• CAT Throttle Motor for E320 System 1
  • CAT Throttle Motor for E320 System 2
  • CAT Throttle Motor for E320 System 3
CAT Throttle Motor for E320

CAT Throttle Motor for E320

Ref Price:
get latest price
Loading Port:
Guangzhou
Payment Terms:
TT OR LC
Min Order Qty:
20 pc
Supply Capability:
500 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

CAT Throttle Motor

APPLICATION
E320

OEM:105-0092

           106-0092X

 

 Excavator spare parts in full-scale are available; 
 100% quality assurance, develop and manufacture follow original ones; 
 Quick response within 24 hours ; 
 Small order allowed; 
 Reasonable stock and timely delivery; 
 Original packing, neutral packing or customized packing; 
 Positive customer feedback from abroad market; 
 Excellent After-sales service. 

We also can supply the following spare parts:

1. Hydraulic Parts: hydraulic pump, main valve, hydraulic cylinder, final drive, travel motor, swing machinery, swing motor etc.

2. Engine parts: engine assembly, liner, piston, piston ring, cylinder block, cylinder head, crankshaft, camshaft, turbocharger, fuel injection pump, injector, starting motor and alternator etc.

3. Undercarriage part: track roller, carrier roller, track link, track shoe, sprocket, idler and idler cushion etc.

4. Cab parts: operator’s cab, wiring harness, monitor, controller, seat, door etc.

5. Cooling parts: radiator, oil cooler, air conditioner, compressor, after cooler etc.

6. Other parts: service kit, swing circle, engine hood, swivel joint, fuel tank, filter, boom, arm, bucket etc.

 

Delivery Time:                                                        

1. Generally, parts will be shipped out within 15 days after getting the receipt of payment.

2. If some parts are no stock and need to order, we will inform customers advanced.

3. Sometimes parts will be delay because of holiday or weather, please be patient, and keep in touch with us.

Q: The building electrical iron pipe and the pipe line fixing member connected to what is called, what is called the iron pipe and the 86 fixed part of tin
Pipe or direct protection, construction of special operation personnel of construction electrician training materials, focus on the "construction of special operations personnel management regulations", "construction of special operations personnel safety technology assessment program (Trial)", "construction of special operations personnel safety operation skills examination standard (Trial)" and other relevant provisions safety, technical knowledge and skills to master for construction electricians were explained, the book has 10 chapters, including: basic knowledge, common low-voltage electrical appliances and Motor City, power supply and grounding earthing protection system.
Q: Where was the construction machinery conference held in 2015?
Support unit: Automobile and engineering machinery parts testing institute, Qihe Economic Development Zone, Shandong Province, Shandong Jiaotong University, Mechanical Engineering Institute, Qingzhou Engineering Machinery Industry Association, three, China Railway ten Bureau, in a company, China water conservancy and hydropower Sixth Engineering Bureau Co., Shandong high speed group limited company, the China Metallurgical Construction Group Limited, China Railway Construction Group, Shandong road fourteen, Shandong the Yellow River Engineering Bureau Group Co. Ltd., Ji'nan City Highway Bureau, Dezhou City Highway Bureau, Tai'an City Highway Bureau, Jining City Highway Bureau, Laiwu City Highway Bureau, Shandong WorldCom Highway Construction Co. Ltd.
Q: What are the sectors of machine building and parts processing?
1., industry generally refers to its production of similar products, or with the same process, or to provide similar labor services division of economic activities, categories.
Q: What kind of electrical equipment do you have? What are the main components of each device?
Electrical equipment mainly refers to the transformer, reactor, capacitor, combination electric appliance, circuit breaker, transformer, lightning arrester, coupling capacitor, transmission line, power cable, grounding device, generator, condenser, motor, closed busbar, thyristor.
Q: What type of industry does the machinery and building accessories processing belong to?
There are only three tax categories in our country: 1 consumption tax, 2 VAT, 3 special tax (agriculture). Therefore, as long as the manufacturing or processing of industrial value added tax on enterprises. It has nothing to do with the economic nature, classification and categories of an enterprise.
Q: Where are the mechanical pressurization air supply facilities set up?
The purpose of setting up a mechanical pressurization air supply smoke prevention system is to provide evacuation routes and shelters without smoke interference in the event of a fire in the building. Therefore, in the closed door, pressing position, and the fire floor must maintain a certain pressure difference, the position of the air pressure value is a relative positive pressure); at the same time, in the open part of the pressure when the door can have enough air velocity in the opening section, to effectively prevent the intrusion of flue gas, the safety of personnel ensure evacuation and refuge.
Q: China mechanical net
There are mechanical product development and design, mechanical equipment transformation, mechanical equipment maintenance, data inquiries, standard inquiries, mechanical professional translation, mechanical CAD and other mechanical and technical services.
Q: How are buildings, installations and materials divided?
Provisions on the division of equipment and materials for engineering construction? [answer] the division of equipment and materials in engineering construction is directly related to the reasonable division of investment structure, budget preparation and calculation of construction output value. In order to reasonably determine the project cost, strengthen the investment in the process of construction and management, the equipment and materials in the engineering construction is unclear, especially the universal controversial common problems and put forward the principle of division of fifteen copies of "national unified installation project budget quota" of the equipment and materials are divided, the provinces, autonomous regions and municipalities directly under the central government and the relevant departments of the State Council, the Department should be combined with the local situation, formulate rules for its implementation, and report to the Ministry of construction for the record.
Q: What is a door rack for a construction site? How high is it generally?
Door scaffolding has not yet unified design and product standards, the products of different specifications, quality is inconsistent. Not only for construction units to use and management of great difficulties, is not conducive to the promotion of applications, but also to the construction safety risks. Therefore, it is necessary to organize and issue a unified standard for door scaffolding
Q: What are the sub projects of a construction project?
Lime soil, sand and gravel foundation, geosynthetics foundation, fly ash foundation, dynamic compaction, foundation grouting, preloading foundation, vibroflotation foundation, jet grouting foundation, cement mixing pile foundation, soil and lime soil compaction pile foundation, cement fly ash gravel pile, cement soil pile foundation. Based on sand pile foundation

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords