Composite Geomembrane,One Geoxtetile One Film
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 10000 m²
- Supply Capability:
- 300000 m²/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1.Structure of Composite Geomembrane Description:
Composite geomembrane (composite anti-seepage film) is divided into a cloth a membrane and two cloth film, 4-6 m wide, weighs 200-1500 g/m2, tensile and tearing resistance, bursting physical mechanics performance index is high, the product has high strength, good extension performance, large deformation modulus, acid and alkali, corrosion resistance, ageing resistance, good anti-seepage performance. Can satisfy the water conservancy, municipal, construction, subway, tunnel, the seepage control engineering construction crack, isolation, reinforcement, reinforcement and other civil engineering needs. Commonly used in dam seepage prevention and drainage ditches, and anti-fouling processing of scrap yard.
2.Main Features of Composite Geomembrane:
High strength, good extension performance, large deformation modulus.
Acid and alkali resistance, corrosion resistance, ageing resistance.
Good seepage control performance.
3.Specification of Composite Geomembrane:
Item | 20-15 | 30-22 | 40-28 | 50-35 |
Breaking strength at warp direction (kN/m) ≥ | 20 | 30 | 40 | 50 |
Breaking strength at weft direction (kN/m) ≥ | 15 | 22 | 28 | 35 |
Elongation at break (%) ≤ | 28 | 28 | 28 | 28 |
Bursting strength (kN) ≥ | 1.6 | 2.4 | 3.2 | 4.0 |
4.Images of Composite Geomembrane:
- Q: Eastern rainbow waterproof how to do
- Do not know where you use, waterproof as if a lot of materials. I know there are coiled, painted.
- Q: How to ensure the waterproof quality of the underground shear wall (retaining wall)?
- 3, according to the hydrogeological conditions and outdoor environment type to take the appropriate level of waterproof concrete.
- Q: Can acrylic materials be perforated? How to do waterproof after punching?
- Acrylic material thickness is generally below 2MM, Plus the total thickness of glass fiber reinforced plastic materials are generally below 4MM,
- Q: Find the construction steps for waterproof coatings
- 1, base surface treatment (1) roof structure After the completion of concrete pouring, should be repeated water compaction, so that the surface of the grass-roots level, the flatness with 2m to check the ruler, ruler and grass-roots gap of not more than 5 mm, and only allow gentle changes. (2) the base surface of the pores, rugged, honeycomb, gap, sand, etc., should be promptly treated, the base surface must be clean, no floating slurry, no water beads, no water; when the base surface appears more than 0.3 mm cracks , Should rush each 10 cm brushing 1 mm thick polyurethane coating waterproof layer, and then set the polyurethane cloth reinforcement layer, and finally brushing waterproof layer. (3) all the corners are used 5 × 5㎝ 1: 2.5 cement mortar for chamfering, the angle made R = 10 mm rounded corners.
- Q: How does the finished ventilator manufacturer waterproof?
- do not play any silicone and tape, to avoid the silicone tape aging caused by leakage hazards. Can be done once and for all.
- Q: Nanning building waterproof material market where
- to buy what materials are going to go to some factories, such as paper, printing materials and other manufacturers in the Nanning High-tech Zone or Nanning Economic Development Zone may be more
- Q: Self-built concrete house finished three years after the use of large-scale housing wall leakage how to do?
- Third, from the indoor water leakage area for waterproof maintenance.
- Q: There is no formaldehyde in the finished putty
- In addition, the addition of redispersible latex powder in the putty powder will make the putty have stronger adhesion and mechanical properties, outstanding water resistance, permeability, as well as excellent alkali resistance, abrasion resistance, and can improve water retention Sex, increase the opening time, enhance the durability.
- Q: I would like to ask how to do in the warm water above,
- I do not do 80% of the warm water, of course, the use of good quality water pipes, waterproof water is generally done in the following to do, if done in the warm tube above will affect the heat of the floating, to warm the following covered with a Layer insulation layer and then covered with warm tube to, and then beat the water to ensure that no leakage. And finally in the above covered with wooden floor or floor tiles.
- Q: Roof sunscreen waterproof layer leakage, brush milk white plastic can solve it?
- Second, check the plaster layer is empty, if not empty easy to use polyurethane brush twice, the surrounding multi-coated 10 cm. If the empty drum, then use the cutting machine to remove the plaster within the scope of the plaster, along the cracks on both sides of the expansion of 10 cm brush twice the polyurethane, brush the cement slurry and then do the surface layer. If a large area of ??leakage, it is recommended to use acrylic waterproof coating brush twice, because the polyurethane black too heat in summer affect the indoor temperature.
Send your message to us
Composite Geomembrane,One Geoxtetile One Film
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 10000 m²
- Supply Capability:
- 300000 m²/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords