• Forged Board Retaining Coupler  for Scaffolding Q235 Standard EN74 /BS1139 CNBM System 1
  • Forged Board Retaining Coupler  for Scaffolding Q235 Standard EN74 /BS1139 CNBM System 2
  • Forged Board Retaining Coupler  for Scaffolding Q235 Standard EN74 /BS1139 CNBM System 3
Forged Board Retaining Coupler  for Scaffolding Q235 Standard EN74 /BS1139 CNBM

Forged Board Retaining Coupler for Scaffolding Q235 Standard EN74 /BS1139 CNBM

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
5000 pc
Supply Capability:
30000000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

  • Quick Details of  Forged Board Retaining Coupler for Scaffolding 

  • Material :Q235

  • Production Standard :BS1139 EN74

  • Applications :Construction

  • Package :In bag and pallet

  • Forged Board Retaining Coupler  for Scaffolding Q235 Standard EN74 /BS1139 CNBM

  • Forged Board Retaining Coupler  for Scaffolding Q235 Standard EN74 /BS1139 CNBM

  • Forged Board Retaining Coupler  for Scaffolding Q235 Standard EN74 /BS1139 CNBM

Futures of Forged Board Retaining Coupler for Scaffolding 

1.Material:Q235 carbon steel

2.Diameter:48.6mm x 48.6mm

3.Finish:Hot dip galvanized,Electro plated.Powder coated,Painted

4.Weight:0.98kg

5.Standard:JIS

6.Supply ability:25 containers / month

7.Minimum order:One container

8.Payment:L/C,T/T,30% in advance

9.Shipment:FOB,CIF,C&F

10.Port:Nanjing/Shanghai port

11.Advantages: High quanlity,Competitive price,Fast delivery,Safe package ,Best service and OEM service



  • FAQ

  • 1. What is considerations of Scaffolding installation?

  • There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

  • (1) scaffold frontage hurtful to prevent falling objects protection is required.

  • (2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

  • 2.What are the certifications of your products?

  • Certified by SGS, BS1139, EN74, Local Test Report.

  • 3. How long is the warranty period for your product?

  • Our products warranty is 2 years.

Q: HELP me out please. im struggling with this book
I dont think she explained the rose bush very well. i think that it refers to Good and bad. Good being the rose and bad being the thorns Hester said in the book that she picked Pearl off a rose bush. Hester loves pearl but also fears her
Q: Room 29 meters outside the wall of the two rows of steel pipe scaffolding installation, demolition, joint protection measures in Wuhan, the price per square is how much money? A friend to help refer to Kazakhstan
Homework is two, while the long rod is 273m; small bar is 51; rectangular fastener 187; butt fastener 55; rotating fastener 17; a 7 foot board 14 square meters. You can use this to derive the amount per square meter. (average length of 5 meters).
Q: What are the requirements for the sampling inspection of scaffolding?
Quality specification for the cantilever support1 the material of the suspension bearing frame should have the certificate of quality and quality inspection report;2 the height and length of the weld shall meet the design requirements, and shall not have any defects such as welding cracks, structural deformation, corrosion and so on;3 the production quality of the suspension frame shall be in conformity with the provisions of appendix D table D.1.
Q: For indoor use of mobile scaffolding safety construction plan! Four support points with four pulleys with brake!The construction scheme of scaffolding safety belt for indoor high Jiqiu braking pulley, for about 12 meters of buildings, indoor emergency please heroes!
Double pole scaffolding and scaffold for decoration of the vertical distance rod step distance should be less than or equal to 2.0m. peaceFrom the operation layer (floor) scaffold surface height is over 2.0m, the width of working layer deck should not be less than: scaffold for 750mm in scaffolding for the clearance of 500mm. edge of the plank and wall should be more than 300 mm, and blocking foot clearance should be more than 100mm. when the side board is not close to the pole, should with reliable fixation.
Q: What are the requirements for acceptance of external scaffolding? Want to know before
Hello, this has the following specifications: safety 1, set up a high level scaffolding, the various materials used must meet the quality requirements. 2, the foundation must be firm, before the erection of the calculation, to meet the load requirements, and according to the construction code set up, do drainage measures. 3, scaffolding erection technical requirements shall comply with the relevant provisions of the code
Q: From the Scarlet Letter, Ch. 10-12
Haven't read this book in years but I believe he goes back to the scaffold at night because he is being eaten away by guilt. It is a type of redemptive action, just as Hester had to stand there and be judged for her sins he feels the need to also stand there on the scaffold with Hester (theoretically) and be judged/punished as well, the only difference, of course, is that he does it under the cloak of night, when no one can see him.
Q: I have some scaffolding that I would like to use to build a temporary slide to my swimming pool. The slide I would like to be made out of the side parts which are the ones like rectangles with bars going across them and I have a variety of poles. I would then like to put a slippery tarpaulin on to the frame.But how would I hold the tarpaulin up, because the metal poles will be too short? So that if someone slid down it they would not just burst through the tarpaulin and hit the floor after hitting around five metal poles!
Why would you even consider something like that? Obviously you kids and your family use this pool, why put them at risk making a temporary slide with scaffolding. Not a good idea.
Q: how did they turn the cells into a polymer for the heart scaffold ?
May have misunderstood. The heart is gently stripped of cells by using a detergent - this leaves the extracelllular matrix - a polymer of collagen - inert and insoluble. New cells (stem cells) will then be added to the structure to repopulate it with living heart muscle which gain coordination and structure from the matrix.
Q: What are the requirements for the construction of the scaffolding structure?
The invention also provides an anchoring device for anchoring a scaffold structure to a building. Arm with longitudinal axis. The anchoring device further comprises an anchoring device which is fixed to the building by the anchoring device and the scaffold structure.
Q: hi, ive had my scaffolding for a little over a month now, and one of the holes has started going really weird. on the top, its swollen and sore on one side, and on the bottom, its the same but on the opposite side. not sure if its infected ir being rejected by ear, which ive heard can happen. i would like to keep it in if possible,as i love it. any help welcomed :) thanks xx
I've also had my scaffolding and I had the same issue. It was totally normal, I went back to the peircing place and asked if this was regular for the piercing. They said it was and to proceed with the cleaning process etc. they said it just has scabs because its healing :)

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords