Heavy Duty of Jack Nut for Scaffolding and Formwork System

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1000 pc
Supply Capability:
1000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1.Structure of Jack Nut Description 

Heavy duty light nut of jack nut is an accessories of scaffolding system, which is the most popular used scaffolding system in the world. It will greatly reduce the cost because of the following advantages.


2.Main Features of Jack Nut

 It will greatly reduce the cost because of the following advantages

1)Extremely tight

2)Easy to install

3)It can be used again and again for nearly 20years

 

3.Heavy Nut of Jack Nut product pictures:

   Heavy Duty of Jack Nut for Scaffolding and Formwork System

 4.Heavy Nut of Jack Nut Product Description

Name:

Jack screw nut scaffolding

Size:

32,34,38,40,45,48,60

Surface Treat:

Zink electroplated/paint/original black

Techs:

Casted or drop forged

Material:

Dductile cast iron/Q235 steel

Delivery time:

10-30days

Payment:

T/T or L/C at sight

Packing:

Woven bags

 5.FAQ 

 We have organized several common questions for our clients,may help you sincerely:

1)How many Scaffolding your company have?

Here comes our 5 types of Scaffolding systems:

- Cup lock Scaffolding

- Ring lock Scaffolding

-Kwistage Scaffolding

-H-frame Scaffolding

-ID15 Scaffolding Tower, this type Scaffolding is the most widely used in construction, such like bridge.

2)How long can we receive the product after purchase?

Lead time is about 30days after getting the signed PI and deposit. 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Standard for inspection of portal scaffolding
The 1.2 Standard Specification for steel portal frame and accessories: vertical rod and the transverse diameter: 42.7 + 0.5 mm with an average of 42.9 with a wall thickness of 2.5 + 0.3 mm with an average of 2.45 cross brace: outer diameter of 25 + 0.5 mm with an average of 25.4 with a wall thickness of 2 + 0.3 mm average for 2.3 1.3 door frame and accessories the steel pipe and plate, the welding meets the conditions, allowing the use of the mechanical properties of Q235 steel are made of Q235 steel or better material; when using the tensile strength and yield strength of Q195 steel is low, without affecting the connection and construction conditions, allows for increasing the thickness of the way to make up for the strength the lack of.
Q:Division.. Scaffold method?!?
use a calculator you punk, nobody writes out division anymore, grab your ti-84 and type it out... there's your scaffold method jerk.
Q:What are the functions and requirements of the masonry wall
4, we must attach great importance to a variety of structural measures: scissors, pull nodes, etc. should be set according to requirements.5, the level should be closed: the first step, every step or two, covered with planks or hand foot fence, scaffolding to laying along the long, joints should be overlapped in the small bar, do not appear short board. And in between in the pole and the wall every four steps long laying safety bottom fence.
Q:would a scaffold piercing look gay on a guy?
No i think that would be hott!!! :)
Q:How Long Will My Scaffolding/Industrial Piercing Take To Stop Being Sore?
No, actually, it takes 8-12 MONTHS to heal, by your 8-12 weeks I'm going to guess you went to the mall? Well, first of all, the gun uses blunt force trauma and a dull stud to rip a hole through your ear, plus that 'cleaning solution' is crap and will delay healing. There's a good chance it shattered your cartilage, so you could be in pain for months like I was (2 months of extreme almost constant pain, another 3 of dull aches with extreme pain when ever something brushed it and a final 6 of pain just when something touched it). So, yeah...get ready for the long haul.
Q:Scaffolding steel planks with rubber end caps?
Maybe something like a window washers scafolding planks...?
Q:Can anybody provide me the formula for calculating scaffold volume on circular tank?
Step 1. Measure the diameter of the tank (D). Step 2. Measure the height (h) for a vertical tank or length (l) of a horizontal tank. Step 3. Calculate the cross-sectional area of the tank using Equation 1. Equation 1: Cross-sectional Area, A = 3.14 x D x D/4 Step 4. Calculate the volume of the tank in cubic feet using Equation 2. Equation 2: Volume in cubic feet = A x h [for a vertical tank] Volume in cubic feet = A x l [for a horizontal tank] Step 5. Convert the volume of the tank from cubic feet to gallons using Equation 3. Equation 3: Volume in gallons = (Volume in cubic feet) x 7.48
Q:What are the common rules for calculating the amount of scaffolding works
General rules for the calculation of scaffolding:Masonry works (including building blocks) are higher than 1m when calculated by external scaffolding. Independent column height of less than 3.6m according to the core of the core of the circumference of the height of the calculation of the height of the project; the height of more than 3.6m of the column core circumference plus 3.6m multiplied by the actual height of the project to calculate the amount of masonry.
Q:Please help me in building professional people (scaffolding)
Ordinary scaffolding is a variety of length of steel pipe and direct, cross buckle, three kinds of fastenerClimbing scaffolding is the use of steel or steel beams to do the platform, and above the same as ordinary scaffolding
Q:What Music Video did Garth Brooks Run Around Crazy on Stage, Suspend from The air and Climb the Scaffolding?
it is umm Ain's comin down til the sun comes down

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range