• Concrete Pump Schwing (34 M)  with Truck Head System 1
  • Concrete Pump Schwing (34 M)  with Truck Head System 2
Concrete Pump Schwing (34 M)  with Truck Head

Concrete Pump Schwing (34 M) with Truck Head

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 PCS
Supply Capability:
1500 PCS/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Concrete Pump Schwing (34 M)  with Truck Head

Product Details

Basic Info.

Model NO.:Schwing KVM37XG

 

Type:Concrete Pump

Shotcrete Type:Wet

 

Machining Process:Hydraulic

Structure:Cylinder Type

 

Productivity:90㎡/h

Feeding Height:34m

 

Certification:ISO9001: 2000, CE

Condition:Used

 

Color:Green

Model Number:Kvm37xg

 

Concrete Brand Name:Schwing

Truck Head Name:Isuzu

 

Machine Weight:25t

Lead Time:7 Days Around

 

Height:3880mm

Width:2495mm

 

Length:11075mm

Chassis Number:Isuzu Cxz51q

 

Boom Length:32m

Export Markets:North America, South America, Africa, Mid East, Eastern Asia

Additional Info.

Trademark:concrete pump

 

Packing:Container

Standard:SGS

 

Origin:Japan

HS Code:87042300

 

Production Capacity:2 Units Per Month

Product Description


1.Manufacture year :2003
2.Length :34M 
3.Chassis :isuzu cxz51q

Brand &Model Schwing  KVM37XG
boom length 37M
Engine Power 315kw
location Shanghai 
Machine Weight 25 ton 
Leading Time  7 days after u place order 
Loading Term roro ship 
Shipping Port Shanghai 
Guarantee Time 1 year 
Location  shanghai, stock available 
Working Condition 80 % NEW 
Export Standard  Before export will offer refurbishment 
Payment Term T/T, L/C, Western union. 
Trade TermFOB/CIF/CFR
Mainly MarketAfrica /Southeast Asia/Mid East/Arabic CountrySouth America
Services 1.Offer machine parts within guarantee time 
2.Pick u up at airport & hotel 
3. Guide u visit shanghai when u are free 
4.Price is negotiable as we do business at low profit just for       future business with you . 
Company  Age > 8 years ,Enjoy high reputation from consumer .
Clean Customs Files 1.B/L  
2.Commercial Invoice  
3.Packing list 
4.Insurance
Besides the above ,if u still need other files ,we will offer .
New Business Range Dump truck .Mixer truck ,Ripper ETC.

Concrete Pump Schwing (34 M)  with Truck Head

Concrete Pump Schwing (34 M)  with Truck Head


Q: What is the main composition of concrete pump
Concrete large transport equipment, for high-rise, high-speed, overpass and other large concrete concrete concrete work.
Q: What is the history of the concrete pump
In the late 1960s, Putzmeister launched a 16-meter boom pump truck. In 1998, Sany Heavy Industry successfully developed China's first 37-meter boom pump with independent intellectual property rights, breaking the foreign brands to the Chinese market
Q: What is a concrete pump?
Concrete pump, also known as concrete pump, composed of pump and pipe.
Q: How to prevent concrete pump blockage
Partial Leakage: Conveying Pipe Fitting Seal Fasten or replace the seal; shrink the profiled bolt to adjust the eyeglass and cut ring clearance; the piston is intact; the delivery cylinder is intact.
Q: What is the lubrication of the concrete pump before it is transported to the concrete?
Concrete pump to transport concrete before the pipeline lubrication
Q: How to cooperate with concrete mixers and concrete pump trucks
the site pump has a bucket, mixer car unloading the material in the bucket bucket,
Q: What is the performance characteristics of concrete pump
9all parts of the national standard, interchangeability is better
Q: Building concrete pump is how to bulk cement (concrete) to the high
Repeatedly, the concrete in the hopper is continuously sucked in and out of the delivery tank, through the Y-pipe and outlet connected to the pipeline to reach the point of operation to complete the pumping operation
Q: What is the name of the pump called concrete?
The concrete pump is retrofitted on a truck chassis, which is equipped with a sports and powertrain, a pump and a stirrer, a cloth, and other auxiliary devices on the chassis.
Q: How much concrete construction is needed for concrete pump construction
First of all to be able to put down the support of the pump feet, a good pump the length of the pump is not the same, followed by the top of the site to no wires and other obstacles, and finally to ensure that the concrete mixer into the normal and leave,

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords