Ventilated Flexible Duct For HVAC

Ref Price:
Loading Port:
Payment Terms:
TT or LC
Min Order Qty:
Supply Capability:
200000 m/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Ventilated Flexible Duct For HVAC


1.Structure of Aluminum Flexible Duct for HVAC

Aluminum Flexible Duct is widely used in Heating, Cooling, and Air Conditioning (HVAC) systems for air ventilation    applications. Flexible Duct provides greater thermal efficiency to save energy. Because it is flexible, it is easy to run  around and through obstacles in the building.

Flexible Duct Usage:

1. Ventilation system, Extraction of solvents, Extraction of corrosive gas and fumes

2. Low pressure application, Transfer of hot and cold air, Air conditioning

3. Vehicle construction, Engine construction, Exhaust fumes extraction

2.Main Features of Aluminum Flexible Duct for HVAC

1. It's a range of fully flexible un-insulated aluminum PVC laminated ducting, it is easy to connect to ducting

2. Highly flexible

3. Excellent resistance to chemicals

4. Small bending radius

3. Aluminum Flexible Duct for HVAC Images


Ventilated Flexible Duct For HVAC

4. Aluminum Flexible Duct for HVAC Specification








20 m/s


2500 Pa




7.6M OR 10M


We have organized several common questions for our clientsmay help you sincerely

 ①What’s the Application for the products?

Flexible Duct is widely used in Heating, Cooling, and Air Conditioning (HVAC) systems for air ventilation    applications. Flexible Duct provides greater thermal efficiency to save energy. Because it is flexible,it is easy to run  around and through obstacles in the building.

     What’s the Advantages for the products?

              No need special tools for cutting

  In case of fire no toxic gas are emitted

The product have been successfully tested for fire resistance

Can be bent in any direction

     How long can we receive the product after purchase?

In the purchase of product within two working days, We will arrange the factory delivery as soon as possible. The specific time of receiving is related to the state and position of customers. Commonly 7 to 10 working days can be served.


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Home 2 air conditioning is the cooling of electricity or heating electricity? How much power is spent in hours
But after all, is the master you want to Zhuo good jade is certainly a lot of difficulties, whether it is Longfeng Pei or other subject matter need a lot of effort in addition to the need for technical research also need to continue to learn theoretical knowledge, especially
Q:External wall insulation method of operation There are several combinations of materials
Seeking the existing building construction specifications Daquan! The The @ .com
Q:Space blowing wind is not cold how is it?
The general level of more than 12 layers when you need to use.
Q:Air conditioning ventilation when the sound is a big reason
According to my specific circumstances, in the following seven major hazards include the division, sub-project focus on control
Q:The installation method of ordinary air conditioner. The more detailed the better. Please thank you all
The basic operation of the same, but the different requirements of different professional, or to determine the direction of good, and then hands.
Q:Public building design, the building structure and water is generally designed by the Architectural Design Institute, air conditioning and ventilation is based on the design of the interior? Or first air conditioning ventilation?
Aluminum alloy metal shell better than the plastic shell; we all know that most of the market is now charging the lithium battery, lithium battery is the only drawback is the possibility of a long time with the explosion, so the use of aluminum Alloy shell, much better than steel; polymer battery is good, but the price is expensive,
Q:Air to water heater host and air conditioning host is not the same
Issued a test report, Detection can be used to pass, failed to use!
Q:The United States direct mail dyson hp01 Dyson air purification cooling machine triple in the country to warranty it
Among them, the extruded polystyrene gypsum composite board is based on paper gypsum substrate, the use of adhesive and extruded polystyrene board through the factory processing compound
Q:Do 3cm thick wall insulation how much kilogram of slurry and how many kilograms of polystyrene particles
You are talking about the construction measures it is not the house measures it, because the house has a construction of Huohuohuohuo number of leather and bronze sculpture drawings and specifications, high-rise building scaffolding should be lightning protection measures, that is, under the scaffolding around Reliable grounding (not less than four times, not less than 16 square copper core BV line), if it is pick plus, and the house can be connected to the pressure ring. Tower crane I will not say, upstairs has been said.
Q:Single cold air conditioning function can not change the cold and warm?
External wall insulation should pay attention to what the details?

1. Manufacturer Overview

Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range