• Telescopic Boom Lift-GTBZ20 System 1
Telescopic Boom Lift-GTBZ20

Telescopic Boom Lift-GTBZ20

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
500 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Telescopic boom lift--20m:

 

Item

Measurement

Item

Measurement

Dimensions

Productivity

Overall length(stowed)

9.18m

Platform height max.

20.6m

Overall width(stowed)

2.49m

Working height max.

22.6m

Overall height(stowed)

2.8m

Horizontal reach max.

17.3m

Ground clearance

0.31m

Turntable rotation

360 continuous

Wheelbase

2.49m

Platform rotation

160

overall weight

11165kg(2WD)

Platform capacity

250kg

Platform Size (L*W*H)

1.83*0.76*1.1M

Gradeability

30%(2WD)

Platform levelling

Automatic

Turning radius(outside)

4.97m

Tire specification

9.00-20

Turning radius(inside)

1.66m

Tire type

Solid

Turntable tailswing

1.32M

Power

Max. Driving Speed

6.3km/h

Hydraulic tank vol.

170L

Driving Speed (stowed)

0~6.3km/h

Hydraulic system vol.     

270L

Driving Speed (extended)

0~1.1km/h

Fuel tank vol.

125L

Max allowable wind force

12.5m/s

Control voltage

24V DC

Max allowable slope

3��

Engine

Original Cummins

Max noise on normal use

82dB(A)

Drive & steer model

2WD*2WS

Max allowable side force

400N

Q:Construction basket for hanging basket
Suspension platform: suspension platform is the working area of construction personnel. He is composed of high and low railings, basket bottom and hoist mounting frame. The four parts are assembled by bolts
Q:Construction plan for mounting basket on steel pipe support frame
On the steel pipe support frame, according to the mounting basket and the ordinary outer wall, the construction and the mounting basket method is same. Only in the steel pipe bracket to install the basket, should pay attention to avoid the steel pipe support, avoid the steel pipe support, influence the rise and fall of the electric basket. Thus affecting the normal work of the electric basket
Q:Construction basket operation certificate is not able to operate?
3, basket must have clear, eye-catching, durable signs. The product name, main technical performance, date of manufacture, serial number, manufacturer and so on shall be clearly stated on the sign. 4, basket must have equipment rental units, lifting equipment, installation units, such as the qualification certificate, business license, safety production license, inspection certificate, and should be registered with the construction administrative departments. It must be checked by the legal department before it can be used.
Q:What kind of hanging basket can be used for external wall construction?
Glass curtain wall engineering refers to cover the walls with tempered glass tempered glass with good mechanical properties of the seismic performance of heat-resistant glass; toughened glass broken pieces to achieve extremely was acute body damage reduction; toughened glass with a good thermal stability to meet the building environment temperature changes, sunshine, indoor and outdoor heating or air conditioning, shading and thermal shock conditions
Q:How much is the basket length of the hanging basket?
6 meters or 7.5 meters. Is currently the most common configuration, there are three main equipments: A, ZLP630, rated load is 630KG, the working platform length is 6 meters (assembled, according to different requirements, free combination) is mainly suitable for exterior paint, repair, cleaning and other low load operation amount.
Q:The ratio of the maximum overturning moment of the overturning moment and the rated load capacity of the suspension platform to the center of the overhang of the suspension platform shall not be less than that of the suspension platform
5 basket should be equipped with overload protection device. The 6 is provided with a manual device in the cradle must be downhill when power suspension platform steadily decreased. 7, under normal working conditions, the ratio of overturning moment and overturning moment of suspension mechanism of suspension basket should not be less than 20.
Q:Request a basket construction quota
The use of construction basket wall repair and brushing the wall paint, how to calculate the cost of measures (experts). According to the actual situation, the selected quotations, such as scaffolding construction, construction measures should apply scaffolding quota items. Such as hanging basket construction, it should be calculated by the use of basket construction measures
Q:How to use the hanging basket properly and up and down normally, speed and anti tilt
Elevator is how to prevent the hoisting machine in the operation of wire rope phenomenon, mainly has the following points. Check the power supply of the hanging basket every time before building external wall construction work. Main check whether the entrance of hoisting machine has sundries, cement or granular sundries to enter. If sundries come between the rope driver and turbine, it will cause the sticking phenomenon in the process of hanging basket rising
Q:Construction basket often said that the need for two people to operate, then, coupled with my general type of work, that basket will be able to four people?
Hanging basket is a kind of hanging lifting machines and tools. In the construction of hanging basket, it must strictly abide by the safety rules, so as to make it safe and reliable. The double lifting basket must have more than two persons to perform the operation, and no single entry operation is prohibited. Hanging basket on several people, many people, inconvenient operation, is strictly forbidden to operate alone, more than two people on the line.
Q:There is a dry stone hanging project on the exterior wall. Hanging basket needs many mobile installation, each installation should be tested?
Hanging basket construction is a dangerous height work. The safety and reliability of equipment shall be tested with a qualification in play, installation, use before the construction plan approved by the relevant departments of the enterprise safety, audit, corporate chief engineer group signed to belong to more than a certain size, according to the provisions of the construction quality of [2009]87#, but also by the group of experts through demonstration

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords