long rail of 500m layer

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-
Inquire Now Customer Service

Contact us by

(1) WeChat
(2) Whatsapp: +8617190086776

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

DPG500 track laying machineis designed in order to meet the requirement of laying jointless track betweenspans of high speed road. It is large automatic dedicated equipment for layingsleepers and long rail at existed line and new line. Using the advancedsingle-sleeper continuous laying method, the equipment does not need a place orequipment for assembling sleepers. Meanwhile, it could lay the tracksaccurately, especially on the curved line, avoiding bevels during the longtrack panel laying process, guaranteeing the precision of operation. It adaptsto laying long rails at ballastless and ballast track.

Performance and parameters

Laying efficiencyemplace 12/min, laying 2.0/shift

Laying steel rail500m60kg/m long steel rail

Accuracy of emplacingsleepers

Error of two sleepers’spacing±20mm

Error of six continuoussleepers’ spacing±30mm

Error between track centerand line center±20mm

Adjustment range of sleepers’spacing400mm-800mm

Operation environment-20-50 Wind:≤6degree Elevation≤2000m

Sleeper typeIII and II type

Curve radius≥400m

Longitudinal scope≤12%

Long distance transportationmax net axis≤20t  construction speed≤100km/h  short distancehanging speed≤32km/h Curve radius to pass≥180m


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Hydraulics (machinery)?
how about a simple hydraulic floor jack
Q:is machinery a fix cost?
Not exactly. Suppose you have a machine that costs $100,000 a year. That pays its debt service and other fixed costs. And the machine can make 100,000 widgets a year. If the machine just sits there, doing nothing, it'll cost $100,000 a year. If it's operating, though, there will be other costs associated with the machinery--repairs, maintenance, etc. So at full production, that machine might cost $150,000 a year. And suppose next year the company needs to make 110,000 widgets. It'll have to buy or lease a new machine, since the original machine has a maximum capacity of 100,000 widgets a year. So while the costs won't rise above $150,000 for the original machine, the company's total machinery costs will rise. Hope that helps.
Q:What exactly does metabolic machinery mean?
Metabolic machinery = the components in an organism that take part in the metabolism of substances/macromolecules.
Q:dat question is related to basic fluid machinery... the reaction turbines?
resultant force acts on the line
Q:What in the world is gene translation machinery?
It's talking about the complement of proteins used to copy the DNA and produce new viruses that are hijacked by the virus. Proteins are like little machines. They're the molecules that do everything in the cell.
Q:overweight exersising machinery?!?
the okorder.com/
Q:Will it ever be possible for scientists to physically stop a earthquake with any machinery or something like t?
no unless its 1 smart azz sun uv a btch
Q:What are textiles machinery?
looms, knitters
Q:What is defined in construction engineering as large machinery?
The specific check check, there are Jixietaiban size division principle in great detail. Construction machinery should be unified in the following twelve categories
Q:i wanna export agriculture machinery to veitnam Markets ,how i find suitable client or buyer?
Why? Most can't afford it anyway. Call Kubota if you really want to pursue this and have money to pay for the equipment.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range