• Strut Channel System 1
Strut Channel

Strut Channel

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT or LC
Min Order Qty:
100 Meters m
Supply Capability:
200000 Tons per Year m/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 

Common Size:

 

Size (mm)

Thickness (mm)

Material:

- Pre-Galvanized

- Hot Dipped Galvanized

- Back to Back available

 

- spring nut, bolt, nut & washer are available

27x15

1.2-3.0

41x21

1.2-2.5

41x41

1.2-2.5

 

Hole sizes:

10*25 / 14*28 / 11*25 / 10.5*30 / 12*35mm

 

Our Comnany:

Octopus Metal is specialized in support channel, galvanized steel coil distribution and cable tray manufacture.

We operate 2 large-scale factories with advanced equipments. Our product have passed SGS and CE certification.

Q:Due to the environment is not good, the original buried cable damage many times, want to use the bridge, but the overhead conditions are not allowed, the picture below is the hot water pipe, the above is the hot oil pipeline, but also over three doors more
Because the balance is not good will cause serious consequences for non-standard remote control garage door, please be sure to seek the views of manufacturers; the installation of door balance system, please install the professional staff to carry out the installation of the staff, B) off at least 13m away from the ground, not let the children enough; C) Prohibited near the door of the moving parts; according to the instructions after the installation is completed; after the installation of the control button: A) must see the scope of the door; remote control open, close the garage door to see the door, do not let the children take the remote control; when the door to open the state, and to close the emergency need to be particularly careful to prevent the installation is not Good or spring failure and hit people; installation and wiring must be in accordance with building construction standards and electrical standards if possible, the drive installed in the ground above 21 meters above the place, the clutch should be taken from the ground should be 18 meters; the Hu provided by the provision of the power supply line on the ground lead; the installation of remote control garage door, are not allowed to wear rings, watches or wear loose clothes, the use of solid, the use of strong, Wooden ladder; the installation is complete, the manual hanging in the door, in order to regularly manual safety checks and maintenance Note: If your garage door does not have a side door, please be sure to install a power outage device, so that you can manually open the door from the outside when the power is turned on
Q:What is the difference between a fireproof bridge and a fireproof bridge?
3 * 1 * 0.8 means 3 1 square and 0.8 square core cable. Cable model consists of eight parts: First, the use of code - not marked as power cable, K for the control cable, P for the signal cable; Second, the insulation code -Z oil-impregnated paper, X glue, V PVC, YJ . the inner layer of the code-Q lead package, L aluminum package, H rubber sets, V PVC jacket five, derived code-D No drip, P dry insulation; six, outer jacket code seven, special product code-TH wet tropical, TA dry tropical; eight, rated voltage - unit KV
Q:Cable bridge 2 × (300 × 150) is what
According to the outer diameter of the cable to customize the processing
Q:Cable trough, cable tray, cable tray, cable trench difference. These concepts, I have been confused, please heroes help answer, thank you! More
Z represents the meaning of flame retardant. C on behalf of, generally divided into A, B, C three levels, A level is the highest. YJV22 academic name for the copper core insulated steel tape armored PVC sheathed. Some of the vernacular is: flame retardant C-class armored copper cable
Q:Is not the cable bridge, the whole plant laying a flat iron, each layer of equipment to the ground bus to the bridge on the flat iron, rather than on the bridge. Is this the requirement? More
Grounding flat steel should not be laid in the bridge, the cable bridge should be connected into a reliable electrical channel, every 10 meters should be a reliable grounding once the meaning of the bridge along the laying of long ground flat steel, every 10 meters and the ground wire once. System cable design specifications: Section 3.7.1 The bridge system shall have a reliable electrical connection and ground. Section 3.7.2 When the use of the bridge system to allow grounded trunk circuits should meet the following requirements: First, the tray, ladder The connection resistance between the ends should not be greater than 0.Ω. The grounding hole should be removed insulation coating. Second, in the expansion joints or soft joints need to use braided copper wire connection. Section 3.7.3 along the bridge full length of the other laying ground , The staircase shall be connected at least one point to the grounded trunk in each section (including non-linear segments). Section 3.7.4 For vibrating spaces, a spring washer shall be provided at the connection of the grounding part.
Q:What is the meaning of "cable tray: 200 * 100 middle strip" in electrical engineering
Is the TV connected to the cable? If you can press the TV / av key
Q:There is no fireproof bridge in the cable tray
The trough is closed; the tray is the bottom of the bridge there are many waist-shaped hole to facilitate the heat; ladder of the bottom like a staircase, the side of the baffle, dusty places with ladder, not fouling. The trough and tray are different from the bottom, with holes and no holes. Trough is not conducive to heat, tray heat slightly better.
Q:Always confused the bridge has been linked with copper mesh with a why even laying a galvanized flat iron. More
Repair computer accessories (motherboard) is basically to return to the factory (in addition to the memory is a direct change for the new to you), and now what the boss so much repair their own repair ah -.- burned more serious? At least tell you about what is burning it. There is no burning is not serious argument, only to repair and can not repair these two cases. As for the will not be changed things, unless you have seen, according to phase, or really no way.
Q:Can the cable bridge be on the ground?
See the bridge laying in what place . in the roof of the bridge for the roof of the power supply equipment, you can lay along the ground bridge, but to do drainage and rain. . in the office and other places, due to the need to install the plug, etc., so many buildings in the floor under the overhead layer has laying the bridge, asked to do the equipotential bonding work. Other circumstances, as far as I know there is no laying along the ground
Q:How does the bridge cover set the budget
. the bridge installation quota has included the bridge cover, three links and other accessories installation costs, as long as the bridge and cover the main material fee to adjust it. . the board (Entryboard) is printed circuit board CNC drilling used in the upper cover. The main role of the cover plate is to improve the quality of drilling, improve the yield, is printed circuit board CNC drilling process indispensable to a plate. . the bridge is a support and cable the bracket. Bridge is very common in the use of the project, as long as the laying of the cable will use the bridge, cable bridge as a wiring project supporting a project, there is no special specification guide, a manufacturer's specifications program lack of versatility, therefore, design selection The process should be based on the type of weak cable system, the number of reasonable selection of the applicable bridge. Cable bridge with a wide variety, wide application, strength, light structure, low cost, simple construction, flexible wiring, installation standards, beautiful appearance and so on.
Our company is a professional distributor of Hot Dipped galvanized steels and a manufacturer of various galvanized products and processing machinery. Since two decades ago, our company has been keeping our main focus. Based on our key materials, we have built a complete supply chain from steel sheets to final products for our local and overseas clients.

1. Manufacturer Overview

Location Tianjin,China
Year Established 2006
Annual Output Value
Main Markets North America
South America
Southeast Asia
Africa
Mid East
Eastern Asia
South Asia
Company Certifications ISO14001:2004 ;ISO9001:2008 ;The SGS Certifications Of Cable Tray System

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port Guangzhou,Shenzhen
Export Percentage 31% - 40%
No.of Employees in Trade Department 11-20 People
Language Spoken: English, Chinese, German, French
b)Factory Information  
Factory Size: 50,000-100,000 square meters
No. of Production Lines Above 10
Contract Manufacturing OEM Service Offered Design Service Offered Buyer Label Offered
Product Price Range Average

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords