• Biggest HVAC Flexible Duct Factory Flexible Hose Factory System 1
  • Biggest HVAC Flexible Duct Factory Flexible Hose Factory System 2
  • Biggest HVAC Flexible Duct Factory Flexible Hose Factory System 3
  • Biggest HVAC Flexible Duct Factory Flexible Hose Factory System 4
Biggest HVAC Flexible Duct Factory Flexible Hose Factory

Biggest HVAC Flexible Duct Factory Flexible Hose Factory

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
500 PCS
Supply Capability:
100000 PCS/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Product Description:

Features and Characters of Aluminium Flexible Duct ing:

-Applied in Heating, Ventilation and Air Conditioning

-Non-insulated and insulated Flexible Duct offered

-Up to 150 and 250 high temperature



Description of Aluminium Flexible Ducting

Flexible Duct is widely used in Heating, Ventilation and Air Conditioning (HVAC) systems for air ventilation applications. Flexible Duct provides greater thermal efficiency to save energy. The product is also covered in a heavy duty, silver jacket for durability. The vapor barrier prevents condensation forming on the outside of ducts carrying air. Because it is flexible, it is easy to run around and through obstacles in the building. 

Specification of Aluminium Flexible Ducting:

Non-insulated Flexible Duct: Structure: Two-layer aluminum foils +1 layer of PET film.

Insulated Flexible Duct: Structure: 1 layer of Alu. Foil+1 layer PET film+ glass wool  Outer jacket: 1 layer of Alu. foil  Glass Wool Density: 16kg/m3; Thickness: 25mm

 

Pictures of Flexible Ducting:

Biggest HVAC Flexible Duct Factory Flexible Hose Factory

Biggest HVAC Flexible Duct Factory Flexible Hose Factory

 

FAQ of Aluminium Flexible Ducting:

1.             What temperature maximum? Our products: 150 and 250

2.             What MOQ? Our MOQ: 500 pcs

3.             What payment terms? We accept T/T and L/C

4.             Lead time: 10 days

5.             Packing: Nest packing for non-insulated flexible duct, then into plastic bag for   non-insulated flexible duct or packed in individual carton box.

Q: If I feel the room cool off, one hour hot and open an hour this will be more expensive? More
But after all, is the master you want to Zhuo good jade is certainly a lot of difficulties, whether it is Longfeng Pei or other subject matter need a lot of effort in addition to the need for technical research also need to continue to learn theoretical knowledge, especially
Q: Air to water heater host and air conditioning host is not the same
Issued a test report, Detection can be used to pass, failed to use!
Q: Air conditioning ventilation when the sound is a big reason
No matter, it is best to cut the distance between the material and the roof, like an arbor. Otherwise it is not foam board with it
Q: Gree air conditioning 50 heating and cooling mechanism heat when the host cooling network is how the matter
Not the ,,, mobile air conditioning inside the compressor, the winter heating also need the compressor, but also a ventilation pipe, charged heating Well?
Q: Do 3cm thick wall insulation how much kilogram of slurry and how many kilograms of polystyrene particles
Of course, is heating electricity. Heating has auxiliary electric heating, so electricity and electricity. Frequently open the fee, the air compressor is not good. 2 machine cooling power is 1700 watts, 1 hour is 1.7 degrees electricity. Heating with auxiliary electric heating power of 1500 watts, 1 hour is 3.2 degrees electricity.
Q: I added the space 18 degrees opened for 5 hours or not cold, we all know how is it? More
The general level of more than 12 layers when you need to use.
Q: External wall insulation method of operation There are several combinations of materials
Seeking the existing building construction specifications Daquan! The The @
Q: Ventilation is very good, why still have to install fresh air system
You are a single raft toilet wipes Pie Tanzhuang open card would like to confirm what? Contract notarization or. The The If it is contract notarized, generally notary value of 0.25% -0.3%
Q: In the design, the building structure and the hydropower are generally designed by the Architectural Design Institute. The air conditioning ventilation is based on the design of the room. Or first air conditioning ventilation? More
Decoration refers to the home improvement part, housing construction is the content of the building
Q: HVAC Heating: What are the main components of the air distribution system?
Geothermal construction, the heating pipe spacing can not be less than 100mm, the construction can not be achieved, big brother!

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords