Elbow for PUTZMEISTER Pump No.1 with OPEN HOLE with high quanlity
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 pc
- Supply Capability:
- 10000 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Elbow PUTZMEISTER No.1 with OPEN HOLE with high quanlity
1.We are a factory which producing concrete pump parts and we have done many years in the factory with rich experience, the main products include concrete pump pipe, concrete pump elbow, concrete pump reducer pipe, concrete pump flange, piston, rubber hose, sponge cleaning ball, wear plate, cutting ring etc.
2.Our products are Top quality in china which can be used on SCHWING,PM,KYOKUTO,SANY,ZOOMLION
and have been recognized by them.
3.Quality certification of ISO 9001:2000. OEM service available.
Specification of pipe elbow:
1>Material:ST52,20#steel,45Mn2 or as per to your requirements
2>Types:our concrete elbows mainly include single wall elbows, double layer(twin walls) elbows,wear-resisting elbows, advanced technology, work life long.
3>A wide range of specifications for you.
Concrete Pump Pipe Elbow | |||||||
Type | Singe Elbow | Double Elbow | |||||
Model | DN125 | DN150 | DN175 | DN125 | |||
Material | Casting Steel ,ST52,20# steel,45Mn2 | Inside | 40Cr | Outside | |||
Size | R275*90° | R275*90°+110 | 36° | F2000 | R275*90° | R275*90+110 | |
R275*45° | R275*90°+211 | R400*30° | A3000 | R275*45° | R275*90+211 | ||
R275*25° | R275*90°+411 | R400*45° | 471B | R275*25° | R275*90+411 | ||
R275*20° | R275*90°+424 | R400*30° | 571B | R275*20° | R275*90+424 | ||
R275*15° | R275*45°+170 | R488*90° | A1000 | R275*15° | R275*45+170 | ||
R180*90° | R275*45°+310 | R500*90 | C1000 | R180*90° | R275*45+310 | ||
R232*60° | R275*45°+310 | R280*90° | B2000 | R232*60° | R275*45+310 | ||
R240*36° | 20°Lengthen | R240*36° | 20°Lengthen | ||||
R240*30° | 25°+740 | R240*30° | 25°+740 | ||||
R240*15° | 40°Zoomlion | R240*15° | 40°Zoomlion | ||||
R385*29° | R385*29° | ||||||
R315*33° | R315*33° | ||||||
Technic | Forged,Casting | ||||||
Average life | 25,000cubic | 50,000cubic | |||||
Appliciation | Used in concrete transport in construction work. |
- Q:What is the working principle and structure of a concrete pump truck?
- Pumping device for the piston concrete pump, the use of hydraulic cylinder to drive the concrete cylinder piston for reciprocating motion, with the hopper, distribution valve with the completion of inhalation and removal of concrete, in order to achieve the purpose of transport.
- Q:What is the lubrication of the concrete pump before it is transported to the concrete?
- the second use of concrete with the same name to the mortar mortar lubrication.
- Q:Why does the concrete pump main cylinder check valve damage cause the cylinder stroke to be short and the pumping is weak?
- When the cylinder of the cylinder is pushed forward, it must be replenished to the retraction cylinder by means of a rod-side check valve that extends out of the cylinder to ensure that the retraction cylinder can retract to the bottom because when the piston is run to "U
- Q:What is the difference between the concrete pump and the concrete pump?
- The use of pressure to transport the concrete along the pipeline. By the pump and the composition of the pipeline. According to the structure is divided into piston type,
- Q:What are the precautions for the operation of the concrete pump truck?
- After pumping the water, use one of the following methods to lubricate the above parts: Pumping the slurry; pumping 1: 2 cement mortar; pumping the other ingredients in addition to the coarse aggregate and the ratio of the cement mortar.
- Q:90KW concrete pump should be used in the number of generators?
- To normal long running 90KW concrete pump, 150KW generator is not enough, because the device to start the current
- Q:What is the pressure of a support leg when the concrete pump is operating?
- Of course, different models, the brand of the specific parameters of the pump is not the same
- Q:What are the requirements for the selection of concrete pump tubing and the setting of the bracket?
- 1 concrete pump pipe should be based on the pump model, the performance of the mixture, the total output, the unit output, transport distance and coarse aggregate size to choose;
- Q:How is the mortar in concrete pumping concrete coexisting and distinguishing in a pump?
- Concrete mixing truck, the first charge, should be more two bags of cement.
- Q:How much concrete pump power
- Combining ready-mix concrete production with pump construction, the use of concrete mixing truck for intermediate operation, can achieve continuous pumping and pouring concrete.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Elbow for PUTZMEISTER Pump No.1 with OPEN HOLE with high quanlity
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 pc
- Supply Capability:
- 10000 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Related keywords