Aluminum Formwork system with Scaffolding Support System
- Loading Port:
- Tianjin
- Payment Terms:
- TT or LC
- Min Order Qty:
- 50 m²
- Supply Capability:
- 1000 m²/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1.Structure of Aluminum Formwork System
Formwork is the term given to either temporary or permanent molds into which concrete or similar materials are poured.
In the context of concrete construction, the falsework supports the shuttering moulds.
2. Main Features of Aluminum Formwork System
◆ Lighter weight but high bearing capacity.
◆ Manual transportation can be achieved, greatly reduces the aggregate cost.
◆ Perfect design, excellent produce and well welding make sure the flatness of concrete
surface.
◆ It is with the advantages of standard design, excellent applicability and interchangeable.
◆ Simple, safe and fast.
◆ No rust corrosion, easy maintenance, and high turnover rate.
◆ The formwork series are a complete system with a full set of accessories, and can be
set up flexibly according to project.
3.Aluminum Formwork Images
4.Aluminum Formwork Specification
5. FAQ of Aluminum Formwork System
1)What promises can be done by us?
If interested in Aluminum Formwork, please feel free to write us for any QUOTE. If printing required, please advise asap because the whole set need much more time to complete. Please DO check goods when courier knocks your door and contact us asap if any issue.
2) What about of our after-sale service?
Response will be carried out in 24hours after receiving any complain or request.
Aluminum Formwork cost can be refund after order is confirmed.
If the products are not based on the requirements, there will be the relevant compensations made for you.
3) What about the package and shipping time?
Packing: As Customer's Requirements
Shipping: We have various shipping ways for our customers, such as express which including TNT, DHL, FEDEX, UPS, EMS, etc. ; by air/ sea, and we are VIP of these express.
Shipping time:
Normally small orders, it just 10-15 business days to arrive your hand; When comes to the customs declaration, it may need 7 days. Other mass qty of Aluminum Formwork, we send them out by sea or by air to sea port or air port to save some shipping freight for our customers. By ocean, it may need 45~60days, by air, it may need 25~40days.
- Q: What is the development prospect of aluminum template design?
- I estimate that the next three years, to do the aluminum alloy template design is still very popular, but I still recommend not to circle their own in the aluminum template design circle, because the industry is really small .... technology is mutual Plagiarism (I do not have heart burst shady), if he really want to be a designer, I recommend to the road to the building to go ....
- Q: In the Sheng-aluminum template installation workers, how to develop prospects
- Can go to feel, the elimination rate is very high, most of them are left, remember: have the strength to be able to endure hardship, to listen to Sheng Sheng, if you do not need special money, and physical fitness is not good, labor intensity More than your imagination
- Q: What is the change in the aluminum template?
- Advantages of aluminum alloy template: 1. Construction period is short: aluminum alloy building template system for the quick-release mold system, a set of normal construction of the template can reach four or five days a layer, greatly saving the construction unit management costs (currently under construction project in Macau - TN27 public housing construction up to Three days a layer). (6063-T6 or 6061-T6), a set of template specifications can be used to reverse the use of 300-500 times the use of aluminum alloy profiles, the use of aluminum, Above, the average use of low cost. Easy construction, high efficiency: aluminum alloy building template system assembly is simple, convenient, the average weight of 30KG / m2, completely by the artificial assembly, do not need any mechanical equipment assistance (workers usually only need a wrench or a small hammer, convenient ), Skilled installation workers can install 20-30 square meters per person per day (compared with the wooden mold: aluminum mold installation workers only need to install wood workers 70-80%, and do not need skilled workers, just before the installation of the construction Personnel can carry out simple training). Good stability, high bearing capacity: aluminum alloy building template system all parts are made of aluminum alloy plate assembly, the system assembled to complete the formation of a whole frame, the stability is very good; bearing capacity can reach 60KN per square meter.
- Q: Now the domestic use of aluminum template project more?
- 1, the construction period is short 2, can be reused many times, the cost of compression costs 3, the construction is convenient, high efficiency, easy to install 4, good stability, high bearing capacity, environmental protection, energy saving,
- Q: Whether a shear wall aluminum template and wood template can be mixed
- Wood molds are low in strength, poor in stability, low profile, low precision, high water loss, high maintenance requirements when the mold surface is released, the time is fixed, the mold time is late and the load capacity is small.
- Q: Aluminum template of the aluminum template advantage characteristics
- Good stability, high bearing capacity. Most of the aluminum template system bearing capacity of up to 60KN per square meter, enough to meet the majority of residential buildings supporting capacity of the support capacity. Wide range of applications. Aluminum template for wall, horizontal floor, pillars, beams, stairs, windowsill, floating plate and other locations of the use of the ring beam, structural columns, anti-kan and other secondary structure model is still useful. Patchwork less, high precision, demoulding concrete surface effect is good. After the demolition of aluminum construction template, the concrete surface quality is smooth and smooth, basically can meet the requirements of finishes and water concrete, without the need for batch, can save the bulk of the cost.
Send your message to us
Aluminum Formwork system with Scaffolding Support System
- Loading Port:
- Tianjin
- Payment Terms:
- TT or LC
- Min Order Qty:
- 50 m²
- Supply Capability:
- 1000 m²/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords