Customers Concern for Using Swivel Scaffolding Swivel Couplers with Hot Galvanized
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 15000 pc
- Supply Capability:
- 300000 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Customers Concern for Using Swivel Scaffolding Swivel Couplers
1. Quick Details:
Place of Origin:Hebei China
Model Number: GTJ-002
Type: Scaffolding Parts
Material: Q235
Weight: 0.58kg to 0.65kg
Surface Treament: as your requirements
2.Packaging & Delivery:
Packaging Detail: CARTONS THEN ON PALLET,OR AS YOUR REQUEST.
Delivery Detail: WITH IN 25 DAYS
3.Product Information
Product Name | Japanese Type Swivel Scaffolding Couplers |
Type | GTJ-S002 |
Material | Q235 |
Thickness | 2.5mm or 3mm |
Weight | 0.58kg or 0.65kg |
Surface Treatment | Electroplate Galvanized |
Products’ standard | Fit for JISA8951 |
Dimensions | 48.6 x 48.6mm |
MOQ | 10000PCS |
Product feature | anti-rust, skid proof, high breaking strength |
4.Pictures:
FAQ--Why choose us?
Exemplary Service
On-Time Delivery
Wide Product Range
Competitive Pricing
Huge branch network capable of catering worldwide
We have established the international advanced quality management system,every link from raw material to final product we have strict quality test;We resolutely put an end to unqualified products flowing into the market. At the same time, we will provide necessary follow-up service assurance.
What promises can be done by us?
If interested in scaffolding couplers, please feel free to write us for any QUOTE.
If printing required, please advise asap because the whole set need much more time to complete.
Please DO check goods when courier knocks your door and contact us asap if any issue.
- Q:Find the demolishing scheme of scaffold
- Removal of scaffolding shall comply with the following requirements:11.2.1 removal operations must be carried out from top to bottom, prohibited from top to bottom operation at the same time;11.2.2 even wall pieces must be removed with the scaffolding layer by layer, is strictly prohibited even after the first wall or a few layers of the demolition of the dismantling of scaffolding; demolition of the height difference should not be greater than 2 steps, such as the height difference is greater than the 2 step, should be added to strengthen the wall;
- Q:What is rolling scaffolding?
- Scaffold (pipe staging) that has wheels in the legs. Any metal scaffolding that you've seen can be fitted with wheels to make it mobile.
- Q:i have an interview tomorrow but have a scafold piercing in , its been in there for about 2/3 months nearly healed competely , how ling can i leave it out for , maybe 30-45 minutes? thanks
- They take around 6-9 months to heal completely...you shouldn't be taking it out at all. I stupidly took mine out after 3 months to clean a bit behind the bar and the bar would never go back through the top hole. It hurt like crap and bled profusely if I tried to push it through.
- Q:Scaffolding installation process, construction preparation
- Construction preparation(1): steel pipe should be consistent with current national standard "carbon structural steel" (GB/T700) regulations Q235- grade steel; new steel pipe should be the product quality certificate; steel surface should be flat and smooth, no cracks, scarring, delamination, dislocation, bend, burr, indentation and scratch depth, pipe diameter deviation not more than -0.5mm, the wall thickness deviation not greater than -0.5mm, cutting slope deviation not greater than 1.7mm, the steel surface should be brushed with antirust paint; old steel corrosion depth not greater than 0.5mm, more than the prescribed steel shall not be used.(2): buckle made of malleable iron fasteners, the material should be consistent with current national standard "steel pipe scaffolding fasteners" (GB15831) regulations; old buckle inspect before use, shall not have cracks, deformation, bolt appear smooth silk must be replaced; new and old fastener must brush good antirust paint.(3) foot board: the use of 4m long wooden foot board; foot width of not less than 200mm, the thickness is not less than 50mm, both ends should be set with a diameter of 4mm galvanized steel hoop two; rotten feet can not be used.(4) safety net, paint.(5) after the inspection and acceptance of the above parts have been classified and piled up in a neat and orderly manner, no water can be accumulated.2, scaffolding erection and removal(1) scaffold erection
- Q:The scaffold weighs 204 N and is 3.10 m long. What is the force each rope exerts on the scaffold when the 665 N worker stands 1.00 m from one end of the scaffold? N (smaller force) N (larger force)
- Sum moments left side...(assume worker 1m from left) Right rope = 316.516 Sum vertical.... Left rope = 552.484
- Q:I have some scaffolding that I would like to use to build a temporary slide to my swimming pool. The slide I would like to be made out of the side parts which are the ones like rectangles with bars going across them and I have a variety of poles. I would then like to put a slippery tarpaulin on to the frame.But how would I hold the tarpaulin up, because the metal poles will be too short? So that if someone slid down it they would not just burst through the tarpaulin and hit the floor after hitting around five metal poles!
- Why would you even consider something like that? Obviously you kids and your family use this pool, why put them at risk making a temporary slide with scaffolding. Not a good idea.
- Q:I plan to have a scaffolding or industrial piercing soon, but don't know where to go.Any suggestions and could you include the prices?x
- Cost depends on the studio. It ranges from 20 to 45 pounds for each piercing, most common price is 25 pounds for each piercing, high quality titanium or stainless steel jewelry included. The industrial is 2 piercings in one so : 25 + 25 = 50 pounds, jewelry included.
- Q:Latch type disc scaffolding accessories are national patent products?
- The utility model is mainly used for a light frame and a background frame of a large-scale concert Pankou, type multifunctional scaffold, the scaffold socket diameter of 133mm and thickness of 10mm disc, 8 hole disc, adopting 48*3.2mm, Q345A pipe master component, the vertical rod is in the pipe length of every 0.60m welding on a disc, rail connection using this novel and beautiful disk. The bottom with the connecting sleeve. The cross bar is made of a plug with a plug welded on both ends of the steel pipe.
- Q:I know it's soon, but my piercings swollen and quite sore when knocked slightly.I've only had it three or four days, but there's a swollen round lump right next to one pierced hole and I was worried it could be an early sign of a keloid. But I don't know if it's too soon to tell yet.I know they can take up to 6 months to heal, if not more, but I'm kinda paranoid about it.I've rinsed it after showering, used salt water on it every day and apart from that just washed it with water on a cotton bud.Any advice?
- I had my industrial for 13 months and it never healed. I decided to retire it and the piercing sites closed up within 6 hours. Seriously, my advice to you is to just take it out. They are wayyyy more trouble than they are worth.
- Q:Topic?Scaffolding construction program how to doSpecial construction scheme
- 6, the vertical bar is arranged, it is necessary to consider the distance between the horizontal bar. The general spacing should not be greater than 1.5 meters (through the calculation of the pressure bar instability spacing);7, pay attention to the level of the rod near the ground and the top of the surface must have a rod (some people do not think this is necessary, but often up and down instability is difficult to insurance);8, the longitudinal brace configuration, with full support from top to bottom bracing will cross 45 degrees continuous configuration, intermediate cannot disconnect (i.e. a brace from the top to the ground, the middle long); brace configuration based on experience, but also can be calculated (using coplanar force system, theoretical mechanics learned);9, lateral bracing configuration, the same as the vertical;10, considering the load loading calculation of concrete three days is enough, if the concrete two times, loading unnecessary all add up, because the first pouring concrete general solidification, not the calculation of the load, favorable.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Customers Concern for Using Swivel Scaffolding Swivel Couplers with Hot Galvanized
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 15000 pc
- Supply Capability:
- 300000 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Hot Searches
Related keywords