high carbon steel wire in good quality
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Specifications
1. high carbon spring wire
2. Wire dia:0.4-13mm
3 .Standard:DIN17223 GB4357-89
4 .Delivery time:15 days 1*20FCL
5 .MOQ:1 Ton
1. Specification
Material | 45#,60#, 65#, 65Mn, 70#, 72A, 72B, 80#, 82B,SAE1060, SAE1065, SAE1070 |
Dia | 0.3-13.0mm |
Surface | Smooth, phosphated and lead patent heat treatment |
Quality inspection of each coil | Tensile Strength, Tolerance, Surface smooth, Torsion,Bending,Winding, Ellipse , etc. |
Certificate | ISO9001,ISO14001,SGS,Jiangsu Famous Brand , Excellent Quality Metallurgical Products |
Standard | DIN17223/1-1982,GB4357-89 and other standards . |
Application | making springs, steel ropes, cable wires, mattress ,banding wire |
Coil weight | 15KG-200KG per coil or as per your requirement |
Packaging | coils, packed with P.P.cloth or according to customers' request. |
Dilivery time | 15 days for one 20 feet container. |
Loading Capacity | Loading about 20tons in one 20's containe |
Tensile Strength
High Carbon Steel Wire | |||
wire diameter(mm) | Tensile Strength(N/mm² ) | ||
Grade B | Grade C | Grade D | |
0.20 | 2150-2550 | 2400-2790 | 2690-3090 |
0.25 | 2060-2450 | 2300-2700 | 2640-3040 |
0.30 | 2010-2400 | 2300-2700 | 2640-3040 |
0.40 | 1910-2300 | 2250-2650 | 2600-2990 |
0.50 | 1860-2260 | 2200-2600 | 2550-2940 |
0.60 | 1760-2160 | 2110-2550 | 2450-2840 |
0.70 | 1710-2110 | 2060-2450 | 2450-2840 |
0.80 | 1710-2060 | 2010-2400 | 2400-2840 |
1.00 | 1600-2010 | 1960-2300 | 2300-2690 |
1.20 | 1620-1910 | 1910-2250 | 2250-2550 |
1.40 | 1620-1910 | 1860-2110 | 2150-2450 |
1.60 | 1570-1860 | 1810-2160 | 2110-2400 |
1.80 | 1520-1810 | 1760-2110 | 2010-2300 |
2.00 | 1470-1760 | 1710-2010 | 1910-2200 |
2.20 | 1420-1710 | 1660-1960 | 1810-2110 |
3.00 | 1370-1670 | 1570-1860 | 1710-1960 |
4.00 | 1320-1570 | 1520-1760 | 1620-1860 |
5.00 | 1320-1570 | 1470-1710 | 1570-1810 |
6.00 | 1220-1470 | 1420-1660 | 1520-1760 |
7.00 | 1170-1420 | 1370-1570 |
|
8.00 | 1170-1420 | 1370-1570 |
|
9.00 | 1130-1320 | 1320-1520 |
|
10.00 | 1130-1320 | 1320-1520 |
|
11.00 | 1080-1270 | 1270-1470 |
|
12.00 | 1080-1270 | 1270-1470 |
|
13.00 | 1030-1220 | 1220-1420 | |
*Chemical Composition
Steel Grade GB Standard | Carbon % | Silicon % | Manganese % | Phosphorus % | Sulphur % | Chromium % | Nickel % | Cuprum % |
60# | 0.60-0.61 | 0.18-0.22 | 0.52-0.59 | 0.012 | 0.007 | 0.06-0.07 | 0.05 | 0.18 |
65# | 0.65 | 0.21 | 0.56 | 0.013 | 0.008 | 0.05 | 0.04 | 0.14 |
65Mn | 0.60-0.70 | 0.10-0.25 | 0.70-1.00 | 0.030 | 0.030 | 0.20 | 0.20 | 0.25 |
70# | 0.69-0.71 | 0.19-0.21 | 0.53-0.58 | 0.010-0.012 | 0.003-0.006 | 0.01-0.05 | 0.02-0.04 | 0.04 |
72A 72B | 0.72 | 0.19 | 0.71 | 0.013 | 0.006 | 0.02 | 0.02 | 0.03 |
80# | 0.80-0.81 | 0.22-0.24 | 0.59-0.76 | 0.008 | 0.004 | 0.04 |
|
|
82A 82B | 0.82 | 0.24-0.25 | 0.76-0.77 | 0.011-0.014 | 0.004-0.007 | 0.17-0.17 |
| |
2. Packing
Small coil or large coil for the steel wire : Coils, packed with P.P.cloth or according to customers' request
Z2 packing :200-350KF per coil
Iron spool or wood spool for the steel wire
3. Our service
Sample order: we supply you free sample, you pay for the express cost, which can be shipped in 3 days
Our promise: Send you a workable price ;
Delivery in time;
Service you in lifetime for free;
Full refund if substandard goods
- Q: Do you have a natural gas hose in the flue?
- Fastening steel pipe scaffold generally by the steel pipe rods, fasteners, base, scaffolding, safety net and other components of steel pipe: generally there are two, an outer diameter of 48mm, wall thickness 3
- Q: We now have to declare the Department of the Ministry of the United States and the United States, the company said that the access point to our own set, so I would like to ask, what is the requirements of this access point? There is no relevant specification to add: is the construction, the outdoor pipe network in the gas access point position more
- The cost of the main cantilever is as low as the secondary structure can be moved
- Q: Flexible pipe trench backfill inspection batch quality acceptance record how to fill
- Step distance is the bar distance, vertical distance is vertical bar distance. Span ... guess or pole distance.
- Q: What is the difference between a rigid sleeve and a flexible sleeve?
- The usual insulation materials are associated with the insulation, the choice of insulation materials are usually smaller than the heat, that is not due to changes in the external temperature and dramatic changes in thermal performance can be stable as ever, therefore, the current building commonly used Of the insulation materials to heat insulation mortar and thermal insulation performance classes gnawing rescue to find the majority of silent board, in these two aspects of doing better is the dragon EVB series.
- Q: On the classification of car repair, the best details Thank you Such as sheet metal workers, car circuits, etc. Thank you
- first of all, this is a very professional problem, there are many kinds of maintenance shelves, materials are divided into wood, bamboo, steel pipe, etc
- Q: Heating pipe through the deformation of the joints, the album is written on the "metal hose", the problem one: This is a flexible hose? Question 2: how to set the quota
- First, according to its structure can be divided into: scaffolding according to its structure can be divided into: multi-pole, bowl button, door type, square tower, attached lift frame and hanging scaffolding. Second, the knowledge expansion: scaffolding by setting the form can be divided into: single row scaffolding only a row of pole scaffolding, the other side of the horizontal bar on the wall structure. double scaffold scaffolding with two rows of poles. multi-row scaffolding with more than 3 rows of pole scaffolding. full of scaffolding according to the scope of construction work full, both directions have more than 3 rows of pole scaffolding. Full scaffolding The maximum height of the wall or construction work, the scaffolding set by the height of the ground. Scroll (Peripheral) Scaffolding Scaffolding that is set up and intertwined along a building or range of work. Scaffolding Scaffolding with special flat and space shapes, such as for chimneys, water towers, cooling towers and other flat, circular, "outer", polygonal and upper, Form of construction scaffolding.
- Q: The first generation of the tube is that year out?
- In general, there is also a strong ability to resist, it is likely that there may be cracking
- Q: Is the flexible sleeve of the broken wall used as a second retest?
- The national standard is 18kg. Color steel sandwich panel is a common product in the current building materials, do not chu chu dumpling seal festival over the extinguished Long can only be a good flame retardant and environmentally friendly and efficient. Caigang sandwich board has two layers of metal panels and the middle of the polymer core insulation from the suppression. With the installation is simple, light and efficient light and efficient features. And the filling system used to close the molecular structure of the closed, you can put an end to the condensation of water vapor.
- Q: Rigid pipes differ from flexible piping, those are rigid pipes that are flexible piping
- Can be made of polystyrene particles by the pre-die into the steam completely foam self-adhesive after the formation of foam block through the line to form a polystyrene board
- Q: Composite pipe and flexible tube which aspects of the difference
- Lap is in the concrete structure of the component, the length of steel is not enough, according to the requirements of the two steel will be superimposed on each other and the formation of the connection The basic forms of steel connections are: lashing lap, welding, mechanical connection several categories Scaffold (scaffold) refers to the construction site for workers to operate and solve the vertical and horizontal transport and erected various stents General terms of the construction industry, refers to the construction site used in the external walls, interior decoration or high height can not be directly the construction of the place Mainly for the construction workers up and down work or external safety net enclosure and high-altitude installation components, said white is the shelf, scaffolding production materials are: bamboo, wood, steel or synthetic materials Some projects are also used as scaffolds when the template, in addition to the advertising industry, municipal, traffic, road and bridge, mining and other departments are widely used
Send your message to us
high carbon steel wire in good quality
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords