Electro Galvanized Solid U-Head Jack M32x600mm/150x120x50x5mm CNBM
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 5000 pc
- Supply Capability:
- 30000000 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Description of Electro Galvanized Solid U-Head Jack M32x600mm/150x120x50x5mm
Material :Q235
Size :M30, M32, M34, M36, M38, M48
Surface treatment :Painted, Electro Galvanized, Powder Painted, HDG
Painted Solid Base Jack M30x400MM/120x120x4mm Futures:
We offer the following base jack for scaffolding:
What are the advantages of your products?
Experience: over ten years in scaffolding manufacturing.
Quality: Certified by SGS, BS1139, EN74, Local Test Report.
Price: Moderate, Reasonable.
Service: Friendly and Responsible. OEM service is available.
- Q: looking for a scaffolding job in dubai can anyone help?
- Hi okorder , we are Dubai based scaffolding contractor.
- Q: The role of the external scaffolding and the relevant provisions?
- Scaffolding outside the building in the construction of the building is an indispensable important tool for erection. Its role: first, can make the construction personnel in different parts of the operation of the high; two is to ensure the safety of construction personnel in the high altitude operation
- Q: What are the full house scaffolding specification
- 7 "technical code for safety of wooden scaffolding in construction" (JGJ164-2008)8 "safety management of construction enterprises" (GB50656-2011)9 "construction safety of the bowl buckle scaffold technical specification" (JGJ166-2008)
- Q: If you have two workers say standing on a scaffolding, their are downward forces from the weight of the workers along with the weight of the scaffold, and upward forces from tension suspending the scaffolding in place. The opposite forces add to zero and thus the scaffolding remains at rest.My question has to do with what would occur if more/less workers were on the scaffolding. It appears to me that the scaffolding would always remain at rest. Would there always be a ΣF=0 regardless of the amount of workers? As the decreases in weight from removing a worker would also cause the tension force to be weaker? And vice versa if there were more workers?I
- You are correct so long as the scaffolding is not allowed to move. I.e. the cables suspending it are locked and not unwinding from their spools as more workers get on. More weight added would necessarily increase the tension in this type of case. However, if, when another worker got on and the tension could not increase for what ever reason, a downward acceleration would take place that is proportional to the worker's weight. Hope that clears things up.
- Q: Scaffolding installation process, construction preparation
- Construction preparation(1): steel pipe should be consistent with current national standard "carbon structural steel" (GB/T700) regulations Q235- grade steel; new steel pipe should be the product quality certificate; steel surface should be flat and smooth, no cracks, scarring, delamination, dislocation, bend, burr, indentation and scratch depth, pipe diameter deviation not more than -0.5mm, the wall thickness deviation not greater than -0.5mm, cutting slope deviation not greater than 1.7mm, the steel surface should be brushed with antirust paint; old steel corrosion depth not greater than 0.5mm, more than the prescribed steel shall not be used.(2): buckle made of malleable iron fasteners, the material should be consistent with current national standard "steel pipe scaffolding fasteners" (GB15831) regulations; old buckle inspect before use, shall not have cracks, deformation, bolt appear smooth silk must be replaced; new and old fastener must brush good antirust paint.(3) foot board: the use of 4m long wooden foot board; foot width of not less than 200mm, the thickness is not less than 50mm, both ends should be set with a diameter of 4mm galvanized steel hoop two; rotten feet can not be used.(4) safety net, paint.(5) after the inspection and acceptance of the above parts have been classified and piled up in a neat and orderly manner, no water can be accumulated.2, scaffolding erection and removal(1) scaffold erection
- Q: I'm a civil engineering student and we were asked to submit a paper about designing a simple scaffolding. I just want to see a sample paper so that I would know what details should I include.
- can't draw here, but it's just an x with a flat board on top in 3 dimensions.
- Q: Construction scaffolding right angle fastener, rotary fastener, butt fastener weight? There are more than one meter steel pipe?Thank you!!!
- High efficiency of the installation and removal of only bare handed, greatly improve the efficiency of mobile scaffolding assembly and disassembly than the steel pipe frame 1/2 fast time, faster than bamboo scaffolding 2/3 time. Safe and reliable 1 overall performance is good: equipped with a foot board, parallel frame, buckle wall tube, horizontal and cross bar...
- Q: Any advise on nerves? I have 11 piercings but I'm still terrified of needles! Any tips on keeping my cool?
- You should keep your breathing calm so you don't freak out, haha. If you're very terrified of needles, have one of your friends hold your hand while doing it and talk to them while doing this to keep your mind off of the piercing. It should be done very quickly though, so don't work yourself up too much :)
- Q: The construction scheme of high rise and external cantilever scaffold!
- (2): Fastener fastener should comply with the "steel pipe scaffolding fasteners" (GB15831 1995). The provisions of fastener can't crack, porosity, trachoma and other casting defects. Surface fastener and steel tube to contact good fastener clamping steel pipe, the minimum distance of the opening should be less than 5mm.(3) the foot board; steel foot plate generally with thick 2mm steel plate, and the table has a uniform distribution of anti slip hole, board length 2~4m, width 250mm of fir or pine, board length 3~6m, width not less than 150mm.
- Q: I know people have different pain thresholds. But I was wondering if it was more painful than a lobe piercing? It will be done with a needle and are they aloud to freeze it? Or is it not needed?
- Scaffold/Industrial piercings definately hurt more than a regular lobe piercings because it's in the cartilage area and its pierced at a larger gauge but the pain is bareable. On a scale of 1 to 10 (10 being the worst pain) I would say an Industrial would be anywhere from a 4-6 depending on your pain threshold. Freezing it probably wouldn't be nessesssary. I got a 14g Industrial pierced on one ear and a 16g helix on the other both on the same day (the industrial was done first) and in my opinion the 16g helix hurt more. So it really depends on how well you tolerate pain
Send your message to us
Electro Galvanized Solid U-Head Jack M32x600mm/150x120x50x5mm CNBM
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 5000 pc
- Supply Capability:
- 30000000 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords