• Casting Elbow R180 90DGR Schwing Putzmeister Sany Zoomlion System 1
  • Casting Elbow R180 90DGR Schwing Putzmeister Sany Zoomlion System 2
  • Casting Elbow R180 90DGR Schwing Putzmeister Sany Zoomlion System 3
  • Casting Elbow R180 90DGR Schwing Putzmeister Sany Zoomlion System 4
  • Casting Elbow R180 90DGR Schwing Putzmeister Sany Zoomlion System 5
Casting Elbow R180 90DGR Schwing Putzmeister Sany Zoomlion

Casting Elbow R180 90DGR Schwing Putzmeister Sany Zoomlion

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 pc
Supply Capability:
10000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Concrete pump elbow for  Schwing Putzmeister Sany Zoomlion 

Casting Elbow R180 90DGR 

1.We are a factory which producing concrete pump parts , and we have done many years in the factory with rich experience, the main products include concrete pump pipe, concrete pump elbow, concrete pump reducer pipe, concrete pump flange, piston, rubber hose, sponge cleaning ball, wear plate, cutting ring etc.

 

2.Our products are Top quality in china which can be used on SCHWING,PM,KYOKUTO,SANY,ZOOMLION

and have been recognized by them.

3.Quality certification of ISO 9001:2000. OEM service available.

 Specification

1>Material:ST52,20#steel,45Mn2 or as per to your requirements

 

2>Types:our concrete elbows mainly include single wall elbows, double layer(twin walls) elbows,wear-resisting elbows, advanced technology, work life long.

 

3>A wide range of specifications for you.

 

Concrete Pump Pipe Elbow

Type

Singe Elbow

Double Elbow

Model

DN125

DN150

DN175

DN125

Material

Casting Steel ,ST52,20# steel,45Mn2

Inside

40Cr

Outside

Size

R275*90°

R275*90°+110

36°

F2000

R275*90°

R275*90+110

R275*45°

R275*90°+211

R400*30°

A3000

R275*45°

R275*90+211

R275*25°

R275*90°+411

R400*45°

471B

R275*25°

R275*90+411

R275*20°

R275*90°+424

R400*30°

571B

R275*20°

R275*90+424

R275*15°

R275*45°+170

R488*90°

A1000

R275*15°

R275*45+170

R180*90°

R275*45°+310

R500*90

C1000

R180*90°

R275*45+310

R232*60°

R275*45°+310

R280*90°

B2000

R232*60°

R275*45+310

R240*36°

20°Lengthen

R240*36°

20°Lengthen

R240*30°

25°+740

R240*30°

25°+740

R240*15°

40°Zoomlion

R240*15°

40°Zoomlion

R385*29°

R385*29°

R315*33°

R315*33°

Technic

Forged,Casting

Average life

25,000cubic

50,000cubic

Appliciation

Used in concrete transport in construction work.

 

  

    

 

    

 

 

 

 

Q:How to determine the concrete pump truck blocking the site
S pipe valve is blocked gradually formed, the main reason is that after pumping the finished product concrete, there is no timely use of high pressure water rinse, resulting in commercial concrete residue in the S tube, the course of time gradually thickening, accumulation consolidation, causing clogging.
Q:What is the difference between a concrete day pump and a ground pump?
Motor concrete pump current domestic brands: three one, in the joint, pump tiger, Cornelian, Chutian, Broadcom, good Seoul, heaven and earth heavy industry, the public together, Hong profit, Hainuo and so on.
Q:What is the diameter of the concrete pump tubing?
Pump tube is generally divided into 125 and 150 two, diameter is 125mm and 150mm.
Q:Why concrete pump down to play always block the tube
Second, encountered the material to be expected or the process of removal of the pipe, a long time do not charge the material, etc. every 5 minutes or so will reverse the pump a few times to prevent the concrete pipe.
Q:What is the use of micro-concrete pump?
Applicable to the construction of railway, highway tunnel, culvert, culvert, culverts, bridge holes and other structures, large-scale group building construction column pouring, including those water conservancy projects, hydropower projects, slope support, underground construction operations, the basis of filling works
Q:What is the maintenance method of concrete pump?
2) Before the operation should be checked to confirm the electrical equipment and instruments normal, the various parts of the switch button, the handle are in the correct position, the mechanical part of the fastening point of solid, reliable, chain and belt tightness to meet the requirements of the transmission parts of the normal operation.
Q:How to install concrete pump
4, carefully check the boom pump and the main pump, constant pressure pump inlet valve is open.
Q:What measures should be taken in the construction of the underground garage
2. In the garage top two beams below the increase in a large number of support column.
Q:How to prevent concrete pump blockage
Concrete or mortar segregation: wet water pipes before the pump, from the lowest point of the pipe pipe joints will be released, the remaining water will be let go, or pump water, pump mortar before, put a sponge ball, the mortar and water separated.
Q:How much concrete construction is needed for concrete pump construction
The pump body installed in the car chassis, and then equipped with retractable or inflected cloth rod, the composition of the pump.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords