• Perforated Trough Type Gi Cable Tray System 1
Perforated Trough Type Gi Cable Tray

Perforated Trough Type Gi Cable Tray

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT or LC
Min Order Qty:
100 Meters m
Supply Capability:
5000 Metric Tons per Month m/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 

Along with over six decades of quality customer service, it is also involved in numerous organizations that further the betterment of cable tray production and installation.

it is commitment to the bettering of the cable tray and wire management industry is tribute to their long-standing reputation as one of the industry leaders in quality and customer service.

 

Products Range:

 1.Perforated Cable Tray Systems.

 2. Cable Ladder systems.

 3.Cable Trunking Systems.

 4.GRP/FRP Cable Tray Systems.

 5.Wire Mesh Cable Tray Systems.

 6.Aluminum Cable Tray Systems.

 7.Wire Way Systems.

 8.Strut Channel Systems.

 9.Busbar Systems.

Q: Is the bridge mounted above or below the water pipe? Is the top of the heating tube below?
Play thirteen SOSO friends can definitely open the whole effect + high resolution certainly not card
Q: Power cable in the cable tray is a single layer of laying, or can be stacked together with multi-layer laying?
There is no rigid requirement in this area ~ cable has no direct impact on the cable line ~ attention to the corner of the protective measures to do a good job. If you lay the cable line to meet the cable lines, other fiber optic lines or long-distance fiber optic lines, should try to walk in the top of the above position. You do not have to worry about the problem.
Q: What is the national standard of the thickness of the bridge?
You google automatic lift bedroom bed saw, you can choose to buy in Ali
Q: In the bridge of the joints with a number of bolt cover fixed, there is a 20 cm long copper wire prepared by the flat, both ends were lap on the bolt. I do not know the role of this with the flat belt? Who knows, please enlighten me, thank you! More
This can only say "possible"; if you encounter unscrupulous maintenance workers, may be so dry; However, air-conditioning brass as long as the use of its flexibility will become very poor, a little careless will be flat of. Brass tube, the safest way is to replace the brass.
Q: Especially the trough bridge and tray tray, what is the biggest difference between the two? Is there a difference in appearance? More
. if the TV screen appears set-top box to start the image and then prompt "no signal" case, this phenomenon proves that your set-top box and the TV between the audio and video lines (red, yellow, white) connection is basically no problem, but TV radio frequency input signal line (Note: not the red and yellow that three) did not receive the set-top box RF input port, or TV RF input signal line and the wall is not connected to the terminal box, or in your room there are other places where the road. . if the TV screen does not appear set-top box to start the image, then just the blue screen and no text prompts, then that is your TV channel settings there is a problem, please use the TV remote control by source or AV / TV key, the TV from the mold helium chicken meal berry wine every time to change the video channel can be converted to video channels. If the above method still can not be resolved, you must call the local cable TV customer service phone, ask the professional maintenance staff to help. Prompt, no need and do not have to re-search.
Q: How the bridge slot is connected to the ladder
Changhong TV picture-in-picture function in the remote control has a picture-in-picture dedicated button area, this area a total of eight buttons, picture in the picture to cancel the key in the CH- on the right, in the picture in the state and then click the button Is to cancel the picture in the picture.
Q: Renovation project, the cable bridge to pass through the fire shutter doors, but the actual situation at the top of the door beam can not open the hole, next to the bypass construction is very difficult, whether it can be in the rolling door below the ground to add a firewall, the equivalent of raising the fire shutter Floor. Then the bridge is laid along the ground through the newly added firewall. Is there any relevant specification for reference? More
In this short few minutes, the staff to escape, and sometimes smoke, can not see the ground, hit the fire shutter door under the threshold or slope, will such a situation happen? Delayed the escape time, there may be a fire shutter door again down and sealed in the fire scene The consequences to find you
Q: How to lay the multi - layer cable in the trough
What interface do you use? Have you already used a monitor on your computer?
Q: I would like to ask you, you generally do steel plant, how to lay the bridge feel better? I have some drawings, 1. Some of the bridge laying in the I-beam column, 2. Some of the bridge laying on the wall, 3. There are bridges along the steel roof truss lay, I went to know the appearance of steel roof truss, There are winding, chord, the middle of the abdomen is used to insist on the upper and lower sides, but that is along the winding, roof truss sometimes not linear level, sometimes for example triangular steel truss, not the level of the winding how to walk it? Is it easy to walk? Do not know where you design steel plant, the bridge how to design the best, the most appropriate? Thank you! More
What is the number of air conditioning is usually called, according to the air conditioning power consumption to estimate the amount of air conditioning cooling. In general, the habit of using a equal to 2500W of cooling capacity (that is, 25 models), 1.5 is about equal to .3500 amount (that is, 35 models). 1.5 for 16 to 26 square meters. 4 square of plastic copper wire can be 10kw enough to take the green line. 2.5 square steel wire can accommodate 3500W can also be. Preferably 4 square meters of plastic copper line is good
Q: Do not have a very professional, can mark the specific layout, specifications can be
In the PCB design interface, select the power and ground network in the browser. Then edit the properties. Or set before wiring.
We are now engaged in expanding our business scope to the global market and wish to establish mutually beneficial and long-lasting relationships with importers from all over the world. We stick to the belief of "strictly abiding by contracts and keeping credit are key points to be successful and they will lead both ourselves and our customers to a better future".

1. Manufacturer Overview

Location Shanghai, China
Year Established 2009
Annual Output Value US$10 Million - US$50 Million
Main Markets North America
South America
Eastern Europe
Southeast Asia
Africa
Oceania
Mid East
Western Europe
Central America
Northern Europe
Southern Europe
South Asia
Domestic Market
Company Certifications ISO9001:2008

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a) Trade Capacity
Nearest Port Singapore,Vancouver,Brisbane
Export Percentage 81% - 90%
No.of Employees in Trade Department 11-20 People
Language Spoken: English, Chinese, Spanish
b) Factory Information
Factory Size: 3,000-5,000 square meters
No. of Production Lines 6
Contract Manufacturing OEM Service Offered Design Service Offered Buyer Label Offered
Product Price Range Average

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches