High Temp Flexible Duct High Carbon Steel Wire
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Specifications
1. high carbon spring wire
2. Wire dia:0.4-13mm
3 .Standard:DIN17223 GB4357-89
4 .Delivery time:15 days 1*20FCL
5 .MOQ:1 Ton
1. Specification
Material | 45#,60#, 65#, 65Mn, 70#, 72A, 72B, 80#, 82B,SAE1060, SAE1065, SAE1070 |
Dia | 0.3-13.0mm |
Surface | Smooth, phosphated and lead patent heat treatment |
Quality inspection of each coil | Tensile Strength, Tolerance, Surface smooth, Torsion,Bending,Winding, Ellipse , etc. |
Certificate | ISO9001,ISO14001,SGS,Jiangsu Famous Brand , Excellent Quality Metallurgical Products |
Standard | DIN17223/1-1982,GB4357-89 and other standards . |
Application | making springs, steel ropes, cable wires, mattress ,banding wire |
Coil weight | 15KG-200KG per coil or as per your requirement |
Packaging | coils, packed with P.P.cloth or according to customers' request. |
Dilivery time | 15 days for one 20 feet container. |
Loading Capacity | Loading about 20tons in one 20's containe |
Tensile Strength
High Carbon Steel Wire | |||
wire diameter(mm) | Tensile Strength(N/mm² ) | ||
Grade B | Grade C | Grade D | |
0.20 | 2150-2550 | 2400-2790 | 2690-3090 |
0.25 | 2060-2450 | 2300-2700 | 2640-3040 |
0.30 | 2010-2400 | 2300-2700 | 2640-3040 |
0.40 | 1910-2300 | 2250-2650 | 2600-2990 |
0.50 | 1860-2260 | 2200-2600 | 2550-2940 |
0.60 | 1760-2160 | 2110-2550 | 2450-2840 |
0.70 | 1710-2110 | 2060-2450 | 2450-2840 |
0.80 | 1710-2060 | 2010-2400 | 2400-2840 |
1.00 | 1600-2010 | 1960-2300 | 2300-2690 |
1.20 | 1620-1910 | 1910-2250 | 2250-2550 |
1.40 | 1620-1910 | 1860-2110 | 2150-2450 |
1.60 | 1570-1860 | 1810-2160 | 2110-2400 |
1.80 | 1520-1810 | 1760-2110 | 2010-2300 |
2.00 | 1470-1760 | 1710-2010 | 1910-2200 |
2.20 | 1420-1710 | 1660-1960 | 1810-2110 |
3.00 | 1370-1670 | 1570-1860 | 1710-1960 |
4.00 | 1320-1570 | 1520-1760 | 1620-1860 |
5.00 | 1320-1570 | 1470-1710 | 1570-1810 |
6.00 | 1220-1470 | 1420-1660 | 1520-1760 |
7.00 | 1170-1420 | 1370-1570 |
|
8.00 | 1170-1420 | 1370-1570 |
|
9.00 | 1130-1320 | 1320-1520 |
|
10.00 | 1130-1320 | 1320-1520 |
|
11.00 | 1080-1270 | 1270-1470 |
|
12.00 | 1080-1270 | 1270-1470 |
|
13.00 | 1030-1220 | 1220-1420 | |
*Chemical Composition
Steel Grade GB Standard | Carbon % | Silicon % | Manganese % | Phosphorus % | Sulphur % | Chromium % | Nickel % | Cuprum % |
60# | 0.60-0.61 | 0.18-0.22 | 0.52-0.59 | 0.012 | 0.007 | 0.06-0.07 | 0.05 | 0.18 |
65# | 0.65 | 0.21 | 0.56 | 0.013 | 0.008 | 0.05 | 0.04 | 0.14 |
65Mn | 0.60-0.70 | 0.10-0.25 | 0.70-1.00 | 0.030 | 0.030 | 0.20 | 0.20 | 0.25 |
70# | 0.69-0.71 | 0.19-0.21 | 0.53-0.58 | 0.010-0.012 | 0.003-0.006 | 0.01-0.05 | 0.02-0.04 | 0.04 |
72A 72B | 0.72 | 0.19 | 0.71 | 0.013 | 0.006 | 0.02 | 0.02 | 0.03 |
80# | 0.80-0.81 | 0.22-0.24 | 0.59-0.76 | 0.008 | 0.004 | 0.04 |
|
|
82A 82B | 0.82 | 0.24-0.25 | 0.76-0.77 | 0.011-0.014 | 0.004-0.007 | 0.17-0.17 |
| |
2. Packing
Small coil or large coil for the steel wire : Coils, packed with P.P.cloth or according to customers' request
Z2 packing :200-350KF per coil
Iron spool or wood spool for the steel wire
3. Our service
Sample order: we supply you free sample, you pay for the express cost, which can be shipped in 3 days
Our promise: Send you a workable price ;
Delivery in time;
Service you in lifetime for free;
Full refund if substandard goods
- Q: Drain flexible pipe to keep the base design above the elevation of the number of meters
- Flexible pipe with metal materials, such as metal mesh, organ, etc
- Q: Can the kitchen sewage pipe pass through the walls of the stove wall?
- scaffolding pole base with the height must be high longitudinal bar to the lower extension of the two spans and pole fixed height difference should be 1m by slope slope of the vertical axis of the slope should be 500mm single, double Row scaffolding bottom step should be 2m single row, double row and full of scaffolding stand in addition to the top of the top step outside the other layers of each step must be connected with the fastener scaffolding pole connection, lap should be consistent with the column Provisions: the use of connecting rods should be staggered with two adjacent rods should be arranged to set the synchronization within the synchronization within the separation of the two-phase separation of the distance from the distance to 500 mm; each connected to the main node the use of lap joint lap joint should be at 1m and should be used less than 2 rotating fasteners fixed end fastener cover edge to the rod end distance should be 100mm scaffolding Pole top rail bar should be high wall end 1m should eaves mouth 15m
- Q: The sound of water pipes will not produce infrasound damage to the human body?
- The general pipe and pipe material to connect manufacturers to supply matching, so that more to ensure quality
- Q: Safety evaluation: gas pipeline and discharge pipe should not be set between the valve, what is the specification of which provisions?
- 028W / MK) and enduring excellent insulation and compression performance, compressive strength up to 220-500Kpa
- Q: Why should the flexible hose be set in the mechanical ventilation system?
- Bowl buckle price is high! There are many buckle-style markets, so rent up cheap!
- Q: CAD type too much (including civil engineering, interior spring design, motor, machinery manufacturing and many other), a beginner how to choose?
- The concrete structure has been included in the structure, but the concrete structure is a concrete structure, but the structure is just a frame structure without concrete structure; another steel structure and concrete structure is a good idea but to do Less, the third floor is said to be the main structure of the original structure, masonry works using concrete, then this will undoubtedly increase the cost of the house, if not very high floor or earthquake area is clearly not economical
- Q: What is the difference between the D-LD2000 clamp-type flexible fittings and the KRJ-type clamp-type flexible fittings?
- Hello, super pole is a completely different PC concept. English name Ultraboo compensation 紶 barnyard cough twisted half hole report film k. Ultrabook is Intel continued MID, notebook, the definition of another new category notebook products, the Chinese translation for the ultra-"very" this. I hope to be helpful to you.
- Q: Is the flexible sleeve of the broken wall used as a second retest?
- The national standard is 18kg. Color steel sandwich panel is a common product in the current building materials, do not chu chu dumpling seal festival over the extinguished Long can only be a good flame retardant and environmentally friendly and efficient. Caigang sandwich board has two layers of metal panels and the middle of the polymer core insulation from the suppression. With the installation is simple, light and efficient light and efficient features. And the filling system used to close the molecular structure of the closed, you can put an end to the condensation of water vapor.
- Q: Where there are wear-resistant tube, high temperature ceramic tube
- . different fire rating: Yanmian sandwich panels for the A-level, EPS for the B3-class, polyurethane B1 level. . different insulation properties: the three polyurethane sandwich panels the best. . waterproof performance is different: the three polyurethane and EPS better than rock wool. . the density of different: rock wool bulk density is generally 120KG / cubic meter, EPS is generally . the polyurethane is generally 40. In short, the overall performance of polyurethane sandwich panels try to catch the pole to make the best words, Building Enclosure Best! I have a number in my profile
- Q: Maintenance Skills of Leakage of Fire Pipe Clamp Joint
- On the use of steel pipe rack (double pole) support, the specific step to be self-checking, if it is 9 meters high, should be taken out of the full frame, the middle of the spine set must be standardized, in fact, we usually do high-level conversion layer beam is very common You share the board as a beam {face - line load}. On the line is not very complicated. Circular arc positioning to be accurate, first to do stereotypes better.
Send your message to us
High Temp Flexible Duct High Carbon Steel Wire
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords