Construction & Real Estate scaffolding for promotion

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
10000 pc
Supply Capability:
10000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Quick Details

Brand Name:

TYT

Model Number:

scaffolding sets



size:

all size can be customize or as drawings

color:

as requested

type:

light or heavy duty

surface:

painted, galvanized, powder coated

use:

together use with formwork

packing:

in bundle/pallet or as requested

main components:

main tube, solit screw, plates, etc.

support:

fix vertical formwork

main market:

Southeat Asia, South America, Middle East, etc.

weld:

manual welding





Packaging & Delivery

Packaging Detail:in bundle or in pallet, can ba as requested
Delivery Detail:within 20 days after confirmation

Specifications

scaffolding:0914/1219/1524/1700/1930 mm 
main tube:42mm 
small tube:25mm 
thickness:1.2/1.5/1.8/2.0/2.2mm 
can be customiz

 

 

Product Description

 the below are normal size, we can customize for you accrodingly.

 

height

Main tube

Weight

9014 M

42 mm

8.0 KG

1219 M

42 mm

11.4 KG

1524 M

42 mm

13.1 KG

1700 M

42 mm

13.6 KG

1930 M

42 mm

15.0 KG

 

 

Packaging & Shipping

 packing are suitable for shipping, conveniently loading and unloading by forklift.

Our Services

 we are an experienced manufacturer of scaffolding products, 

all you need to do is confirm the size you need, we will arrange the rest work for you, 

confirm sample, begin to production, arrange shipment.


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:The relevant provisions of the demolition of the external wall scaffold:
Three, discharge should meet the following requirements:1, the structure is strictly prohibited to throw to the ground;2, transported to the ground should be timely inspection of the construction parts, repair and maintenance, and according to the varieties, specifications at any time yard storage.
Q:Find the demolishing scheme of scaffold
Removal of scaffolding shall comply with the following requirements:11.2.1 removal operations must be carried out from top to bottom, prohibited from top to bottom operation at the same time;11.2.2 even wall pieces must be removed with the scaffolding layer by layer, is strictly prohibited even after the first wall or a few layers of the demolition of the dismantling of scaffolding; demolition of the height difference should not be greater than 2 steps, such as the height difference is greater than the 2 step, should be added to strengthen the wall;
Q:would a scaffold piercing look gay on a guy?
No it would probably look good, but it kind of depends what you look like before you get it. If you want it go for it.
Q:Could someone please tell me a very simple scaffold on writing commentary?
A vegan alcoholic! A chuckle emerges, a laugh perhaps for a few more bobs. Absent the mind, nicely put.
Q:A 115 kg scaffold is 7 m long. It is hanging with two wires, one from each end?
Because the scaffold is not moving, we can assume that the net Torque acting on the scaffold equals zero. Net Torque = 0 torque = Force x distance (d) Use the left end of the scaffold as the center point. This will eliminate the Torque caused by the left wire (d = 0, so torque = 0) There are now three forces creating torque on the scaffold. There is the weight (m x g) of the scaffold, at 3.5m from the left end. m1 x g x 3.5m There is the weight of the crate, located 1.4m from the left end: m2 x g x 1.4m These two torques are countered by the torque caused by the Tension (T) of the right wire, located 7m from the left side. T x 7m The sum of these torques is zero. (T x 7m) - (m1 x g x 3.5m) - (m2 x g x 1.4m) = zero solve for T T = ((m1 x g x 3.5m) + (m2 x g x 1.4m)) / 7m T = ((115kg x 9.8m/s^2 x 3.5m) + (520kg x 9.8m/s^2 x 1.4m)) = 1.58 x 10^3 N Hope this helps.
Q:Can I clean my scaffold piercing with my make-up wipes?
problematic problem. browse at search engines like google. this could help!
Q:what is the height of a scaffold if the person is 6ft tall?
Whatever they set it at. It could be 1 foot, 4 feet, or 20 feet. How tall a person is, is irrelevant.
Q:Question about ΣF=0 on a scaffolding (Mechanical Equilibrium)?
You are correct so long as the scaffolding is not allowed to move. I.e. the cables suspending it are locked and not unwinding from their spools as more workers get on. More weight added would necessarily increase the tension in this type of case. However, if, when another worker got on and the tension could not increase for what ever reason, a downward acceleration would take place that is proportional to the worker's weight. Hope that clears things up.
Q:How to calculate the fastener type steel pipe scaffold
The provisions of 1.1.4 in steel pipe scaffold structure thin-walled steel structure design, involved in the weld connection, the stability coefficient of the axial compression members, should use the "technical specification for Cold-Formed Steel Structures" (GBJ18-87).1.1.5 provides for the design and calculation of scaffolding:(1) the calculation of the overall stability of the frame (can be converted into the calculation of the stability of the opposite pole);(2) checking the strength, stability and stiffness of horizontal bar;(3) calculation of strength and stability of attached and continuous wall;(4) anti overturning checking;(5) checking of foundation and supporting structure.
Q:A window washer is standing on a scaffold supported by a vertical rope at each end.. . .?
Sum moments left side...(assume worker 1m from left) Right rope = 316.516 Sum vertical.... Left rope = 552.484

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range