• Aluminum Foil  Tapes with Water based acrylic T-F5004WP System 1
Aluminum Foil  Tapes with Water based acrylic T-F5004WP

Aluminum Foil Tapes with Water based acrylic T-F5004WP

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

ProductDescription

A aluminum foil with water based acrylicadhesive. It has good adhesion. Ideal for wind-pipe’s heat preservation of refrigerator and air-condition.

Product Construction

Carrier :Aluminumfoil,alloy: 8011 O

Adhesive glue: A high performance waterbased acrylic

Silicon paper: A white kraft paper, on aside laminated with film PE and coating solvent silicon.  75gram/sm.

TypicalPhysical Properties

PROPERTIES

UNITS

VALUE

TEST METHOD

Backing  Thickness

mm

0.050

PSTC-133 / ASTM D3652

Total  Thickness

mm

0.090

PSTC-133 / ASTM D3652

Adhesion to  Steel

N/25mm

≥12

PSTC-101/ ASTM D3330

Tack Rolling  Ball

cm

20

PSTC-6 / ASTM D3121

Holding power

min

≥1440

PSTC-107/ASTM D3654

Tensile  Strength

N/25mm

75

PSTC-131 / ASTM D3759

Elongation

%

3.0

PSTC-131 / ASTM D3759

Service  Temperature

-10~+110

————

Applying Temperature

+5~+60

————

Product Form & SizeAvailable

Cut Roll: 48 / 50mm (2") / 60 / 63mm (2.5") / 72 / 75mm (3") / 96mm / 100mm(4").

Log Roll:  1020mmx 45 / 50m                Jumbo Roll: 1020mm x 1200m / 1350m

Custom widths and lengths available, contact us forspecifications and requirements

Tolerance:Weight and Thickness: ±10%; Width: ±2mm; Length: Cut Roll: ±0.3m, Jumbo Roll ±0.5%.

The physical and performance propertiesshown are averages obtained from tests recommended by PSTC. A particular rollmay vary slightly from these averages and it is recommended that the buyerdetermine the suitability for his own purposes.


Q:HVAC Heating: What are the main components of the air distribution system?
The reasons are the following: 1. Household electricity is not enough, can not start the compressor, so in the heating state can only be ventilated state, cooling the state directly jump electricity; 2. See if you are reported failure, Code to determine the need for on-site inspection in order to know the specific situation; 3. Four-way valve should be no problem, do not just believe that this is the problem Oh; help your words to adopt
Q:Such as the problem, and now air-conditioning technology is mature, the market a lot of air conditioning are cold and warm, and I would like to be able to put my home that the end of the century loaded Mitsubishi air conditioning (split single cold) into a cold Before the conversion of ordinary TV to the remote control, that air conditioning can be modified? How much does it cost? Where is this technology? More
So good, then you recommend more. Give an address. You are not layman, too modest.
Q:Air conditioning ventilation when the sound is a big reason
Buried plastic pipe under external load, the diameter of the vertical diameter deformation rate should be less than the allowable diameter of the pipe deformation rate The diameter of the allowable diameter of the pipe shall not be greater than 5% The diameter deformation rate of the pipe and the allowable diameter deformation rate are calculated as follows: ε ΔD / D0 × 100% [ε] ε0 / K where: εΔD pipe in the combined load (Mm) [ε] Permissible diameter Deformation rate ε0 Elastic diameter Deformation rate (%) of pipe, by the flattening of the diameter of the pipe diameter (mm) The test determines the K safety factor, generally desirable 15
Q:Air conditioning machine work when the sound is too much reason
Many of the good quality of the model, of course, bear some of the larger. Common scaffolding brackets are U-type care, "construction fastener steel scaffold safety technical regulations" (JGJ130-2011) provides "adjustable support bearing capacity design value should not be less than 40kN, support plate thickness should not be less than 5mm ", the general calculation using 30kN. Not to say how fast buckle steel scaffold can bear the load, but according to how much load to calculate how scaffolding erection. Need to be calculated. In the "construction of fasteners steel scaffold safety technical specifications" provides instructions. Double fastener (anti - skid) bearing capacity design value 3.2KN. Right angle fastener, rotary fastener (anti-skid) bearing capacity design value 8KN.
Q:External wall insulation method of operation There are several combinations of materials
30-150 per square meter has, mainly to see the material, thickness and so on
Q:Gree air conditioning 50 heating and cooling mechanism heat when the host cooling network is how the matter
Extruded board of course, can generally use this to do, indoor and outdoor to do almost, most of the outside is done because of saving space inside the room. Recommended: do indoors, because I was doing the external walls, the insulation often do, the wall is not very good for the first time, because you do before the insulation wall itself is the weight of the valve valve closure of the bone shop stall wipes , Benzene board sticky benzene board is not very strong, live well for a few years, bad two or three years there will be signs of shedding, looking twice thinking.
Q:Ventilation is very good, why still have to install fresh air system
Also known as foam board, EPS board, is containing volatile liquid blowing agent of the polystyrene beads can be preheated by heating, heated in the mold and the formation of white objects
Q:If I feel the room cool off, one hour hot and open an hour this will be more expensive? More
No, polycyclic aromatic should be anthraquinone This is certainly not all of the hydrocarbons are carcinogenic
Q:What is the whole heat exchange fresh air ventilator?
Depends on the main control panel is not cold and warm, single cold common motherboard. Only a generic motherboard can be changed. In the single cold air-conditioning on the outdoor machine to install the appropriate specifications of the four-way valve, adjust the amount of refrigerant to the appropriate level can be.
Q:Air to water heater host and air conditioning host is not the same
Issued a test report, Detection can be used to pass, failed to use!

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords