• High Output Wire and Cable Machine System 1
High Output Wire and Cable Machine

High Output Wire and Cable Machine

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT or LC
Min Order Qty:
1 Set set
Supply Capability:
10 Sets per Month 45 days set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Detailed Product Description

1.The application of the equipment:

Applicable to monochrome, two-color, double layer and three layer extrusion of

wire and cable made of insulation materials such as PVC, LDPE, XLPE, LSHF, TPU.

2. main component

   1) diameter 630 No shaft pay-off frame                         one piece

   2) Elevating tension straightening machine                      one piece

   3) SJ65 extruder                                            one piece

   4) cooling trough                                           one set

   5) Dry-printing device                                       one piece

   6) Counting device                                          one piece

   7) diameter 600/diameter 350 enclosure traction machine            one piece

   8) Diameter 630mm double shaft take-up machine                  one piece

   9) electric control cabinet                                      one piece

   10) Take-up torque motor control cabinet                          one piece

Q:Which has, know the power of the electrical, choose the cable formulas. And explain it
Need to buy the hardware: not only to buy a router, but also to buy switches or hubs (according to the number of your computer can buy the corresponding number of jacks, such as . . etc.), the time of each computer to the switch to the switch, Long cable, a few. There are two ways to set up a local network is more popular: 1 host dual network card proxy Internet access, take a computer host, host dual NIC, a network card to connect MODEM (external network), a network card to connect switches or hub (network), local area network The computer connected to the switch or hub, to achieve sharing of the Internet, the advantage is relatively stable, not easy to drop, the disadvantage is: host crash or system failure, LAN other computers can not access the Internet. 2 router Internet access. MODEM connected to the router (if your MODEM routing function will not have to buy a router), the router connected to the switch or hub, LAN computer connected to the switch or hub, more suitable for small local area network, landlord can use this approach is relatively simple. In addition, each computer must set the TCP / IP protocol, set the gateway, sub-mask, DNS, IP address (other computer can be set to specify the IP address). Manually set these than do not set the speed faster, huh, huh.
Q:Production enterprises, workshop machines with more than ten thousand cable, should be credited to what subjects, or the cost of this machine together with the fixed assets into the machine.
From what you said that the professional point of view, seemingly also learn computer science and application of it? I am as early as you graduated more than ten years of the brothers, we professional employment is easy, ah, entrepreneurship is also not difficult, as long as do not just graduated or not graduated to put the target set too high like.
Q:Is the cable head in the power distribution equipment plugged
The place where the cracked shovel, I think your home slot should be used to open the kind of straight machine trunking, although relatively good, but the cement can not eat in the smooth trough, there will be filled with cement And the trough between the cracks, which is not professional due to the workers should be mixed with cement mortar and glue to fill the job. There is also a situation, the new house has a few years of construction of the settlement period, will cause local wall cracking, just the trough of the local uneven force caused by cracking
Q:New cable line or overhead cable hybrid line voltage shock experiment how to do
[Cable ZR-YJY-1] indicates a flame-retardant cross-linked polyethylene insulation, polyethylene sheath, ground voltage of 0.6KV, each box minus the voltage of 1KV cable. . ZR - that combustion characteristics, combustion characteristics of flame retardant (ZR, also divided into ABC three, such as ZB), fire (NH, also divided into ABC three, such as NA), halogen-free (W), low smoke Y is the cross-linked polyethylene (XLPE), V is the polyvinyl chloride (PVC); . Y is the material of the insulating material, The standard format should be written 0.6 / 1KV, 0.6KV that the conductor of the "ground" voltage, 1KV that the conductor of the "phase" between the voltage.
Q:How do I install the wire according to the load selection of the cross-section of the wire? China's market which have the specifications of the wire (cross-sectional size) Thank you
General socket with . air conditioning . lighting with 2.. if not special requirements of the general cable 100 meters a plate (actually mostly 95 meters, mention this thing can not but admire the wisdom of the Chinese people. The state of the cable is the error is not more than 5%, so now 100 meters are 95 meters, a few days ago into the .8 box network cable into the last found enough, a calculation of each box minus the national error of 5% Just outside the general do not have this error requirements)
Q:If you own the stem shield Gong Dun folder Yong locust fall off the lack of continuous PLC and computer USB port or serial communication cable between the cable, how to find a one-to-one relationship. Because, our factory equipment, one by one line model. anxious! More
"VV39-4 * 1.5" This model may be wrong! Old models are only VV29 (ordinary carbon steel armored PVC outer jacket), the new models are VV22 (galvanized steel tape armored PVC outer jacket), VV32 (thin steel wire armored PVC Sets), VV43 (thick steel wire armored polyethylene outer jacket). Even the innovation is at best VV23 (steel tape armored polyethylene outer jacket), VV33 (thin steel wire armored polyethylene outer jacket). The front of the VV that PVC (PVC) insulation and sheath), behind the 4 * 1.. that 4-core, 1.5mm mm per core square.
Q:Destruction of cable, truncation of communication lines and destruction of communications equipment, may constitute the crime of public telecommunications facilities, the maximum penalty for many years?
A pole, you have hit, it hurts. The The Later see it will be detour and do not know how long, you have forgotten when you have more pain, and that pole is still there. The The
Q:I would like to know the power cord plug the production process, the equipment used, the details better. Thank you!
There are two ways: . directly to the material into the video track (V track) or subtitle track (T track) . material on the audio and video track (VA track), select the material, right click on the menu In the election "unlock" will be video and audio separation, and then select the audio part, you can delete. "Unlock" shortcut key for the Alt + Y, select the material, press Alt + Y, video and audio separation, and then select the audio part, delete.
Q:Yc-185 cable carrying capacity is how much, what is the current carrying capacity of the cable can calculate it?
The TV and set-top box re-plug the boot should be just fine
Q:The type of cable splitter box for the cable splitter box
En must be hydrochloric acid, you can use the cheapest clean lantern is the drip bottle that acid on the line, the basic can get all the metal solder welding, such as Aries tile must be a little hydrochloric acid to welding, the main principle of acid can make metal surface rust Corrosion, so that the surface is more likely to hang tin, not easy to connect after the metal surface off
Our management policy: customer-centric, market-headed, science-guided, management-guaranteed . Our enterprise spirit: practicality, efficiency, development, innovation. Our aim is to meet customers' requirement and get customers' trust. Our tenet: high-quality product, reasonable price, in-time delivery, complete after-service. Our logos: Development, cooperation, innovation.

1. Manufacturer Overview

Location Hebei,China
Year Established 1996
Annual Output Value US$5 Million - US$10 Million
Main Markets North America
South America
Eastern Europe
Southeast Asia
Africa
Oceania
Mid East
Eastern Asia
Western Europe
Northern Europe
Southern Europe
Company Certifications ISO 9001:2008

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port Tianjin,Shanghai
Export Percentage 31% - 40%
No.of Employees in Trade Department
Language Spoken: English, Chinese, Russian
b)Factory Information  
Factory Size: 10,000-30,000 square meters
No. of Production Lines Above 10
Contract Manufacturing OEM Service Offered Design Service Offered Buyer Label Offered
Product Price Range Average

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords