Forged Board Retaining Coupler for Scaffolding Q235 Standard EN74 /BS1139 CNBM

Ref Price:
Loading Port:
Payment Terms:
Min Order Qty:
5000 pc
Supply Capability:
30000000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

  • Quick Details of  Forged Board Retaining Coupler for Scaffolding 

  • Material :Q235

  • Production Standard :BS1139 EN74

  • Applications :Construction

  • Package :In bag and pallet

  • Forged Board Retaining Coupler  for Scaffolding Q235 Standard EN74 /BS1139 CNBM

  • Forged Board Retaining Coupler  for Scaffolding Q235 Standard EN74 /BS1139 CNBM

  • Forged Board Retaining Coupler  for Scaffolding Q235 Standard EN74 /BS1139 CNBM

Futures of Forged Board Retaining Coupler for Scaffolding 

1.Material:Q235 carbon steel

2.Diameter:48.6mm x 48.6mm

3.Finish:Hot dip galvanized,Electro plated.Powder coated,Painted



6.Supply ability:25 containers / month

7.Minimum order:One container

8.Payment:L/C,T/T,30% in advance


10.Port:Nanjing/Shanghai port

11.Advantages: High quanlity,Competitive price,Fast delivery,Safe package ,Best service and OEM service

  • FAQ

  • 1. What is considerations of Scaffolding installation?

  • There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

  • (1) scaffold frontage hurtful to prevent falling objects protection is required.

  • (2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

  • 2.What are the certifications of your products?

  • Certified by SGS, BS1139, EN74, Local Test Report.

  • 3. How long is the warranty period for your product?

  • Our products warranty is 2 years.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:I need to be guided to supplier of Aluminum Scaffolding?
Please Type ‘Aluminum Scaffolding+supplier+your location’ into its ‘Search’ panel, and click on ‘Enter’. Several pages of site listings giving details and links of suppliers who offer Aluminum Scaffoldings in, or near, your locality will be presented to you. Contact them, one by one, and then choose the supplier who suits your specific needs best. Happy hunting !
Q:looking for a scaffolding job in dubai can anyone help?
Hi, we are Dubai based scaffolding contractor.
Q:As Hester once did, what time of day did Dimmesdale attend the Scaffold, and what compels his action?
Haven't read this book in years but I believe he goes back to the scaffold at night because he is being eaten away by guilt. It is a type of redemptive action, just as Hester had to stand there and be judged for her sins he feels the need to also stand there on the scaffold with Hester (theoretically) and be judged/punished as well, the only difference, of course, is that he does it under the cloak of night, when no one can see him.
Q:would a scaffold piercing look gay on a guy?
No i think that would be hott!!! :)
Q:Scaffolding installation process, construction preparation
Construction preparation(1): steel pipe should be consistent with current national standard "carbon structural steel" (GB/T700) regulations Q235- grade steel; new steel pipe should be the product quality certificate; steel surface should be flat and smooth, no cracks, scarring, delamination, dislocation, bend, burr, indentation and scratch depth, pipe diameter deviation not more than -0.5mm, the wall thickness deviation not greater than -0.5mm, cutting slope deviation not greater than 1.7mm, the steel surface should be brushed with antirust paint; old steel corrosion depth not greater than 0.5mm, more than the prescribed steel shall not be used.(2): buckle made of malleable iron fasteners, the material should be consistent with current national standard "steel pipe scaffolding fasteners" (GB15831) regulations; old buckle inspect before use, shall not have cracks, deformation, bolt appear smooth silk must be replaced; new and old fastener must brush good antirust paint.(3) foot board: the use of 4m long wooden foot board; foot width of not less than 200mm, the thickness is not less than 50mm, both ends should be set with a diameter of 4mm galvanized steel hoop two; rotten feet can not be used.(4) safety net, paint.(5) after the inspection and acceptance of the above parts have been classified and piled up in a neat and orderly manner, no water can be accumulated.2, scaffolding erection and removal(1) scaffold erection
Q:Industrial/Scaffolding piercing swollen and sore?
The soreness and swelling is normal. Try to really be careful about not knocking it. You're only going to get a keloid if you are prone to them, if you've never had a keloid you likely won't get it. It's hypertrophic scarring that is pretty common with industrial piercings which is why taking care of the piercing is really well. If you're using regular salt then that is a problem - it needs to be non-iodized sea salt. Soak the piercing twice a day for 5-10 minutes each soak with a mixture of 1/4th of a teaspoon of the sea salt to 8oz of hot water. Make sure you're not moving the bar around at all. Take ibuprofen and ice it for the swelling.
Q:How to solve the problem of scaffold pipe repair
Easy to move, straightening, derusting, ash removal, painting can be completed on the same machine at the same time, labor saving, labor-saving, easy to operate, can be adjusted 48mm Phi - Phi 51mm of all types of steel pipe
Q:Can you believe a man survived a 60 foot fall from a scaffold?
Yes I can. Did you hear about that drunk guy who survived a 17 story hotel fall. I think he ended up having a broken foot.
Q:29 meters outside the walls of the house of the two rows of steel pipe scaffolding installation, demolition
When the double row scaffolding longitudinal distance 1.5m, horizontal distance 1.2m, step 1.8m, as per 100 square meters of double row scaffolding rod parts
Q:Which accessories are included in a movable scaffold
(1) single specification steel pipe scaffold. It only uses a steel pipe specifications, such as steel tubular scaffolding, welded steel pipe using only 48 * 3.5.(2) scaffold with various specifications of steel pipe. The utility model is composed of two or more steel pipes of different specifications, such as a door type scaffold.(3) steel scaffolding. As to the steel pipe, and combined with other type of steel pieces composed of scaffolding, such as the channel has a base in the backwater or scaffolding, connecting steel scaffolding and so on.

1. Manufacturer Overview

Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range