Flexible Duct Pipe - Best Selling Flexible HVAC Ducting
- Loading Port:
- Shanghai
- Payment Terms:
- TT or LC
- Min Order Qty:
- 500 pc
- Supply Capability:
- 100000 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Application and benefits of Flexible Duct
-Applied in air conditioning/ventilation systems
-Tear and puncture resistant
-Corrosion resistant
-High flexibility
-Convenient installation
-No toxic gas emission
Non-insulated Flexible Duct
Structure: double-layer aluminum foils +1 layer of PET film.
Structure: 1 layer aluminium foil+ 1 layer of PET film
Insulated Flexible Duct
Structure: 1 layer of Alu. Foil+1 layer PET film+insulated glass wool
Outer jacket: 1 layer of Alu.foil
Glass Wool Density: 16kg/m3; Thickness: 25mm
Insulated Acoustic Flexible Duct
Structure: 1 layer of Alu. Foil+1 layer PET film+insulated glass wool
Outer jacket: 1 layer of Alu. Foil + 1 layer of PET film
Glass Wool Density: 32kg/m3; Thickness: 25mm
Combined Flexible Duct
Structure: flexible duct PVC jacket.
REMARK: Special structure is available according to customer's requirements
Pictures of Flexible Duct
FAQ of Aluminium Flexible Duct:
1. What temperature maximum? Our products: 150℃ and 250℃
2. What MOQ? Our MOQ: 500 pcs
3. What payment terms? We accept T/T and L/C
4. Lead time: 10 days
5. Packing: Nest packing for non-insulated flexible duct, then into plastic bag for non-insulated flexible duct or packed in individual carton box.
- Q:Drain flexible pipe to keep the base design above the elevation of the number of meters
- , there are cloth-based materials, such as Teflon cloth, etc
- Q:Rigid pipes differ from flexible piping, those are rigid pipes that are flexible piping
- Can be made of polystyrene particles by the pre-die into the steam completely foam self-adhesive after the formation of foam block through the line to form a polystyrene board
- Q:For example, HDPE pipe with a flexible connection is a flexible interface, PVC-U of the glue plug-in method, is just helium pouring a lie on the pizza pull the interface, wire then, flange it more
- PM25 and other dust particles mosquito 4 The The The One of the most critical is that the window is not New Zealand, to know that China's outdoor air quality is very bad And closed doors and windows (especially air conditioning or warm and warm equipment must be closed when the window), the indoor air in a variety of superimposed pollution (decoration pollution, carbon dioxide exceeded)
- Q:Do you have a natural gas hose in the flue?
- Look at where, install and dismantle about a total of 50 yuan a square it The activities of the activities of the Central Chamber of Commerce Co
- Q:How to effectively deepen the construction process management to improve the quality of construction projects
- Oh there seems to be no. I have not seen on the Internet, if there is a thank you to thank
- Q:Why should the flexible hose be set in the mechanical ventilation system?
- The contents of the special construction plan: engineering overview, preparation basis, construction plan; process technology, safety assurance measures, labor plans, calculation books and related drawings.
- Q:Cast iron flexible tube A type B What is the difference
- See JGJ130-2011 "construction of fasteners steel scaffolding safety technical specifications" 'structure of the valve enamel crisp raccoon Yi Yi paralysis nitrogen Kai made requirements'. ... set the steel pipe as a foot, the first step from the first 1.95m, steel pipe spacing of 2m, two steel pipe between the small
- Q:We now have to declare the Department of the Ministry of the United States and the United States, the company said that the access point to our own set, so I would like to ask, what is the requirements of this access point? There is no relevant specification to add: is the construction, the outdoor pipe network in the gas access point position more
- Construction workers classification and breakdown of ordinary types of work
- Q:Is the clamp type flexible connector connected to the pipe to the rubber pad?
- 1. Civilized construction program 2. Safe construction program 3. Template construction program 4. Scaffolding construction program 5. Sambo four construction program 6. Temporary electricity construction program 7. High operating construction program 8. Tower crane construction plan 9. Multi-tower operation anti-collision construction program 10. Emergency emergency plans 11. Winter rainy season construction program 12. Significant hazard assessment measures 13. Construction organization design 14. Building energy conservation program 15. Basket construction program 16. Tower crane hoisting program
- Q:To ask why the use of clamps connected to the spray pipe after the flush again after the water there will be a lot of hook link position leakage phenomenon? Thank you! The The
- The use of air conditioning precautions in the instructions have been introduced on the plain, but very few consumers will carefully read the instructions
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Flexible Duct Pipe - Best Selling Flexible HVAC Ducting
- Loading Port:
- Shanghai
- Payment Terms:
- TT or LC
- Min Order Qty:
- 500 pc
- Supply Capability:
- 100000 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Hot Searches
Related keywords