• Concrete Pump Truck Parts Bend DN125 R1000 45DRG System 1
  • Concrete Pump Truck Parts Bend DN125 R1000 45DRG System 2
  • Concrete Pump Truck Parts Bend DN125 R1000 45DRG System 3
Concrete Pump Truck Parts Bend DN125 R1000 45DRG

Concrete Pump Truck Parts Bend DN125 R1000 45DRG

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
100 pc
Supply Capability:
10000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Product Description:

Widely used on concrete pump truck, concrete placing boom, trailer concrete pump etc, for concrete delivery bend connection. 
Our concrete pump bends have been successfully exported to many countries from 1998, Our main markets as below: Middle East, Southeast Asia, America, Brazil, Italy, Russia, South Africa etc.


Main Product Features:

  1. High Chromium and manganese content, which enables a higher wear resisting ability and longer lifetime. 

  2. We have been providing parts for nearly ten years, and cooperating with the agent of the world famous brand, possess near every kind of bend in the market. 

  3. Possess quality certification of ISO 9001:2000. Can pass CE test.

  4. The inner side of this concrete pump bends undergo heat treatment, and then the hardness can reach 62HRC. 

  5. OEM service available. 

  6. Fitting to PUTZMEISTER, SCHWING Sany, Zoomlion  concrete pumps


Product Specifications:

Technical: Casting

Radius: 1000mm

Degree: 45

Material: Mn13-4

Characteristics: According to our technology, the casting bends also has high working pressure and burst pressure. 

Package: PP woven bag and plastic cap


FAQ:

Q1: How to confirm that your bends could be used in our pump?

A1: We have been providing parts for nearly ten years, and cooperating with the agent of the world famous brand, possess near every kind of bend in the market. What is more, we can produce as the customers’ request with drawing provided.

Q2: How do we guarantee the quality of our products?

A2: We have established an advanced quality management system which conducts strict quality tests at every step, from raw materials to the final product. 

Q3: How soon can we receive the product after purchase?

A3: Within three days of placing an order, we will begin production. The specific shipping date is dependent upon international and government factors, but is typically 5-15 workdays.

Q4: If we can produce some Concrete Pump Truck Parts according to customers request?

A4: Yes, we can produce Concrete Pump Truck Parts according to the difference country situations to make it suitable to the market and customers. We have very professional technical team to make the design.

Q5: How to make a quick resolution for after service?

A5: OKorder and our manufacture both have overseas branches all-around of world, IF needed, the seller shall dispatch 2 engineers to the buyer's site for supervision of training. The buyer shall make available of necessary facilities & skilled personnel at site for training.


Concrete Pump Truck Parts Bend DN125 R1000 45DRG

Concrete Pump Truck Parts Bend DN125 R1000 45DRG

Concrete Pump Truck Parts Bend DN125 R1000 45DRG

Concrete Pump Truck Parts Bend DN125 R1000 45DRG

Concrete Pump Truck Parts Bend DN125 R1000 45DRGConcrete Pump Truck Parts Bend DN125 R1000 45DRG

Other Products:

Concrete Pump Truck Parts Bend DN125 R1000 45DRG

Concrete Pump Truck Parts Bend DN125 R1000 45DRG

Concrete Pump Truck Parts Bend DN125 R1000 45DRG

Concrete Pump Truck Parts Bend DN125 R1000 45DRG

Concrete Pump Truck Parts Bend DN125 R1000 45DRG

Concrete Pump Truck Parts Bend DN125 R1000 45DRG




Q:How can I minimize downtime during the replacement of concrete pump spare parts?
Minimizing downtime during the replacement of concrete pump spare parts requires careful planning and efficient execution. Here are a few strategies that can help you achieve this: 1. Regular maintenance: Implement a proactive maintenance schedule to identify and replace worn-out parts before they fail. Regularly inspecting the concrete pump and its components can help prevent unexpected breakdowns and reduce downtime. 2. Stock up on spare parts: Keep an inventory of commonly required spare parts, such as seals, filters, and hoses. Having these items readily available can significantly reduce the time spent on sourcing and ordering parts when a breakdown occurs. 3. Partner with reliable suppliers: Establish a relationship with reliable suppliers who can provide high-quality spare parts quickly. This ensures that you have access to the required parts promptly, minimizing the waiting time for delivery. 4. Train your team: Provide training to your maintenance and operational staff on how to identify, troubleshoot, and replace concrete pump spare parts efficiently. Equipping your team with the necessary skills will enable them to address issues promptly, reducing the overall downtime. 5. Plan maintenance during downtime: Schedule maintenance and replacement of spare parts during periods of low demand or downtime. This could be during weekends, holidays, or slower construction phases. Planning the work strategically ensures that it has minimal impact on ongoing projects. 6. Optimize workflow: Streamline your maintenance process by identifying areas that cause delays or bottlenecks. Look for opportunities to improve efficiency, such as optimizing the layout of spare parts, tools, and equipment, or implementing standardized procedures for repair and replacement. 7. Use technology: Leverage technology to monitor the performance and condition of your concrete pump. Implementing a condition monitoring system can help detect early signs of potential failures, allowing you to plan for maintenance and part replacement in advance. By implementing these strategies, you can minimize downtime during the replacement of concrete pump spare parts, ensuring uninterrupted operations and maximizing productivity.
Q:How often should agitator shaft seals be replaced in a concrete pump?
Several factors influence the frequency of agitator shaft seal replacement in a concrete pump. These factors include the type and quality of the seal, the pump's operational conditions, and the user's maintenance practices. However, as a general rule, it is advisable to inspect and replace agitator shaft seals every 500 to 1,000 operating hours or annually, whichever comes first. Regular inspection of the seals is essential. This is to detect any signs of wear, leakage, or damage. If any of these issues are found, immediate seal replacement is necessary. This is to prevent further damage to the pump and ensure optimal performance. It is also important to adhere to the manufacturer's instructions and recommendations for seal replacement. These instructions may be specific to the pump model and seal type. Proper maintenance practices, such as regular cleaning and lubrication of the seals, can help prolong their lifespan. This can also reduce the need for frequent replacements. It is important to remember that failure to replace worn or damaged agitator shaft seals in a timely manner can result in increased downtime, decreased efficiency, and potential damage to other pump components. Therefore, regular inspection and replacement of agitator shaft seals should be prioritized to ensure the smooth operation and longevity of the concrete pump.
Q:Can concrete pump spare parts be repaired on-site, or should they be sent to a specialized repair facility?
Concrete pump spare parts can be repaired on-site in certain cases, while in others it may be necessary to send them to a specialized repair facility. The decision of whether to repair on-site or send for specialized repair depends on the nature and complexity of the repair required, the availability of skilled technicians and equipment, and the time constraints of the project. In many cases, minor repairs or replacements of simple components can be carried out on-site. These may include tasks such as replacing hoses, seals, or filters, which can be done quickly and easily with basic tools and equipment. These types of repairs can often be performed by the operators or maintenance personnel themselves, without the need for specialized technicians. However, for more complex repairs or replacements, it is advisable to send the spare parts to a specialized repair facility. This is particularly true for critical components such as hydraulic cylinders, valves, or control systems, which require specialized knowledge and expertise to repair properly. Specialized repair facilities have trained technicians who specialize in specific equipment and are equipped with the necessary tools and resources to diagnose and fix complex issues. Moreover, specialized repair facilities often have access to a wider range of spare parts and can source genuine parts from the original manufacturer. This ensures that the repaired spare parts are of high quality and compatible with the specific make and model of the concrete pump. Additionally, these facilities may offer warranties on their repairs, providing peace of mind to the equipment owners. Ultimately, the decision to repair on-site or send for specialized repair depends on the specific situation and resources available. It is important to assess the complexity of the repair, the availability of skilled technicians, and the potential impact on the project timeline before deciding on the most appropriate course of action.
Q:How often should concrete pump booms be inspected and maintained?
To ensure the safe and efficient operation of concrete pump booms, it is important to inspect and maintain them regularly. The frequency of these inspections and maintenance tasks will depend on how often and under what conditions the boom is used. Generally, it is recommended to inspect and maintain the boom at least once a month or after every 250 pumping hours, whichever comes first. During these inspections, it is crucial to carefully examine the boom for any signs of wear and tear, damage, or malfunctioning parts. The hydraulic system, including the hoses, cylinders, and valves, should be thoroughly inspected and tested for leaks, blockages, or malfunctions. Additionally, the structural integrity of the boom, such as the main boom, articulation points, and outriggers, should be checked for cracks, deformations, or signs of stress. Regular maintenance of the concrete pump boom should include cleaning and lubricating all movable parts, checking and adjusting the tension of the cables, belts, and chains, and replacing any worn-out or damaged components. It is also important to inspect and test the electrical and control systems to ensure proper functioning. In addition to regular inspections and maintenance, it is crucial to follow the manufacturer's guidelines and recommendations for specific maintenance intervals and procedures. Depending on the level of usage, working conditions, and any changes in performance or operation, it may be necessary to conduct more frequent inspections and maintenance. By conducting regular inspections and maintenance, concrete pump boom owners can reduce the risk of accidents, extend the lifespan of the equipment, and ensure optimal performance. It is always advisable to consult with the manufacturer or a qualified professional to determine the most suitable inspection and maintenance schedule for a specific concrete pump boom.
