Other special usage scaffolding system for construction
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 m.t.
- Supply Capability:
- 5000 m.t./month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Thanks to the experienced and professional R& D team of design engineers and product specialists,we obtains 11 patents for its products and certifications acted by relevant certifying authorities. We have an advanced manufacturing base equipped with automatic assembly lines. All of our products line is manufactured in accordance with both National and International technical and quality standards including EN1004:2004, ISO9001& 14001 and other safety regulations with the TUV GS certifications and FAA in aviation industry.
Applicable to the aircraft nose, fuselage, wings, cabin and other parts for the regular maintenance or service maintenance operations, Such as painting, cleaning, mechanical electrical system overhaul, modification, disassembly and replacement of parts
>Featuring the lightweight, fast assembly, safe, durable and cost-effective, Kangde aluminum scaffold has been widely used in the aircraft regular maintenance jobs, such as the maintenance of B737/747/757, A320/330/340/380, MD11/MD90 and some helicopters
>Thanks to our10-year experience in the penetrating of Aircraft maintenance and docking system, we have succeeded in completing about 40 aircraft maintenance projects in China, ranking for 80% market share in this special market.
Part Performance list for Aircraft Maintenance Scaffolding
Xiamen Taigu Airplane Project Co., Ltd. A320 Engine Maintenance Platform
Guangzhou Base of China Southern Airplane. B747 Maintenance Platform
Beijing Airplane Maintenance Project Co., Ltd. Modify Cabin Ladder
West-North subsidiary of China East Airline A320 Nose Scaffolding
West-North subsidiary of China East Airline A320 Airplane Maintenance Platform Modify
Chengdu Base of China Airline A340 & A330 Airplane Aluminum Maintenance Platform
West-North subsidiary of China East Airline A320 Cabin Ladder
Shanghai Air Technology Co., Ltd. MD11 Nose ,Wing Maintenance Platform
North Base of China Southern Airline Bridge, Guardrail ,Horizontal
Beijing Airplane Maintenance Project Co., Ltd. B747 Cargo Freighter working ladder
- Q: Please help me in building professional people (scaffolding)
- Door type scaffolding when used in general decoration, that thing is a direct product, a simple spell on the line, who rent who fightBowl buckle scaffold is also finished steel pipe, but there is no fastener, his fastener is a kind of fixed in the steel pipe instead of the demolition of the scaffolding is more convenient than ordinaryRent depends on the specific market
- Q: Method for inspection of foot hand frame fittings
- Or "low pressure fluid delivery welded steel pipe" GBT 3092
- Q: Which kind of scaffolding is the most convenient and time-saving?
- 4, the new type of formwork is the most suitable for the early removal of the keel, through early demolition can save a lot of keel, formwork and support rod, saving about 30%.5, strong and durable, plug and socket is not afraid to fall, not easy to be dead by cement, easy to transport, easy to inventory. At the same time, there is no loss of spare parts, lower than the bowl buckle type multifunctional scaffold.
- Q: Fastener type steel pipe scaffold composed of components
- Fastener type steel pipe scaffold components are mainly shelf
- Q: How many time was Hester Prynne on the scaffold? why was she on it each time? What about the time when pearl and dimmesdale was on it with her? HELP!!!
- she was on it 3 times once as her punishment for adultery. then at night with pearl and dimmesdale when he was acknowledging his crime and then at the end to hear what is happening at the election or whatever it was. she was the only one up their (putting her at a higher level then the rest of society) and she was still there with dimmesdale when he died.
- Q: So I had a scaffold/industrial done about 10 weeks ago, and its been infected at the top hole only for about 3/4 weeks. It has like a little bubble near the hole and sometimes its filled with pus a little bit and sometimes its not. Well I went the doctors about 2 weeks ago and he prescribed me a weeks worth of antibiotics as well as anti-septic cream. So I took the pills for a week and it was clearing up, I was also applying the cream twice a day. But then yesterday I noticed the lump has gotten a little bit bigger. I don't know what to do, should I take it out? But I really don't want to. And plus the doc said to wait up to 3 weeks and if nothings changed to go back and take it out. If I continue to use the cream, will it eventually go? Thanks :)
- have a piercer look at it.
- Q: Cantilever beam type scaffolding can not exceed the maximum number of not married
- The surface of the board and the bottom of the board should be treated with additional reinforcement.Scaffolding (scaffold) refers to the construction site for the workers to operate and solve the vertical and horizontal transport and erection of various stents. The general term of the construction industry, refers to the construction site used in the external walls, interior decoration or high level can not be directly construction. Mainly in order to work or work on the construction of the perimeter of the safety net enclosure and high altitude installation components, etc., is put on the shelf, scaffolding materials are usually made of bamboo, wood, steel or synthetic materials, etc..
- Q: A 520 kg box sits 1.4 m from the left end. What is the tension in the right hand side wire? (g = 9.8 m/s2) ____________ Newtons
- Because the scaffold is not moving, we can assume that the net Torque acting on the scaffold equals zero. Net Torque = 0 torque = Force x distance (d) Use the left end of the scaffold as the center point. This will eliminate the Torque caused by the left wire (d = 0, so torque = 0) There are now three forces creating torque on the scaffold. There is the weight (m x g) of the scaffold, at 3.5m from the left end. m1 x g x 3.5m There is the weight of the crate, located 1.4m from the left end: m2 x g x 1.4m These two torques are countered by the torque caused by the Tension (T) of the right wire, located 7m from the left side. T x 7m The sum of these torques is zero. (T x 7m) - (m1 x g x 3.5m) - (m2 x g x 1.4m) = zero solve for T T = ((m1 x g x 3.5m) + (m2 x g x 1.4m)) / 7m T = ((115kg x 9.8m/s^2 x 3.5m) + (520kg x 9.8m/s^2 x 1.4m)) = 1.58 x 10^3 N Hope this helps.
- Q: I really want a scaffold piercing and I can pay for it, I get good grades, I do all the chores I have to do, I spoke to them calmly and everything. Yet they still won't let me. My dad said that I will be grounded forever and everything but last time I got grounded, I went to a party the next day so what should I do?
- i wouldn't. it may look rly cool now, but wait til u get older. would a job interview go well with that piercing? or a big hole? just think about that.
- Q: What is the rental price of the mobile scaffolding and accessories now? How to rent a law?
- A set of how much money a day, of course, there are some monthly price calculation
Send your message to us
Other special usage scaffolding system for construction
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 m.t.
- Supply Capability:
- 5000 m.t./month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords