PL Concrete Batching Machine,an automatic foreground machine

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
100 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Description
PL concrete batching machine is an automatic foreground machine that can works with mixers. It can batch materials automatically on the front desk. According to customers’ specific requirements, this concrete proportioning machine can automatically finish the batching procedures for sand, stone, cement and other special ingredients. This equipment enjoys the merits of accurate weighting, high batching precision, speedy work, strong controlling and easy operation. PL concrete batching machine composes of aggregate silo, weighing system, feeding system, control system and other components.

Applications of PL Concrete Proportioning Machine
PL series batching machines, together with a variety of mixers with corresponding specifications, can form various small and medium-size mixing stations. This concrete batching machine can also be used in autoclaved fly ash brick or sand-lime brick production line.

Features
1. Tengyu PL concrete proportioning machine can effectively guarantee batching accuracy and increase productivity. It is also featured with simple structure, reliable operation and convenient maintenance. Due to accurate measurement, this concrete batching machine can effectively guarantee the quality of fly ash bricks or sand-lime bricks.
2. The machine body adopts split type layout structure, convenient for feeding various materials.
3. PL concrete proportioning machine is well known for its high-level automation.
4. Our concrete batching machines can automatically complete batching according to customers’ concrete proportion.

Attentions
1. When we start the PL concrete proportioning machine, the measurement hopper should be empty. Otherwise, we should manually empty the left materials in the hopper. If it does not display ‘0’, we should press the reset button and make it display ‘0’.
2. If the batching controller of the concrete batching machine does not work normally, we can turn off the power then reboot.
3. After starting up the concrete proportioning machine, the first batching and measurement process is an automatic correction procedure. We will follow the first corrected result to do batching work. Each material will be batched in two stages so as to meet the measurement requirements.
4. When using the PL concrete batching machine, we should notice that the measurement hopper is not stuck by some debris.
5. Before starting this concrete proportioning machine, we need to check whether wires or components in the line are loose or not. If loose, we should connect and reinforce them. It is forbidden to put debris in the hopper.

Specifications of PL Concrete Batching Machine

TypePL800PL1200PL1600
Scale Hopper Volume800 L1200 L1600 L
Store Hopper1500 L*22500 L*33000 L*2
Productivity of PL Concrete Proportioning Machine48 m³/h56 m³/h75 m³/h
Batching Precision± 1%± 1%± 1%
Materials234
Load Height2400 mm3000 mm3000 mm
Belt Speed1 m/s1 m/s1 m/s
Power3*2.2=6.6 kw3*4=12 kw3*4+1*5.5=17.5 kw

Packing and Transportation
Our company adopts nude packing and sea transportation for PL concrete batching machines.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:I am looking for providers of machinery for manufacturing of pressed wood?
For which country? The question is a bit vague. Why don't you search the net for suppliers in your area. You're definitely not going to get answers in here. Good luck.
Q:how is calculated depriciation rate in particular machinery machinery value Rs.450000/-SLM pls salve this prob
pls explain properly.
Q:Running machinery too fast?
f = 1/P, where f is the frequency and P is the period P = 2π/(2πb) = 1/b, so P = b Let v = velocity v = ds/dt = -A sin (2πbt) • 2πb = -2πAb sin (2πbt) Let f* = 2/b, so P* = 2π/(2/b) = bπ v* = -2πAb sin (πbt) The amplitude of the new velocity is 2πb times the original amplitude. Let a = acceleration a = dv/dt = -4π^2Ab^2 cos (2πbt) Let j = jerk j = da/dt = 8π^3Ab^3 sin (2πbt) a* = 8π^3Ab^3 sin (πbt) The amplitude of the new jerk is 8π^3b^3 times the original amplitude. An increased jerk means the machinery is subjected to greater stress, which causes it to break down.
Q:When I was on a farm, I noticed the seat was up on much of the older farm machinery.?
NO just to keep the seat clean from bird poop.
Q:If a company purchased a piece of machinery how to name it on the debit side ?
machinery and book it under the head fixed assets
Q:What kind of work does a small building mechanic consist of?
This book is suitable for construction site mechanical equipment management, operation, maintenance personnel as training materials and self-study, reference books. Edit this section directory
Q:In a company there is a machinery break down so we received insurence claim, whether we need to capitilise it?
That's a question for a tax accountant or chartered accountant; this is auto insurance. Try the Business and Finance forum for a better answer.
Q:looking for experience technical support for engraving & cutting machinery for advise.?
you can go to your nearby locksmith or supermarket asking arnd.
Q:Why does it say do not use before work with heavy machinery on the back of childrens tylenol?
Because at some point, some complete moron took children's tylenol then hopped in a bulldozer and hurt himself. He then proceded to sue the makers of Tylenol and won because they didn't warn him. Or something like that...
Q:whether machinery breakdown insurance excludes design defects defective workmanship?
I would think it would have an exclusion for that, so you would have to pursue the manufacturer.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range