Q:How can the concrete pump be installed and used?
Concrete conveying pipe joints should be sealed tightly, pipe should be firmly connected. The vertical pipe shall be no less than 10m horizontal pipe with check valve. The vertical pipe shall not be attached directly to the outlet of the concrete pump.
Q:What is the role of a concrete pump hopper vibrator?
The role of a concrete pump hopper vibrator is to ensure the smooth and efficient flow of concrete through the pump system. The vibrator is typically attached to the hopper, which is the large container that holds the concrete mixture. The vibrator works by creating high-frequency vibrations that help to break up any air pockets or clumps in the concrete, allowing it to flow freely through the pump and out of the nozzle. This is important because if the concrete is not properly vibrated, it can become clogged or blocked, leading to delays and inefficiencies in the construction process. In addition to facilitating the flow of concrete, the hopper vibrator also helps to improve the overall quality of the concrete. By eliminating air pockets and ensuring a smooth, consistent flow, the vibrator helps to reduce the risk of voids or weak spots in the finished concrete structure. Overall, the role of a concrete pump hopper vibrator is crucial in ensuring the successful and efficient pumping of concrete, while also enhancing the quality of the final product.
Q:What is the purpose of a concrete pump remote control battery?
The purpose of a concrete pump remote control battery is to provide power for the remote control device, allowing operators to remotely control the concrete pump's functions and movements without being physically connected to the machine.
Q:How can one ensure compatibility between concrete pump spare parts and the pump?
Ensuring compatibility between concrete pump spare parts and the pump is crucial to maintain the efficiency and performance of the equipment. Here are a few steps to ensure compatibility: 1. Identify the correct model and manufacturer: Gather all the necessary information about the concrete pump, including the model number and manufacturer. This information will help you find the right spare parts that are specifically designed for that particular pump model. 2. Use genuine spare parts: It is always recommended to use genuine spare parts provided by the pump manufacturer or authorized distributors. Genuine parts are specifically designed and tested to meet the pump's specifications, ensuring a perfect fit and compatibility. 3. Check part numbers and specifications: Before purchasing any spare parts, carefully cross-check the part numbers and specifications with the original parts. This will help ensure that the new parts are compatible with the pump. 4. Consult with experts: If you are unsure about the compatibility of certain spare parts, consult with experts or the manufacturer's technical support team. They can provide guidance and advice based on their expertise and experience. 5. Conduct regular maintenance and inspections: Regularly inspect and maintain the concrete pump to identify any wear or damage to the parts. This will help you identify the specific spare parts that need replacement and ensure compatibility with the pump. 6. Prioritize quality and reliability: While cost may be a factor, it is important to prioritize quality and reliability when choosing spare parts. Investing in high-quality parts will ensure better performance, durability, and compatibility with the pump. By following these steps, you can ensure compatibility between concrete pump spare parts and the pump, thereby maximizing its lifespan, performance, and overall efficiency.
Q:Are there any specific guidelines for the transportation of concrete pump spare parts?
Yes, there are specific guidelines for the transportation of concrete pump spare parts. These guidelines ensure that the spare parts arrive at their destination in good condition and are ready for immediate use. Here are some key guidelines to consider: 1. Packaging: Spare parts should be adequately packaged to prevent any damage during transportation. This may include using sturdy boxes, crates, or pallets to protect the parts from impacts and vibrations. 2. Labeling: Each package should be clearly labeled with the contents, including the specific part name and number. This helps in easy identification and prevents any confusion during the transportation process. 3. Handling: Spare parts should be handled with care to avoid any mishandling or dropping, which could lead to damage. It is recommended to use proper lifting equipment and follow safe handling practices to ensure the parts are not subjected to excessive stress or force. 4. Securing: Packages should be secured properly to prevent movement or shifting during transportation. This can be achieved by using strapping, shrink-wrapping, or other appropriate methods to hold the packages in place. 5. Temperature control: If the spare parts are sensitive to temperature, it is important to ensure proper temperature control during transportation. Extreme temperature variations can cause damage to certain parts, so it is essential to protect them accordingly. 6. Transportation mode: Depending on the size and weight of the spare parts, suitable transportation modes should be selected. For larger parts, it may be necessary to use flatbed trucks or specialized vehicles that can accommodate the size and weight of the parts. 7. Insurance: It is advisable to have proper insurance coverage for the transportation of concrete pump spare parts. This provides financial protection in case of any unforeseen incidents or damages during transit. By following these guidelines, the transportation of concrete pump spare parts can be carried out smoothly and safely, ensuring that the parts are delivered intact and ready for use.
Q:Can a concrete pump pipe be repaired or should it be replaced?
A concrete pump pipe can be repaired in some cases, but it ultimately depends on the extent of damage and the specific circumstances. Minor cracks or small sections of damage can often be repaired using specialized techniques such as welding or epoxy injections. However, if the damage is widespread, severe, or compromises the structural integrity of the pipe, it may be more cost-effective and safer to replace the entire pipe. It is important to assess the condition of the concrete pump pipe thoroughly before deciding whether to repair or replace it. Factors such as the age of the pipe, the overall condition of the pump, and the frequency of use should be taken into consideration. Consulting with a professional or an experienced concrete pump technician is advisable to determine the best course of action. In conclusion, while repairs can be made to a concrete pump pipe, the decision to repair or replace should be based on the extent of damage, cost-effectiveness, and safety considerations.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords