Concrete Pump Truck Chassis Used Schwing (2003, 350~450HP)
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 PCS
- Supply Capability:
- 1500 PCS/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Concrete Pump Truck Chassis Used Schwing (2003, 350~450HP)
Product Details
Basic Info.
Model NO.:SCHWING
Load Capacity:21-30t
Drive Wheel:8×4
Engine Capacity:>8L
Seats:≤5
Horsepower:351-450hp
Tire Type:Solid Tire
Power:Diesel
Tire Design:Tubeless
Transmission Type:Manual
Tire Certification:ECE, GCC, ISO, DOT
Emission Standard:Euro 3
Condition:Used
Total Weight:26t
Engine Power:360HP
Number of Cylinder:10
Manufacture Year:2003
Boom Height:35m
Rated Ngine Capacity:12L
Allow Passengers Cab:2 People
Overall Dimensions (L*W*H):12200X2495X3990mm
Export Markets:Global
Additional Info.
Trademark:Isuzu
Packing:Bulk Carrier or Roro Shipping
Standard:CE/SGS/CO/ISO
Origin:Japan
HS Code:84292010
Production Capacity:8 Sets Per Month
Product Description
Brand | Isuzu |
Model | Schwing |
Year | 2003 |
Output capacity (m3/h) | 120 |
Concrete pressure(bar) | 61~76 |
Concrete cylinder(mm) | 230X2000 |
Mixer Hopper Capacity (L) | 550 |
Boom unfolding height (m) | 8.9 |
Boom vertical reach (m) | 47 |
Boom horizontal reach (m) | 42 |
Boom depth reach (m) | 33 |
Original place | Japan |
Leading time | 7 days |
Type | high altitude operation truck |
Aspiration | turbocharged & aftercooled |
Operating ocndition | very good condition, work efficiently |
Aftersales service | overseas service provided |
Test operation | machine can be tested & inspected in yard |
Trading terms | FOB, CIF, CFR |
Payment | L/C, T/T, west union |
Color & refurbishment | 1. original white & green 2. machine can be repainted as U request |
Repairing state | 1. no heavy repairing, no oil leak; 2. machine can be inspected, 3. broken parts be replaced before shipping |
Delivery details | 1. bulk or roro shipping; 2. about one month after downpayment |
Cab condition | 1. safe & comfortable 2. not easy to be tired to work for a long time |
- Q: What is the main composition of concrete pump
- The pump body installed in the car chassis, and then equipped with retractable or inflected cloth rod, the composition of the pump
- Q: Is it easy to use fine stone concrete pump?
- It is used for the construction of warm and warm concrete and other concrete construction engineering problems. It is suitable for the filling area of the fine concrete or the mortar filling area ,
- Q: What is a concrete pump?
- Concrete pump, also known as concrete pump, composed of pump and pipe.
- Q: How to choose concrete pump concrete pump
- The main performance parameters of the commonly used concrete pump should be consistent with the construction requirements or slightly larger, if the capacity is too large, the utilization rate is low, too small, not only can not meet the requirements will accelerate the loss of concrete pump.
- Q: Why concrete pump truck with foreign chassis
- China began in 1982 from the introduction of Japanese technology for concrete pump truck production, after 20 years of development, although the current domestic concrete pump design and manufacturing capacity has been greatly improved.
- Q: What is the depreciation period for concrete and concrete carriers and how much net residual value is
- The net residual value of fixed assets is between 3% and 5% of the original value of fixed assets.
- Q: What is the meaning of cast - in - place concrete secondary grouting?
- Grouting equipment is divided into two kinds of mechanical and manual, the building is more manual, (like the peasant playing the kind of hand pump with pesticide).
- Q: How to operate concrete pump
- (10) after the operation, the hopper and the pipeline must be all the concrete output, and then the pump, hopper, pipe cleaning.
- Q: How the calculation of the discharge speed of concrete pump truck
- Friends of the concrete pump truck discharge speed has a theoretical displacement and the actual displacement
- Q: How to deal with pumping concrete pump pipe pipe burst after the burst, the pump can not stop the situation?
- The time required for pouring concrete drains depends on the slump of concrete, the time of plasticizing, the height of pumping, the length of the pipe, the resistance to pumping, the temperature, and so on.
Send your message to us
Concrete Pump Truck Chassis Used Schwing (2003, 350~450HP)
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 PCS
- Supply Capability:
- 1500 PCS/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords