a few years), a total profit amount may be more than .000 yuan. More
Will be sued for the crime of sabotage of public telecommunications facilities, because the amount of profits amounted to .000 yuan, so the actual value of the cable should be higher than that, resulting in greater losses, the amount is huge or the amount is particularly large, so at least Sentenced to more than three years of imprisonment, minor is only a statutory light punishment of the plot, but not the statutory mitigation of the plot, so I suggest you go to the local lawyer to help defend the defense.
Q:Welding machine grounding in the steel platform, may be bad contact, welders in the operation, why will the ground burned out of the cabinet in the electric control cabinet more
I was doing the construction, I encountered in the large steel structure plant, the bridge is generally walking along the crane beam, with the angle and the channel to do another bracket, no crane beams are generally along the pillars, so that the bridge Layout is better looking, but also facilitate the construction. Column of the bridge is also the use of angle and the like to do the bracket, this depends on the requirements of the bridge itself, as in the wall bridge, in fact, encountered a pillar but also turn, although it seems space utilization is big, but in fact To the construction of the inconvenience caused by a lot. Walking along the roof frame I have not encountered before. Can not give you any advice. I only from the construction point of view to consider this issue, not to mention design experience.
Q:Design and manufacturing requirements for mine electrical installations
There are also some special requirements for the surface temperature of general electrical equipment
Q:Which has, know the power of the electrical, choose the cable formulas. And explain it
Need to buy the hardware: not only to buy a router, but also to buy switches or hubs (according to the number of your computer can buy the corresponding number of jacks, such as . . etc.), the time of each computer to the switch to the switch, Long cable, a few. There are two ways to set up a local network is more popular: 1 host dual network card proxy Internet access, take a computer host, host dual NIC, a network card to connect MODEM (external network), a network card to connect switches or hub (network), local area network The computer connected to the switch or hub, to achieve sharing of the Internet, the advantage is relatively stable, not easy to drop, the disadvantage is: host crash or system failure, LAN other computers can not access the Internet. 2 router Internet access. MODEM connected to the router (if your MODEM routing function will not have to buy a router), the router connected to the switch or hub, LAN computer connected to the switch or hub, more suitable for small local area network, landlord can use this approach is relatively simple. In addition, each computer must set the TCP / IP protocol, set the gateway, sub-mask, DNS, IP address (other computer can be set to specify the IP address). Manually set these than do not set the speed faster, huh, huh.
Q:How many meters can the wire test report represent? RT
PVC flame retardant tube can be bent at room temperature, easy to use, according to the outside diameter points D. D. D. D. D. DD. D. D. and D110 and other specifications.
Q:Production enterprises, workshop machines with more than ten thousand cable, should be credited to what subjects, or the cost of this machine together with the fixed assets into the machine.
Lighting never use a line, the circuit to form a loop at least two lines. The lamp does not have the grounding terminal protection, do not need to protect the ground when the line, with two lines; grounding terminal protection need to be grounded when the need for three lines; lamps own battery as emergency lighting, there is a battery without interruption Charge line, which requires four lines. The current lamps are required to bring the ground terminal, connected to the ground, so at least three lines.
Our management policy: customer-centric, market-headed, science-guided, management-guaranteed . Our enterprise spirit: practicality, efficiency, development, innovation. Our aim is to meet customers' requirement and get customers' trust. Our tenet: high-quality product, reasonable price, in-time delivery, complete after-service. Our logos: Development, cooperation, innovation.

1. Manufacturer Overview

Location Hebei,China
Year Established 1996
Annual Output Value US$5 Million - US$10 Million
Main Markets North America
South America
Eastern Europe
Southeast Asia
Africa
Oceania
Mid East
Eastern Asia
Western Europe
Northern Europe
Southern Europe
Company Certifications ISO 9001:2008

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port Tianjin,Shanghai
Export Percentage 31% - 40%
No.of Employees in Trade Department
Language Spoken: English, Chinese, Russian
b)Factory Information  
Factory Size: 10,000-30,000 square meters
No. of Production Lines Above 10
Contract Manufacturing OEM Service Offered Design Service Offered Buyer Label Offered
Product Price Range Average

Send your message to us

This is not what you are looking for? Post Buying Request

Related keywords