Galvanized Scaffolding Tube 48.3*2.75*6000mm Q235B Steel Standard EN39/BS1139 for Sale CNBM

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
50 m.t.
Supply Capability:
30000 m.t./month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

  • Quick Details of Galvanized Scaffolding Tube 48.3*2.75*6000mm Q235B Steel EN39/BS1139

  • Material :Q235B/Q345B

  • Size : 48.3*2.75*6000mm

  • Surface treatment :Black/Painted/Galvanized

  • Standard:EN39/BS1139

  • Galvanized Scaffolding Tube 48.3*2.75*6000mm Q235B Steel Standard EN39/BS1139 for Sale CNBM

  • Galvanized Scaffolding Tube 48.3*2.75*6000mm Q235B Steel Standard EN39/BS1139 for Sale CNBM


  • Futures of Galvanized Scaffolding Tube 48.3*2.75*6000mm  Q235B Steel EN39/BS1139

  • Galvanized Scaffolding Tubes confirm to BS 1139/BS EN 39 Standard. We have a big factory producing galvanized Scaffolding tubes 25,000 tons each month, and 90% of them are for export. Our scaffolding tubes are widely used in all kinds of construction site such as oil and gas industry, refinery industry and infrastructure in over 20 countries.

  •     We have a wide range of round scaffolding tubes. If you require a specific size, such as different thickness or different length, please send us your detail requirements. Our quotation will always base on your requirements.

  •     Hot Dipped Galvanized Scaffolding tubes are also known as scaffolding pipes, scaffolding poles, and galvanized steel tubes, round galvanized tubes.

  •  

  • Size: 48.3 X 2.5 X 6000mm
    Zinc Thickness: 40 micron
    Surface: hot Dipped Galvanized 
    Water Proof: according to customer requirements.
     


  • FAQ

  • 1. What is considerations of Scaffolding installation?

  • There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

  • (1) scaffold frontage hurtful to prevent falling objects protection is required.

  • (2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

  • 2.What are the certifications of your products?

  • Certified by SGS, BS1139, EN74, Local Test Report.

  • 3. How long is the warranty period for your product?

  • Our products warranty is 2 years.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Specification and type of scaffold erection
Specification for scaffold erection(a) basic requirements1 important scaffolding must develop a construction plan, if necessary, to develop safety assurance measures. 2 more than 25m high scaffolding must adopt the fastener type steel tube scaffold, the single pole scaffolding height should be controlled within 50m; height of more than 50m of the scaffolding should be effective measures by a double pole, wire rope, cable stayed unloading segment, and additional design.3 the design of the scaffold shall meet the requirements of the project and shall indicate its use, maximum static load, maximum dynamic load andThe selected design parameters and structural parts shall not be lower than the existing national and industry related safety technical standards.4 scaffolding in the construction of the need to change the original structure, Gago (wide), to its use, etc., must be verified by the technical department, and the approval.
Q:looking for a scaffolding job in dubai can anyone help?
Hi okorder.com, we are Dubai based scaffolding contractor.
Q:Are there any biological examples of scaffolding in evolution?
The classic demonstration was in the E. coli long term experiment. A strain gained the ability to metabolize citric acid after 31,500 generations. Culturing preserved strains from 15,000 and 20,000 generations showed that there was an event that occurred in between that enabled the later conversion to citrate metabolism.
Q:The outer hanging scaffold board 12 embedded parts embedded in the crack?
Cantilevered scaffold generally has two kinds: one kind is each layer of a pick, the vertical rod at the bottom of the top in the construction site, floor beam or wall, outward tilt after fixed on the upper part of the erection of scaffolding construction, rail laying layer, construction of a story, to be transferred to the upper layer, and then re ride scaffold provides a layer of construction; the other is the multilayer cantilever scaffold, the full height is divided into several sections, each section of the erection of a height of not more than 20m, the use of cantilever beam or cantilever frame for scaffold based subsection overhanging scaffolding section, this method can use scaffolding over 50m the overhanging scaffolding facade to be set up scissors.
Q:Mobile scaffolding accessories prices
The cross rod is also called the diagonal pull rod, and is a cross connecting rod which is vertically connected with the two door frames. The part of both ends of the rod part is punched with a pin hole, and the locking pin on the vertical rod of the door and the frame is locked when assembling.
Q:What could you do with 100,000 jumbo cotton balls, 50 gallons of honey, and three story scaffolding?
Take them on the road-trip of course....we'll find some use for them along the way.....
Q:Bowl buckle scaffold inspection and evaluation
Bowl buckle scaffold should be checked and accepted as follows:(1) access to the site of the bowl buckle frame fittings shall have the following information:
Q:male scaffolders only if i was swinging on the scaffold would ya stomp on my fingers with ya workboots on?
depends how many times have i told you to get off?
Q:Is it dangerous to get a scaffold piercing?
Getting piercings is not that dangerous except that a lot of normal people will think that you are a weirdo
Q:Seeking for the safe construction scheme of mobile scaffolding!
Double pole scaffolding and scaffold for decoration of the vertical distance rod step distance should be less than or equal to 2.0m. peaceFrom the operation layer (floor) scaffold surface height is over 2.0m, the width of working layer deck should not be less than: scaffold for 750mm in scaffolding for the clearance of 500mm. edge of the plank and wall should be more than 300 mm, and blocking foot clearance should be more than 100mm. when the side board is not close to the pole, should with reliable fixation.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range