Aluminum Flexible Duct with CE Certificate

Ref Price:
$1.50 / pc
Loading Port:
Shanghai
Payment Terms:
TT or LC
Min Order Qty:
500 pc
Supply Capability:
100000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Application and benefits of Flexible Duct

-Applied in air conditioning/ventilation systems

-Tear and puncture resistant

-Corrosion resistant

-High flexibility

-Convenient installation

-No toxic gas emission

 

Non-insulated Flexible Duct

Structure: double-layer aluminum foils +1 layer of PET film.

Structure: 1 layer aluminium foil+ 1 layer of PET film

 

Insulated Flexible Duct

Structure: 1 layer of Alu. Foil+1 layer PET film+insulated glass wool

Outer jacket: 1 layer of Alu.foil

Glass Wool Density: 16kg/m3; Thickness: 25mm
 

Insulated Acoustic Flexible Duct

Structure: 1 layer of Alu. Foil+1 layer PET film+insulated glass wool

Outer jacket: 1 layer of Alu. Foil + 1 layer of PET film

Glass Wool Density: 32kg/m3; Thickness: 25mm
 

Combined Flexible Duct

Structure: flexible duct PVC jacket. 

REMARK: Special structure is available according to customer's requirements

 

Pictures of Flexible Duct  

 

FAQ of Aluminium Flexible Duct:

1.             What temperature maximum? Our products: 150 and 250

2.             What MOQ? Our MOQ: 500 pcs

3.             What payment terms? We accept T/T and L/C

4.             Lead time: 10 days

5.             Packing: Nest packing for non-insulated flexible duct, then into plastic bag for   non-insulated flexible duct or packed in individual carton box. 

 

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What materials are made of flexible pipes? Why should the mechanical ventilation set the flexible tube? Where should I be located?
It is recommended to use the home of the heart of the card to worry about toughness to fill the joints, and then paste the seam (master understand) if directly in the sandwich panel (plate) on the batch of putty powder or spray painted really easy to drop off the phenomenon of stone, the first primer, it is recommended to use the home of the German brand brackish scraping scraping again There are), to be dry and then approved scraping putty powder spray really stone paint
Q:Is the clamp type flexible connector connected to the pipe to the rubber pad?
1. Civilized construction program 2. Safe construction program 3. Template construction program 4. Scaffolding construction program 5. Sambo four construction program 6. Temporary electricity construction program 7. High operating construction program 8. Tower crane construction plan 9. Multi-tower operation anti-collision construction program 10. Emergency emergency plans 11. Winter rainy season construction program 12. Significant hazard assessment measures 13. Construction organization design 14. Building energy conservation program 15. Basket construction program 16. Tower crane hoisting program
Q:What is the effect of concrete pouring on the construction quality?
, why should set the flexible pipe, because all the materials are hot and cold shrink, you layout the pipeline When the temperature and your future use when there is a difference in the temperature and the thermal stress when processing, if not Ji plant perfection Dao Ghost voucher set the flexible pipeline, the pipeline will have a lot of internal stress, long-term alternating role will Resulting in pipeline damage, set a lot of places, such as straight pipe, to a certain length must be set, the inflection point also need to set, these settings you can be in the mechanical design manual pipe chapter check out
Q:Composite pipe and flexible tube which aspects of the difference
Lap is in the concrete structure of the component, the length of steel is not enough, according to the requirements of the two steel will be superimposed on each other and the formation of the connection The basic forms of steel connections are: lashing lap, welding, mechanical connection several categories Scaffold (scaffold) refers to the construction site for workers to operate and solve the vertical and horizontal transport and erected various stents General terms of the construction industry, refers to the construction site used in the external walls, interior decoration or high height can not be directly the construction of the place Mainly for the construction workers up and down work or external safety net enclosure and high-altitude installation components, said white is the shelf, scaffolding production materials are: bamboo, wood, steel or synthetic materials Some projects are also used as scaffolds when the template, in addition to the advertising industry, municipal, traffic, road and bridge, mining and other departments are widely used
Q:What is the difference between a rigid pipe and a flexible pipe, what kind of pipe is rigid, what is flexible
national, provincial and municipal projects related to the construction of policies, laws, regulations and the relevant industry regulations
Q:CAD type too much (including civil engineering, interior spring design, motor, machinery manufacturing and many other), a beginner how to choose?
The concrete structure has been included in the structure, but the concrete structure is a concrete structure, but the structure is just a frame structure without concrete structure; another steel structure and concrete structure is a good idea but to do Less, the third floor is said to be the main structure of the original structure, masonry works using concrete, then this will undoubtedly increase the cost of the house, if not very high floor or earthquake area is clearly not economical
Q:How is the flexible tube of FRP composite pipe defined
Filling system is also used to close the molecular structure, you can put an end to the condensation of water vapor
Q:Talk about the class flexible management of the class teacher what the requirements
metal hose diameter generally from 5mm to 100mm
Q:Maintenance Skills of Leakage of Fire Pipe Clamp Joint
On the use of steel pipe rack (double pole) support, the specific step to be self-checking, if it is 9 meters high, should be taken out of the full frame, the middle of the spine set must be standardized, in fact, we usually do high-level conversion layer beam is very common You share the board as a beam {face - line load}. On the line is not very complicated. Circular arc positioning to be accurate, first to do stereotypes better.
Q:What are the scope of construction work special operators?
This look at their own interest, ah, I was learning mechanical, or from the mechanical drawing began, in the study of tolerance, technology, design, etc., there are many, but also learn a three-dimensional software, like proe

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range