Anti Theft Screen Window and Door Manufactory
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 5000 set
- Supply Capability:
- 100000 set/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Specifications for Anti Theft Screen Window and Door
Mesh Material: stainless steel wire 304,316,316L.
Wire diameter: 0.60mm, 0.70mm, 0.80mm, 0.90mm
Color: black powder coated, white powder coated, yellow powder coated, graypowder coated and other color can be made according to customers’ detailedrequirements
Other special size and color is also available.
Description for Anti Theft Screen Window and Door
Anti-theft,anti-insect and ventilation performance..
Stainlesssteel security screen Product description: It is transparent and makeyou have no sensation. Form inside look outside is transparent colored glass,from outside to inside is hazy and dimness.
Feature for Anti Theft Screen Window and Door
Smooth surface, mesh number of standard,latitude and longitude curve is consistent, its salient features hard likeiron, is against theft, bulletproof, home of choice for workplace safetyprotection.
Transmission of light is verygood, .Form inside look outside is transparent colored glass, from outside toinside is hazy and dimness. can build the illicit close space, safe andcomfortable for you at the same time can block mosquitoes enter indoor, is thebedroom and office warmth, security, prevent theft, bulletproof preferred products.Commonly referred to as metal doors and Windows network security protection.
Picture for Anti Theft Screen Window and Door
- Q: Metal screens can be used how to stick ah.
- 1. Use dry cloth or sandpaper will be followed by the surface of the dust, oil, rust, etc. to remove, and then acetone or trichlorethylene and other cleaning agents to clean the surface to clean. (A: B = 2: 1); in order to ensure the use of the effect, but also pumping a vacuum and then use the same, in order to ensure the use of the effect, The 3. Note that the use of time must be used within the run out, or will be solidified, resulting in waste of material, 24 hours after the maximum strength. 4. After coating at room temperature 2 to 6 hours curing 40 degrees to 50 degrees 1 to 3 hours curing; glue 24 hours after use; ten days after the sticky better. Cold and wet days, need 15 to 25 degrees room temperature bonding as well. 5. Adhesive face. After pouring the surface. After the glue must be sticky paper stickers. Or 502 glue positioning. Epoxy Resin Adhesive Epoxy Resin AB is made of epoxy resin based two-component high temperature adhesive, mainly for high temperature metal, ceramic and other adhesive. The use of temperature operating temperature of -50 ~ + 180 ℃, short-term up to +250 ℃.
- Q: Non-metallic windows, how to prevent the side of the mine
- If the roof has lightning protection measures, then do not worry about the windows will be struck by lightning. Do not worry.
- Q: What is the difference between the external wall and the door and the wall? Feeling the same ah
- The use of building natural grounding device for grounding, grounding resistance requirements are the same.
- Q: How to learn metal doors and windows by looking at the map
- Look at the node map, mainly practice Caixing
- Q: Metal doors and windows project what acceptance criteria
- Metal doors and windows, noise doors and accessories and glass varieties, specifications, quality, must meet the design requirements and the relevant provisions of the current national standards. Metal doors and windows, soundproof door installation location, opening direction and the noise barrier compartment standard must meet the design requirements. Test methods: observation, testing and inspection.
- Q: Do metal doors and windows project, do a more convenient, want to know the process and time
- Contracted Project Scope: First-class enterprises: can undertake all kinds of aluminum, steel and other metal doors and windows construction of the project. Second-level enterprises: can bear the amount of individual contract does not exceed 5 times the registered capital of the following aluminum alloy, steel and other metal doors and windows construction of the project: 1,30 layers and the following buildings of the metal doors and windows works; 2, an area of 8000 square meters and below the metal doors and windows works. Three enterprises: the amount of individual contract can not bear more than 5 times the registered capital of the following aluminum alloy, steel and other metal doors and windows construction of the project: 1,10 layers and below the building of the metal doors and windows works; 2, an area of 4000 square meters and below the metal doors and windows works.
- Q: High-rise commercial housing metal doors and windows how to leave the ground? And can not be steel out of the wall paint what are the brush. Most of the balcony of the metal railings are not received
- You have to look at the general requirements of the drawings, if there is a requirement you do not do is your responsibility, if the design is not required, is the design of the responsibility.
- Q: Construction general contracting special qualification can contract metal doors and windows project?
- Construction general contracting special qualification is to contract metal doors and windows works
- Q: Metal doors and windows do not include steel doors and windows
- Should not, metal doors and windows are not included steel doors and windows.
- Q: Metal doors and windows generally taxpayers can declare a simple levy?
- General taxpayers choose a simple way to calculate the value-added tax, 36 months may not be changed.
Send your message to us
Anti Theft Screen Window and Door Manufactory
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 5000 set
- Supply Capability:
- 100000 set/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords