Is foam concrete suitable for use as a cushion?
The foamed concrete is a foaming system through a foaming machine that allows the foaming agent to be fully mechanically foamed and the foam is mixed evenly with the slurry.
Is the raft cushion waterproofing full of the cushion?
The request is full. Raft foundation do not do waterproof mainly depends on the design of the groundwater level considerations, calculated if the floor itself to meet the requirements, you can not do, and not rigid to do.
Basement floor mattress dry to what degree can do coil waterproof?
Pull a square coil, tiled on the floor above, in the case of the sun, the sun shines on half an hour, in turn, look at the coil, if no water to prove that the water content is not large, that can be construction.
What is the relationship between the cushion and the ring beam?
Ring beam is reinforced concrete. Is to increase the overall wall and overall stiffness, improve the side resistance performance, according to the earthquake or masonry specifications set. There may be in the ground wall, there may be in the underground wall.
Do you need a cushion for roof waterproofing?
Where the process (such as waterproof material construction, floor construction, equipment installation, etc.) on the grass-roots level have certain requirements, must be grass-roots leveling treatment, in the project, commonly used leveling method is to use a certain strength of cement mortar or Fine stone concrete leveling.
Can the cushion on the prefabricated board floor be dug?
Prefabricated board floor layer of cement layer is not called the cushion, should be called leveling layer, this layer can be removed, but be careful not to damage the prefabricated plate.
Why calculate the amount of time to count a lot of cushion ah
In the building construction refers to the base is located below the cushion sometimes also served as grassroots. With the cushion, in the above work is convenient, clean, especially the mold, bar reinforced, pouring concrete and other processes, will not be affected by the basic earth pollution. Set the place where the cushion is generally based, floor, roof (slope) and so on.
Maintenance time of the cushion on the roof of the building
According to the "concrete structure construction quality acceptance criteria" provides: Concrete should be poured within 12h after the completion of the concrete to be covered, and moisturizing conservation;