Formwork Steel Props Scaffolding Parts New Design

Ref Price:
Loading Port:
Payment Terms:
Min Order Qty:
9 m.t
Supply Capability:
1000 m.t/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

New Design Formwork Steel Props Scaffolding System Formwork System Formwork Parts

Product pictures:

Formwork Steel Props Scaffolding  Parts New Design

Formwork Steel Props Scaffolding  Parts New Design

Formwork Steel Props Scaffolding  Parts New Design

Product description:


RingLock Scaffold System


Scaffolding System


Steel (Q235/Q345)


D48*3.25mm, etc


Electro Galvanized, Hot   Dipped Galvanized, Painted, Powder Coated


Standard, Ledger, Diagonal   Brace, Bracket, Base Jack, U Head Jack, Etc.


Slab Support, Staircase,   Stage Plateforms, Bridge Support, Mobile Tower, etc.


OEM is Available

Items or goods can be   manufactured according to your standards.


* Customized solution helps you work safe, save cost and convenient

* Excellent quality for formwork & scaffolding with wide choices

Other scaffolding & formwork products:

(1)   Scaffolding System

Including Ringlock Scaffolding System and accessories; Cuplock Scaffolding System and accessories; Haki Scaffolding System and accessories;

(2)   Scaffolding Frame & Accessories

Including Walk Through Frame Scaffolding;Accessories; we also can make scaffolding according to your samples or drawings.

(3)   Scaffolding Couplers/Clamps

We can produce all kinds of forged and pressed couplers, including British type couplers. We also can produce according to your drawings or samples.

(4)   Formwork System Scaffolding & Accessories

Light Duty Shoring prop and Heavy Duty Shoring Prop; Wing nuts and Tie rods; RASTO clamp and so on.


Why choose Us?

We are one of the largest construction materials suppliers in China.

We own professional manufacturers with powerful producing capacity.

Extensive and comprehensive quality control system

Other questions:

Q: Samples?

    Sample free, customer pay freight first time.

Q: Delivery?

    10-30days according to the order qty.

Q: Payment?

T/T L/C at sight

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:I am looking to buy storage tank building tools like bull pins, u-bars,keyplates,and scaffold someone HELP?
Check with Home Depot or Lowes. you can usually find what you need there.
Q:I would like to know what the scope of responsibility for the construction engineering supervision is specific
The scope of project supervision responsibility should mainly cover two aspects: one must involve the project itself, the site management is different from the project management, the former is the contractor's responsibility, the latter is the responsibility of the supervision interval, and the project itself has nothing to do with the responsibility of the accident , If the accountability of enterprises or supervisors is not based on the responsibility Such as temporary construction, temporary electricity, erection of scaffolding, loading and unloading of various building materials, on-site transport equipment, etc, does not constitute the project itself, so even if the accident occurred, should not be held accountable or supervisory staff responsibility Second, it must involve the quality of the project, because the owner is the first person responsible for the quality of the project, the project supervision enterprises as a social intermediary service organization, its power, responsibility and obligation is derived by the owner commissioned by any supervision business can not exceed the owner commissioned Responsibilities and new powers and obligations Therefore, the supervision of enterprises not only to bear the corresponding responsibility for the quality of the accident, but also due to the quality of the accident caused by accidents, including accidents, including other accidents
Q:I would like to inquire cup lock system scaffolding, how much time per square meter and manpower to do the job?
It depend upon availability sorting of ledger to be used.If prop ledger has been transported sorted then three person can do 10 sqm in maximum 3/4 hour .i.e.0.075 h/sqm
Q:Seeking construction machinery safety supervision papers can be greater than 100 words
Summary: With the national construction laws and regulations, the introduction of local laws and regulations, the construction of administrative departments in charge of supervision and supervision of the implementation of the project construction quality has improved significantly, but not with the Adapted to the safety management of the construction process has not been able to work with the quality of construction work to improve, vicious security incidents frequently
Q:A window washer drops a brush from a scaffold on a tall office building. What is the speed of the falling brush?
Use, Vf = Vo + g * t With Vo = 0 , Vf = g * t = 9.8 m/s^2 * 3.39 s = 33.222 m/s. part B, use the same equation, but take into consideration to watch for direction and adopt a convention. As before we have considered +ve for downward direction. Now Vf = 0 0 = Vo + g * t. Vo = - 9.8 m/s^2 * 2 s = -19.6 m/s . Negative means upward direction according to the adopted convention.
Q:Seeking the Responsibility System of Safety Responsibility of Each Function Department
System, and to monitor the implementation of the situation
Q:Two window washers, Bob and Joe, are on a 3.00 m long, 380 N scaffold supported by two cables attached to its?
Oh, Ashley, you can't fit more than an intro in the what would you like to ask. More room in details.
Q:In the housing budget in what circumstances calculate the dependent chute and independent ramps? Thank you
Dependent chute and independent chute are calculated by seat, the height of the same with the height of the outer scaffolding
Q:How long do you have to wait before you can take a scaffolding piercing out for short periods of time?
They take 9-12 months to heal and an unhealed piercing should never be removed. Yes, you would experience issues. It would likely close or shrink in size or if it somehow didn't then you could easily cause infection, irritation, prolonged healing, hypertrophic scarring...nothing you should be willing to risk. 6 weeks is far from being long enough.
Q:Construction technology measures fee is directly into the sub - project costs
Construction technology measures fee is not directly into the sub-project costs, because the construction technology measures fees are measures fees rather than sub-project costs, measures fees, refers to the completion of the project construction, occurred in the construction and construction The cost of non-engineering entity projects during the process consists of construction technical measures and construction organization measures

1. Manufacturer Overview

Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range