Hydraulic Mobile Scaffolding Platform from CNBM!
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 2 set
- Supply Capability:
- 200 set/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details
Place of Origin: | Shandong, China (Mainland) | Brand Name: | JIURUI | Model Number: | SJY0.3-16 |
Load Capacit: | 300KG | Table Size: | 3150*1800 | lifting height: | 16m |
working height: | 17.7m | Overall Dimensions3: | 3700*2300*2950 | (Optional)Voltage: | 380 / 220/ 110 /415 v |
Power: | 2.2 kw | Net.weight: | 3900KG | product name: | hydraulic platform of scaffolding |
OEM: | yes |
Packaging & Delivery
Packaging Details: | plywood for outside and plastic film for inside |
Delivery Detail: | 15working days after get the rest payments |
Product Description
hydraulic platform of scaffolding for repairing in aerial work
Main feature
1) lifting is stable
2) convenient operation
3) safety and creditbility
4)CE certificated
Parameter:
1. Lift height: 4m, 6m, 8m, 10m, 12m, 14m, 16m, 18m and 20m
2. Load capacity: 300kgs, 500kgs, 1000kgs and 2000kgs
Safety:
1. explosion-proof lock valve to avoid a sudden drop if emergency occurs
2. the limit switch system helps the lift to stop at accurate position.
3. all the work platforms are passed 1.2 times loading test before leaving factory.
4. guarantee: 12 months, we supply spare parts free and supply technical supporting all the time.
Application:
1. It can be moved conveniently, and has bigger platform, bigger lifting capacity to take several people to work on it together.
2. This type aerial lift table is widely used for aerial work, decoration, street lamp maintenance and building cleaning etc.
3. Operation is easy, and the electric components are CE certified.
4. Custom-made product are made according to detailed request, please tell us load weight, lift height, and platform size, our engineer will design a suitable lift for you soon.
Product List:
Model | Capacity | Table size | Max height | Work height | Total dimension | Net weight |
SJY0.3-4 | 300Kgs | 1500×750mm | 4m | 5.7m | 1850×900×1900mm | 400Kgs |
SJY0.3-6 | 300Kgs | 1500×750mm | 6m | 7.7m | 1850×900×1970mm | 650Kgs |
SJY0.3-8 | 300Kgs | 1650×1000mm | 8m | 9.7m | 2100×1200×2460mm | 1200Kgs |
SJY0.5-8 | 500Kgs | 1980×1220mm | 8m | 9.7m | 2500×1550×2380mm | 1400Kgs |
SJY0.8-8 | 800Kgs | 2000×1220mm | 8m | 9.7m | 2600×1550×2640mm | 1700Kgs |
SJY0.3-10 | 300Kgs | 2100×l220mm | 10m | 11.7m | 2700×1550×2380mm | 1500Kgs |
SJY0.5-10 | 500Kgs | 2100×l220mm | 10m | 11.7m | 2700×1550×2380mm | 1600Kgs |
SJY1.0-10 | 1000Kgs | 2220×l220mm | 10m | 11.7m | 2820×1720×2850mm | 2380Kgs |
SIY0.3-12 | 300Kgs | 2550×1500mm | 12m | 13.7m | 3150×1860×2850mm | 2580Kgs |
SIY0.5-12 | 500Kgs | 2550×1500mm | 12m | 13.7m | 3150×1860×2850mm | 2780Kgs |
SJY1.0-12 | 1000Kgs | 2600×1500mm | 12m | 13.7m | 3200×2015×3090mm | 3580Kgs |
SJY0.3-14 | 300Kgs | 2990×1600mm | 14m | 15.7m | 3600×2000×2850mm | 3000Kgs |
SJY0.5-14 | 500Kgs | 2990×1600mm | 14m | 15.7m | 3600×2000×2850mm | 3200Kgs |
SJY0.3-16 | 300Kgs | 3230×l600mm | 16m | 17.7m | 3700×2000×3030mm | 3900Kgs |
SJY0.3-18 | 300Kgs | 3230×l600mm | 18m | 19.7m | 3700×2000×3250mm | 4500Kgs |
SJY0.3-20 | 300Kgs | 3230×1600mm | 20m | 21.7m | 3700×2000×3450mm | 5100Kgs |
We are different,because…
we offer a ‘one-stop-shop’ for all your EWP needs
we can supply a comprehensive range of access equipment for any business or budget
we offer unrivalled support and back-up for all brands and models – we guarantee we can get parts for any machine
we operate a 24/7 call-out and breakdown service in Canterbury and our six CBIP technicians can travel to almost all parts of the South Island
our technicians are accredited to perform six-monthly certifications and we send out service reminders in good time
we carry out machine rebuilds professionally to comply with the Approved Code of Practice for Power-Operated Elevated Work Platforms
we keep a full service history on your machine free of charge
we provide loan machines during rebuilds and extended repair jobs to minimise downtime
we offer a full-service workshop in Christchurch and service the whole country
we are members of The Hire Industry Association of NZ (HIANZ) and The Elevated Work Platform Association of NZ (EWPA)
all our work complies with the Approved Code of Practice for Power-Operated Elevated Work Platforms, as set by The Elevating Work Platform Association (EWPA).
- Q:Working principle of mechanical screw jack
- Screw jack, also known as mechanical jack, is driven by the screw through the screw, screw or nut sleeve as a lifting device. Ordinary screw jack by thread self-locking function support heavy, simple structure, but the transmission efficiency is low, return slow. The self - lowering screw jack has no self-locking function and is equipped with a brake.
- Q:Is there a good steel lifting machine, the crane always binding steel plate, the efficiency is not high?
- Use electromagnetic chuck to lift, do not start loading and unloading
- Q:What's the difference between a horizontal jack and a vertical jack?
- Vertical jack: using hydraulic principle, different from the traditional mechanical jack, it has the advantages of easy operation, safety, reliability, labor saving, mobility and so on.
- Q:What are the protective measures against crane injuries?
- The crane to achieve the "ten not hanging": the hanging weight unknown is not suspended or overload, the command signal not unknown crane, crane, not illegal command hanging rickety bundle not hanging, hanging on someone without lifting, crane safety device is not hanging, hanging objects buried in the underground crane, workplace light the dark line of sight is not clear or not hanging, hanging crane cable-stayed and angular load did not take the corresponding protective measures are not hanging. The lifting operation shall not be carried out under the strong winds of grade six or six.
- Q:Hoisting safety notice
- Measures to prevent falling from the sky (1). The operator must use the seat belt correctly when doing aerial work. The seat belt should be hung high and lowered, and the hook ring at the end of the belt rope will be hung at the top, while the person will operate at the lower level. (2) in the upper use of the lever, people should stand firm, such as nearby scaffolding or already installed components, should be one hand, live, hand operation. Pry into the depth of insertion should be appropriate, if the move from a larger distance, it should gradually move, should not be anxious for success. (3) if workers need to work at high altitude, they should set up temporary operating platform as far as possible. The operation of Taiwan as a tool, the width is 0.8 ~ 1 m temporary splint in the upper column angle, below the location of 1.0m ~ 1.2m, and the welding work of workers can be corrected in the roof above. (4). For walking in the high altitude suspension truss on, should be set up on the safety railing. (5) ladders for climbing must be firm. When used, the rope must be fastened to the fixed member. The angle between the ladder and the ground is generally 65~70 degrees. (6). By the operator in the scaffold board, should be focused on, to prevent lead plate. (7) when installing a reserved floor or roof board, it should be covered with wooden planks in time. (8) the operator shall not wear hard soled shoes for aerial work.
- Q:What are the points for attention in the course of transportation of double beam cranes?
- Transportation conditions, transportation conditions, including on-site transportation, road construction, inspection and commissioning, etc..(1) construction of road transportation on site. According to the shipping component vehicle load size, body size, grade and standard requirements to determine the construction of temporary road pavement width and subgrade, pavement structure, construction site of the road transport people.(2) check the routes and routes. Transport drivers in Zhengzhou steel company and the relevant personnel along the exploration of transport routes, smooth road, road slope and road turning radius, or wire obstacles such as bridge and culvert clearance size are higher.(3) test run. The transport frame of the largest size component shall be installed on the vehicle, and the dimensions of the components shall be simulated and tested along the transport road.
- Q:Classification of lifting tools
- Lifting tools can be divided into light and small lifting equipment, hoist and overhead monorail system according to different structures.
- Q:What are the points for attention in the course of transportation of double beam cranes?
- Transportation conditions, transportation conditions, including on-site transportation, road construction, inspection and commissioning, etc..(1) construction of road transportation on site. According to the shipping component vehicle load size, body size, grade and standard requirements to determine the construction of temporary road pavement width and subgrade, pavement structure, construction site of the road transport people.(2) check the routes and routes. Transport drivers in Zhengzhou steel company and the relevant personnel along the exploration of transport routes, smooth road, road slope and road turning radius, or wire obstacles such as bridge and culvert clearance size are higher.(3) test run. The transport frame of the largest size component shall be installed on the vehicle, and the dimensions of the components shall be simulated and tested along the transport road.
- Q:What are the heavy lifting units commonly used in hoisting operations?
- Lifting belt, wire rope sling and crowbar size etc.
- Q:Do hardware or plastic factories have no need for cutting tools?
- Cutting tools must be needed. Hardware accessories refer to some small hardware, such as door locks, hinges, nuts and other mechanical components.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Hydraulic Mobile Scaffolding Platform from CNBM!
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 2 set
- Supply Capability:
- 200 set/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Related keywords