better than aluminium formwork system, structural concrete insulated panels for home construction

Ref Price:
Loading Port:
Ningbo
Payment Terms:
TT OR LC
Min Order Qty:
100 m²
Supply Capability:
10000 m²/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Plastic Formwork Construction formwork  plastic concrete formwork

Saving your time, money and energy !!!

 

better than aluminium formwork system, structural concrete insulated panels for home construction

What is Details of our products Plastic Formwork Construction formwork plastic concrete formwork ?

Features:

1. Long lifespan& Cost effective -- Plastic formwork can be reused over 100 times,

where  Plywood can only be reused 3 to 5 times. Therefore the Plastic Formwork

is more cost effective.

2. Waterproof --  As the nature of plastic material. It's imputrescible and rustless,

especially suitable for underground and watery circumstance.

3. Interlocking Design -- No release agent needed, good effect of demolding.

4. Easy deassembly -- The template will be separated easily from concrete 

5. Simple Installation -- Light weight and safe to handleeasy cleaning and very robust.

6. High Quality -- Abrasion resistance, excellent mechanical property, best impermeability. 

7. Recycable -- Waste scrap molding board could be recycled.

What is Advantages of our company ?

Our anvantages

 

High quality

Reasonable price

Strict delivery time
Good after-sales service

Profession maker for 21 years

Gold supplier 9th year

Strict quality control

professional injection mould
3D design

Product Photos/ Plastic Formwork, Construction formwork, plastic concrete formwork

better than aluminium formwork system, structural concrete insulated panels for home construction

better than aluminium formwork system, structural concrete insulated panels for home construction

better than aluminium formwork system, structural concrete insulated panels for home construction

better than aluminium formwork system, structural concrete insulated panels for home construction

better than aluminium formwork system, structural concrete insulated panels for home construction

better than aluminium formwork system, structural concrete insulated panels for home construction

better than aluminium formwork system, structural concrete insulated panels for home construction

better than aluminium formwork system, structural concrete insulated panels for home construction

FAQ:

1.Q:Are you a factory or trading company? 
A: We are a factory of plastic formwork.

2.Q:Where is your factory located? How can I visit there? 
A: Our factory is located in Taizhou City, China.You can fly to Ningbo airport directly.All our clients, from home or abroad, are warmly welcome to visit us!

3.Q:How can I get some samples? 
A: We are honored to offer you samples.

4.Q:How does your factory do regarding quality control? 
A:"Quality is priority. we always attach great importance to quality controlling from the very beginning to the very end. Our factory has gained ISOTS16949  authentication.

Why Choose us?

We are China Leading Moulding Manufactuer

Inspected by the Inspection Institution of Bureau Veritas Certification.

100% QC inspection Before Shipmeng.

Best Quality & Best Service with Competitive price.

How to Contact Us?

If you are interested in our plastic formwork , please feel free to contact with us by email. We will quote you the best price, if you have drawings, we can help you caculate the quantity of plastic formwork .

 

Any building drawings is OK, just send us your drawing, we can make the plastic formwork  quantity for you.

 

And we warmly welcome friends from all over the world to visit our factories for business.



Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Why is the building template made 1830mm * 915mm and not made 2000mm * 1000mm it?
You can do that kind of ah! Raw materials are not easy to find
Q:Plastic construction template has no one used?
By our site identification: hollow plastic building templates to protect the case of the use of 50 times is not a problem, even more than 50 times. Not capped Plastic non-stick cement. You know.
Q:Why the floor is not plastic building materials square wood and template
Not people do not have this product is not humane is not perfect not to buy only to be used to solve the trouble of the workers with the boss's doubts
Q:How is the plastic building template?
4. The product pouring concrete surface smooth, bright as a mirror, to meet the requirements of decorative and decorative water, eliminating the need for secondary plastering process. 5. Turnover times more than 50 times, the template each time the amortization cost is less than 3 yuan, steel frame plastic template turnover times more than 300 6. The material is non-toxic, harmless, pollution-free, 100% recovery, green products The 7. The product acid, alkali, anti-corrosion performance. Product use temperature of -80 ℃ ~ 100 ℃, good weather resistance.
Q:I heard that plastic construction template workers do not want to use, there is such a situation
The quality of the building template is relatively strong, compared to the cost is also higher. hope this helps!
Q:Will the plastic building template on the builders really do not use the price is how much price
Easy to use, heat insulation. A lot of building materials market there ah, to see what you want the model, the price range,
Q:Who used plastic building templates? How is the effect? What are the advantages and disadvantages?
The main advantages are:1, the surface smooth and smooth, high strength, the provincial workers, the expected material, can meet the requirements of clear water concrete template, after stripping without cleaning the surface of the template, thus saving a lot of labor, template flatness can be controlled within 0.3mm, thickness uniformity, Can be controlled within ± 0.3mm, wood than the wood to save 2/3 of the nails.2, good water resistance, toughness, long-term immersion is not layered, water swelling rate of less than 0.06%, in -30 ℃ _ +60 ℃ range of normal use, the use of 6 years of aging of 15%, normal use of 8 Years or more.3, plasticity, according to the design and component size requirements, processing and production of different shapes and different specifications of the template, a curvature of the template for the production of a more simple template can be drilling nails, saws, planing and other wood mold with the same machinability , On-site stitching simple and convenient.4, recyclable use, plastic template to a certain extent can be fully recycled, regardless of the size of the old and new, after processing, can be added to produce a new template
Q:Types of building templates? What is the water template?
With the development of the economy, the emergence of new materials in the building materials industry, the increasing number of types of building classification, there are four types of building templates
Q:Shear wall plastic template for the wall height and thick ratio requirements is how much?
Plastic building template to be extended when the expansion joints: As the plastic building template than the steel mold, wood mold thermal expansion coefficient larger, morning and evening laying plastic template must be reserved for about 2 mm expansion joints (according to the size of the day the temperature difference ), No need to reserve the expansion of the slit at noon. The length of the nail is generally 1.5 inches to 2 inches is appropriate, not too long or too short.
Q:What is the quality of plastic building templates?
Why can not, now the plastic template, called light building materials, China is not yet a few plants can do a good job, after the air-conditioning refrigerator to use this, light and hard, not you like this, you can do with the wall, Now high-end are imported.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range